ML19324B738

From kanterella
Jump to navigation Jump to search
Advises That Changes & Revs to Chemistry,Environ & Operations Procedures Will Be Issued Prior to Fuel Load in Response to Unresolved Item 445/8957-U-02
ML19324B738
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 11/01/1989
From: Woodlan D
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
TXX-89796, NUDOCS 8911080117
Download: ML19324B738 (1)


Text

__

-_r L

y; Log # TXX 89796

i..

File # 10130 L

r

=

IR 69 57 l

Ref. # 10CFR2.201 1RIELECTRIC t

November 1, 1989 WEben J. Cahut. Jr.

knutur Vur huulent U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D. C.

20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50 445 AND 50 446 NRC INSPECTION REPORT NO. 50 445/89 57: 50 446/89 57 REVISED COMPLET!ON SCHEDULE FOR UNRESOLVED ITEM REF:

TV Electric letter. TXX 89721, from W. o. Cahill Jr., to USNRC dated September 27, 1989 Gentlemen:

The referenced letter provided TV Electric's response to Unresolved item 445/8957 U 02.- The response stated that by November 1, 1989, changes and revisions to Chemistry and Environmental, and Operations procedures to correct format and administrative errors would be issued and that elements from the procedure review checklists would be incorporated into departmental administrative procedures.

Issuance of these changes and revisions has taken longer than expected. These procedure changes and revisions will be issued l

prior to fuel load.

Sincerely, i

William J. Cahill, Jr.

1 BY D. R. Woodlan, Docket Licensing Manager DAR/cp c - Mr. R. D. Martin, Region IV i

Resident Inspectors, CPSES (3) i O

8911080117 891101

" ^** **Pt2

,]a pol

> o i

P. O. Box 1002 Gkn Rose. Texas 76043-1002

_ _ __ _ _