hf Comm:nw:lh Ediscu O'
=
(gu Ona First National Plan Chicago, filinois B 0 'M M i: 130
'S Addr*,ss Rep'y to Post O!5ce Box 767 Chicago, liiincis 60690 a
April 24, 1980 Mr. B.
K. Grimes, Program Manager Emergency Preparedness Program Office Of fice of Nuclear Reac;o* Regulation U.S. Nuclear Regulatory Lammission Washington, DC 20555
Subject:
Generating Stations Emergency Plan Dresden Station Units 1, 2 and 3; Quad Cities Station Units 1 and 2; Zion Station Units 1 and 2; LaSalle County Station Units 1 and 2; Byron Station Units 1 and 2; and Braidwood Station Units 1 and 2; NRC Docket Nos. 50-10/237/254, 50-249/265, 50-295/304, 50-373/374, 50-454/455, and 50-456/457 References (a):
D. L. Peoples letter to T. A.
Ippolito dated January 3, 1980 (b):
B. K. Grimes letter to All Power Reactor Licensees and Applicants for a License to Operate dated March 10, 1980 (c):
C. Reed letter to D. G. Eisenhut dated October 18, 1979
Dear Mr. Grimes:
Enclosed is the upgraded draft of the Commonwealth Edison Company Generating Stations Emergency Plan (GSEP)-Revision 0.
The revised GSEP, originally submitted in draft form with Reference (a),
has been modified to address the comments received from Messrs.
W.
Axelson (Directorate of Inspection and Enforcement-Region III) and D. Kunihiro (NRR), the NRC Staf f members conducting the review of the Commonwealth Edison emergency preparedness program.
In addition, the enclosed materials address tnr inf erim guidance on emergency response plans contained in NURFWlt54 (Reference (b)).
Also enclosed is the revision to the LaHS 1 Ocunty Emergency Action Levels List (Taule LA 5.0-1 in the La'.a lc Jnty GSEP Annex) requested by Mr. Axelson.
1 L
Comm:nwntth Edisce Mr. B. K. Grimes, Program Manager April 24, 1980 Page 2 It and comments relative to the Commonwealth Ediso preparedness program.
are under continuing review.There are certain sections of the plan that full implementation are discussed in the GSEP/NUREG-0654 Cr Reference which is enclosed.
s are being revised to provide comparable additional information was provided in the LaSalle County Emergency Action Level List (Table LA 5.0-1).
Quad Cities, Zion, Submittal of the complete Site Annex 30, 1980.
and LaSalle County Stations is plannedfor Dresden, for May now in process within Commonwealth Edison.The formal utility review will be completed by May 30 It is expected that this 1980.
Therefore, you are requested to communicate any commen,ts on the enclosed materials no later than May 23, 1980 so that those comments can be considered our review.
It is essential that this review schedule be maintain to allow for timely implementation of the revised GSEP.
In that regard, it is our intention as indicated in Reference (c)
Implementing Procedures (EPIP's) now in ef fect by Ju include where appropriate action level criteria based on pl 1980 to parameters and instrumentation.
ant In addition, Level guidelines in the present GSEP shall be upgraded tthe Emergency A notification of the NRC 'for events in the emergency classes o require described in NUREG-0610 (Oraft) - September, 1979.
Full implementation of the upgraded GSEP will be accom conjunction with implementation of the Category "plished in NUREG-0578; many of which are incorporated into the upgrad d Pl B" items in e.g. post-accident containment sampling, containment monitoring e
an, Emergency Operations Center, etc.
upgraded plan is contingent upon satisfactory compl appropriate emergency response exercise (s).
plan to conduct such an excerise in conjunction with State and Loc It is currently our authorities during the summer of 1980 at one of our operating a
nuclear facilities.
In addition, an exercise involving Local authorities in the LaSalle County Station emergency planning zone i
will be conducted prior to the scheduled fuel loading date of j
September 30, 1980 for LaSalle County Unit 1.
both the NRC Staf f and FEMA review of the emergency preparedneIt is program for the Commonwealth Edison nuclear facilities be completed l
ss expeditiously to support the current license review sc'adule for LaSalle County Unit 1.
i l
-j L
~
Comm:nwalth Edis n 4
Mr. B. K. Grimes, Program Manager April 24, 1980 Page 3 We again request that any questions you or your reviewers may have be submitted to this office by May 23, 1980.
nne (1) signed original and ten (10) copies of this letter, and ten (10) copies of the upgraded draf t GSEP are enclosed for your review.
Very truly yours, h.. YLsf D. L. Peoples Director of Nuclear Licensing cc:
Mr. A. Bournia Division of Project Management -
Of fice of Nuclear Reactor Regulation Mr. W. Axelson Directorate of Inspection and Enforcement - Region III 3296A l-k