ML19323J107

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Repts 50-321/80-15 & 50-366/80-15 on 800402-04.No Noncompliance Noted
ML19323J107
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 04/30/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: John Miller
GEORGIA POWER CO.
Shared Package
ML19323J108 List:
References
NUDOCS 8006170779
Download: ML19323J107 (2)


See also: IR 05000321/1980015

Text

  1. ya at:

/ f(

,

'o

UNITED STATES

'j

!

^ ,f.

NUCLEAR REGULATORY COMMISSION

80-lLW

?

3

e

REGION ll

M g[

f

0

101 MARIETTA ST., N.W., SUITE 3100

-

ATLANTA, GEORGIA 30303

-

APR 3 01980

In Reply Refer To:

RII:RJH

50-321/80-15

50-366/80-15

-

_

_ . _ _ _ _ _

Georgia Power Company

i

ATTN:

J. H. Miller, Jr.

Executive Vice President

270 Peachtree Street

Atlanta, GA 30303

Gentlemen:

This refers to the inspection conducted by R. 'J.

Hardwick of this office on

April 2 through 4,1980 of activities authorized by NRC Operating License No.

DPR-57 and License No. NFP-5 for the E. I. Hatch facility, and to the discussion

of our findings held with T. V. Greene at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are discussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

,

include a full statement of the reasons on the basis of which it is claimed that

(

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

9

%

- , ,

f

.

e

$

O

?

).

,

, . . . . -

-

,.-.-.~.- -.--

r.

.

.

. ,

.

.

Georgia Power Company

2-

APR 3 01980

-

W

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

m

Sincerely,

.2

27/

C. E. Murp 6

Reactor Construction and Engineering

Support Branch

Enclosure:

Inspection Report Nos. 50-321/80-15

and 50-366/80-15

cc w/ enc 1:

^ ' ~ ~ ~ ~

~~~~-~

-

..

M. Manry, Plant Manager

..

,

P. O. Box 442

Baxley, GA 31513

C. E. Belflower

Site QA Supervisor

P. O. Box 442

Baxley, GA 31513

W. A. Widner

Vice President and General Manager

Nuclear Generation

-Georgia Power Company

Post Office Box 4545

Atlanta, GA 30303

_

-

4

s

?$

.

4

m

y

em WM

Q'_'

_

-,,

v

-

'

Sc'

1

'

' ' - ' '

'