ML19323J046

From kanterella
Jump to navigation Jump to search
Forwards LER 80-005/03L-0
Date released: 12/03/2019 Download: ML19323J046


LER 80-005/03L-0:on 800517,2J Emergency Diesel Generator Tripped After Starting & Operability of 2H Diesel Generator Was Not Verified within 1-h.Caused by Existing Procedures Not Specifying Test Connections Required to Test Diesel
ML19323J049
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/11/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323J049 (2)
Forwards LER 80-005/03L-0
ML19323J045
Person / Time
Site: North Anna Dominion icon.png
Issue date: 06/11/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323J045 (1)