Forwards IE Insp Repts 50-454/80-05 & 50-455/80-05 on 800325-26 & Notice of Violation
ML19323H889
Person / Time
Site: Byron  
Issue date: 04/25/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Brian Lee
COMMONWEALTH EDISON CO.
Shared Package
ML19323H890 List:
References
NUDOCS 8006170208
Download: ML19323H889 (2)


See also: IR 05000454/1980005

Text

- . - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ . _ .

  1. "'%'o

TIC

.

UNITED STATES

8

g

g

NUCLEAR REGULATORY COMMISSION

i

C

e

REG l0N lll

[

O

799 ROOSEVELT ROAD

gg *****,o

GLEN ELLYN, ILLINOIS 60137

APR 2 5 560

Docket No. 50-454

Docket No. 50-455

Commonwealth Edison Company

ATTN:

Mr. Byron Lee, Jr.

Vice President

Post Office Box 767

Chicago, IL 60690

Gentlemen:

This refers to the inspection conducted by Mr. I. T. Yin of this office

on March 25-26, 1980, of activities at Byron Station, Units 1 and 2,

authorized by NRC Construction Permits No. CPPR-130 and No. CPPR-131 and

to the discussion of our findings with Messrs. A. W. Kleinrath, G. Sorensen,

G. F. Marcus, and others of your staff at the conclusion of the inspection

on April 8, 1980 in this office.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspectibn consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

During this inspection, certain of your activities appeared to be in non-

compliance with NRC requirements, as described in the enclosed Appendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance: (1) corrective action

taken and the results achieved; (2) corrective action to be taken to

avoid further noncompliance; and (3) the date when full compliance will

'

be achieved.

With regard to the identified noncompliance, we understand that all new

piping suspension component and equipment installations will conform to

the new program you outlined during the exit interview.

Furthermore,

all previous installations will be reinspected to verify compliance with

your program.

8006170 24 g

.

Commonwealth Edison Company

-2-

APR 2 o 1960

.

In accordance with Section 2.790 of the NRC's " Rules of Practice,," Part

2, Title 10, Code of Federal Regulations, a copy of this letter, the

enclosures, and your response to this letter will be placed in the NRC's

Public Document Room, except as follows.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so

that proprietary information identified in the application is contained

in an enclosure to the application.

We will gladly discuss any questions you have concerning this inspection.

Sincerely,

G __.d' G. Kd1Trh==b

[ Director

ames

Enclosures:

1.

Appendix A, Notice

of Violation

2.

IE Inspection Report

No. 50-454/80-05 and

No. 50-455/80-05

cc w/ encl:

Mr. D. L. Peoples, Director

of Nuclear Licensing

Mr. Gunner Sorensen, Site

Project Superintendent

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Mr. Dean Hansell, Office of

Assistant Attorney General

Myron M. Cherry, Chicago

.-

-