ML19323H882
| ML19323H882 | |
| Person / Time | |
|---|---|
| Site: | Callaway |
| Issue date: | 04/26/1980 |
| From: | Fiorelli G NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Bryan J UNION ELECTRIC CO. |
| Shared Package | |
| ML19323H883 | List: |
| References | |
| NUDOCS 8006170196 | |
| Download: ML19323H882 (2) | |
See also: IR 05000483/1980007
Text
!
'o,,
UNITED STATES
8
NUCLEAR REGULATORY COMMISSION
f
o
,f
D
a
REGION lli
g*.*&[
790 ROOSEVELT ROAD
j
99
GLEN ELLYN, ILLINOIS 60137
APR 2 6 880
Docket No. 50-483
Union Electric Company
ATTN:
Mr. John K. Bryan
Vice President - Nuclear
Post Office Box 149
St. Louis, MO 63166
Gentlemen:
This refers to the inspection conducted by Mr. H. M. Wescott of this
office on March 11-14, 1980, of activities at the Callaway Plant, Unit
,
'
1, authorized by NRC Construction Permit No. CPPR-139 and to the dis-
cussion of our findings with Mr. W. H. Weber and others of your staff
at the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
During this inspection, certain of your activities appeared to be in
noncompliance with NRC requirements, as described in the enclosed Ap-
pendix A.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter, the en-
closures, and your response to this letter will be placed in the NRC's
Public Document Room, except as follows.
If the enclosures contain in-
formation that you or your contractors believe to be proprietary, you
must apply in writing to this office, within twenty days of your receipt
of this letter, to withhold such information from public disclosure. The
,
application must include a full statement of the reasons for which the
information is considered proprietary, and should be prepared so that
proprietary information identified in the application is contained in an
enclosure to the application.
l
j
l
8 00617 0lThA
-
.
Union Electric Company
2-
-
APR 2 61980
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
d44
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
Enclosures:
1.
Appendix A, Notice of
Violation
2.
IE Inspection Report
No. 50-483/80-07
cc w/encls:
Mr. W. H. Weber, Manager
Nuclear Construction
Central Files
Reproduction Unit NRC 20b
Local PDR
Regions I & IV
Ms. K. Drey
Mr. Ronald Fluegge, Utility
Division, Missouri Public
Service Commission
,
%
r
.
..y.
~
_
- , _ .
_
-.
v
,
,.