Corrected Copy of Forwarding IE Insp Rept 50-483/80-07 & Notice of Violation.W/O Encls
ML19323H881
Person / Time
Site: Callaway Ameren icon.png
Issue date: 05/02/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Bryan J
UNION ELECTRIC CO.
Shared Package
ML19323H878 List:
References
800426-01, 800426-1, NUDOCS 8006170195
Download: ML19323H881 (2)


See also: IR 05000483/1980007

Text

..

_

__- --___ _

,m

  • /

?

U

g raag

o

UNITED ST ATES

8%

'

-'

NUCLEAR REGULATORY COMMISSION

n

$-

c [E

REGION lli

P,

799 ROOSEVELT ROAD

jg

,f

GLEN ELLYN,ILLINols 60137

NAY

2 IS80

Docket No. 50-483

Union Electric Company

ATTN:

Mr. John K. Bryan

Vice President - Nuclear

Post Office Box 149

St. Louis, MO 63166

Gentlemen:

This refers to the inspection conducted by Mr. II. M. Wescott of this

office on March 11-14, 1980, of activities at the Callaway Plant, Unit

1, authorized by NRC Construction Permit No. CPPR-139 and to the dis-

cussion of our findings with Mr. W. !!. Weber and others of your staff

at the conclusion of the inspection.

'

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspection consisted

of a selective examination of procedures and representative records,

j

observations, and interviews with personnel.

l

During this inspection, certain of your activities appeared to be in

l

1

noncompliance with NRC requirenmata, as described in the enclosed Ap-

pendix A.

This notice is sent to you pursuant to the provisions of Section 2.201 of

the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal Regula-

tions. Section 2.201 requires you to submit to this office within thirty

days of your receipt of this notice a written statement or explanation in

reply, including for each item of noncompliance:

(1) corrective action

taken and the results achieved; (2) corrective action to be taken to avoid

further noncompliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter, the enclosures,

'

and your response to this letter will be placed in the NRC's Public Document

Room, except as follows.

If the enclosures contain information that you or

your contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold such

information from public disclosure. The application must include a full

statement of the reasons for which the information is considered proprietary,

j

and should be prepared so that proprietary information identified in the ap-

plication is contained in an enclosure to the application.

l

8 006170M g

r.

.

Union Electric Company

-2-

MAY

2 ISBf)

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

G. Fiorelli, Chief

Reactor Construction and

Engineering Support Branch

Enclosures:

1.

Appendix A, Notice of

Violation

2.

IE Inspection Report

No. 50-483/80-07

cc w/encls:

Mr. W. H. Weber, Manager

Nuclear Construction

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Regions I & IV

Ms. K. Drey

Mr. Ronald Fluegge, Utility

Division, Missouri Public

Service Commission

l

l

I

.

<