ML19323H851
| ML19323H851 | |
| Person / Time | |
|---|---|
| Site: | Prairie Island |
| Issue date: | 06/03/1980 |
| From: | Heishman R NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Gilberts D NORTHERN STATES POWER CO. |
| References | |
| NUDOCS 8006170098 | |
| Download: ML19323H851 (2) | |
Text
.
4
'o UNITED STATES
'g NUCLEAR REGULATORY COMMISSION I/C
^
l' g+
g b
ne REGION ill P
7H ROOSEVELT ROAD GLEN ELLYN,ILLINolS 60137
,o PJUN 3 1980 Docket No. 50-282 Docket No. 50-306 Northern States Power Company ATTN:
Mr. Dennis E. Gilberts Vice President Power Production and System Operation 414 Nicollet Mall Minneapolis, MN 55401 Gentlemen:
We have been requested by our headquarters to arrange for an Office of Inspection and Enforcement contractor to review the Prairie Island emergency operating procedures during the week of June 9-13, 1980. The OIE contractor, Human Performance Technologies, is under contract to develop checklists etc. for our use in reviewing emergency operating procedures.
The visit to Prairie Island is one of four sites picked at random for a data gathering function and will not result in items of noncompliance being generated or recommendations for revision of procedures.
In addition to the pro edure review, HPT personnel will need to talk to your training staff, review the administrative cystem for development and updating of procedures and be given a walk-thrc~u of 5-7 selected emergency procedures. The walk-throughs are tb-
't important part of this effort and will require a member (s) of your operating staff to assist. HPT personnel will be available to witness the walk-through on back shifts as well as day shift, whichever is most convenient for you.
The individual licensee will not be identified in the final report, but the data collected will be used to provide a composite picture of the emergency procedures that were reviewed.
Copies of the final report, estimated to be issued in April, 1981 will be provided to all licensees that participate.
It is our underr.tanoing that the HPT reviewer for this effort is Mr. Meyer (Mike.) Weinstein, Social Security No. 097-18-2741.
8006170 cqg i
e Northern States Power Company tjgg 3 ggg We would appreciate your cooperation in this matter.
If you have any questions please contact me.
Sincerely, a
)
2^ JsmJ R. F. Heishman, Chief Reactor Operations and Nuclear Support Branch cc:
Mr. F. P. Tierney, Jr.,
Plant Manager Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC John W. Ferman, Ph.D.,
Nuclear Engineer, MPCA e
(
[
s
.-