Forwards IE Insp Rept 50-395/80-10 on 800414-17.No Noncompliance Noted
ML19323H811
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/02/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mary Johnson
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML19323H812 List:
References
NUDOCS 8006160216
Download: ML19323H811 (2)


See also: IR 05000395/1980010

Text

- - -

.

WN

9"

/

5 G75

UNITED STATES

i.

!

NUCLEAR REGULATORY COMMISSION

o

'

$

E

9

REGION il

o

101 MARIETTA ST N.W SUITE 3100

%*...*

ATLANTA, GEORGIA 3o3o3

MAY - 21980

In Reply Refer To:

RII:TEB

50-395/80-10

.

South Carolina Electric and Gas Company

ATTN:

M. C. Johnson, Vice President

Special Services and Purchasing

>

P. O. Box 764

Columbia, SC 29218

Gentlemen:

This refers to the inspection conducted by T. E. Burdette of this office on

April 14 through April 17, 1980 of activities authorized by NRC Construction

Permit No. CPPR-94 for the V. C. Summer facility, and to the discussion of our

findings held with J. F. Algar at the conclusion of the inspection.

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

i

'

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

Two new unresolved items resulted from this inspection and are di' cussed in the

enclosed report. These items will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report cortains

any information that you (or your contractor) believe to be proprietary, ic is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

nation identified in the application is contained in a separate part of the

+

document.

If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

.

^

Sincerely,

t

-

y

-

C. E. Murphy, Chief

.

- - -

8006160 Q /f

Reactor Construction and Engineering

Support Branch

Enclosure:

See Page 2

.- .

- . . ,

_

.

, t

I

South Carolina Electric and

'

' Gas Company.

-2-

MAY - 21980

Enclosure:

Inspection Report No. 50-395/80-10

cc w/ enc 1:

T. B. Conners, Jr.

Conners, Moore and Corber

1747 Pennsylvania Avenue, N. W.

Washington, DC 20006

.A.

A." Smith

Quality Assurance

P. O. Box 8

.

Jenkinsville, SC 29065

O. S. Bradham, Manager

Nuclear Operations

P. O. Box 8

Jenkinsville, SC 29065

,

I

.

=

g'%=

w

/

F3

4

  • *

"#

-

"

y

,

.

.1

.

.

]

.

,

,.,l['

'

o