_ _ _ _ _

7~.ZL-

\\

  1. pa ancoq'c;

UNITED STATES

NUCLEAR REGULATORY COMMISSION

.

O\\

/

REGloN IV

E

DI

S

611 RYAN PLAZA DRIVE, SUITE 1000

5y

J

j

ARLINGTON, TEXAS 76012

S'

. , [pf

%

~

    • ..*

April 25, 1980

In Reply Refer To:

RIV

Docket No. 50-498/Rpt. 80-05

50-499/Rpt. 80-05

Houston Lighting and Power Company

Attn: Mr. E. A. Turner, Vice President

Power Plant Construction and

Technical Services

Post Office Box 1700

Houston, Texas

77001

Gentlemen:

This refers to the inspection conducted by our Resident Inspector,

Mr. H. S. Phillips, for the period of March 1980, of activities authorized

by NRC Construction Permits No. CPPR-128 and 129 for the South Texas

Project, Units No. I and 2, and to the discussion of our findings with

Mr. L. D. Wilson and other members of your staff during the inspection

period.

Areas examined during the inspection and our findings are discussed in

the enclosed inspection report. Within these areas, the inspection con-

sisted of selective examination of procedures and representative records,

interviews with personnel, and observations by the inspector.

During the inspection, it was found that certain activities under your

license appear to be in noncompliance with 10 CFR 50.55(e) of the NRC

Regulation, " Conditions of Construction Permits." The items of non-

compliance and references to the pertinent requirements were identified

in the Notice of Violation transmitted with our letter dated April 4, 1980.

Therefore, this letter does not require further response regarding this

matter.

In accordance with Section 2.790 of the liRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room. If the

report contains any information that you believe to be proprietary, it is

necessary that you submit a written application to this office, within 20 days

of the date of this letter, requesting that such information be withheld from

public disclosure.

The application must include a full statement of the reasons

why it is claimed that the information is proprietary.

The application should

8006130d[9

. _ -

.

.

_ _ _ _ - _

_ _ - _ _ _ _ _

_____

l

Houston Lighting end Powsr Company

-2-

April 25, 1980

'

.

be prepared so that any proprietary information identified is contained in an

enclosure to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do uot hear from you in this

regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this inspection, we will be pleased

to discuss them with you.

Sincerely,

.

l

2

I

k'.

C. Seidl , Chief

Reactor Construction and

Engineering Support Branch

Enclosure:

IE Inspection Report No. 50-498/80-05

50-499/80-05