O VIRGINIA ELECTRIC AND POWER CO?tPANY NORTH AtlNA POWER STATI0li MONTHLY OPERATING REPORT MONTH May YEAR m SUBMITTED:
SUPERItiTA10EtiT OPERATIONS CT.
.l
' APPROVED:
I
_t STATION mat (AGER ij sece180 W g
J OPERATING DATA REPORT DOCKET NO. 50-338 DATE 6-2-80 COMPLETED BY W-R-
Madison TELEPHONE 70 %994 6151 OPERATING STATUS Notes
~
~-
- 1. Unit Name:
Mn"th Anna 1
- 2. Reporting Period:
M3V 1980
- 3. I te==-d Thermal Power (MWt):
9775 947
- 4. Nameplate Rating (Gross MWe):
907
- 5. Desgn Electrical Rating (Net MWe):
928
- 6. Maximum Dependable Capacity (Gross MWe):
898
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since la.st Report.Give Reasons:
N/A
- 9. Power Level To Which Restricted,1f Any (Net MWe):
N/A N/A
- 10. Reasons For Restrictions.,1f Any:
This Month Yr.-to-Dete Cumulative 744 3,647
'17,424
- 11. Hours la Reporting Period 526.6 2,859.8 13,025
- 12. Number Of Hours Rescror Was Critical
- 13. Reactor Reserve Shutdown Hours 0
dl_q 190.2
{
- 14. Hours Generator On-Line 526.6 2,703 12.756.2
- 15. Unit Reserve Shutdown Hours 0
0 0
- 16. Gross Thermal Ener2y Generated (MWH) 1,454.808 6.R66 077 11_144 400
- 17. Gross Electrical Energy Generated (MWH) 454.039
. _ _ _ 2.149.851 10 496 pon
- 18. Net Electrical Energy Generated (MWH).
428.037 2.021.813 9_875.259
- 19. Unit Service Factor 70.8 74.1
- 73. p 70.8 74.1 73.2
- 20. Unic Availability Factor
- 21. Unit Caoscity hactor'(Using MDC Net) 04.I 61.7 63.1 4
63.4 61.1 62.5
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 2912' I3 ?
F, 4
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Each):
f!/A 1
1
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
M"no 7, 1900 l
- 26. Units In Test Status (Prior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY
- j l
INITIAL ELECTRICITY COMMERCIAL OPERATION 19/77)
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-338 NA 1 UNIT 6-2-80 DATE COMPLETED BY W. R. Madison TELEPHONE 703-894-515J MONTH May, 1980 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(Mwe. Net) 1 823 811 37 820 812 2
,3 3
818 808 19 4
816 811 20 815 813 3
21 6
813 764 22 0l2 0
7 23 813 0
g 24 9
R14 25 0
10 813 0
26 t1 816 0
27 12 796 0
28 814 0
13 29 810 0
14 3,
15 813 0
33
,6 810 INSTRUCTIONS On this format, list the average daily unit power level in MWe-Net for each day in the reporting month. Cornpute to the nearest whole megawatt.
(9/77)
50-338 I
l UNil'silUIDOwNS AND POWER REDUCTIONS NI NAh!
orth Anna I DA1E 6-1-80 005'ILETEI Y RITORT 10NTil May 1980 x303 rL "L
hi
,{ g 3
o g
- j" Licensee Eg gg Cause & Correceive
) s;e}
No.
Date Q
- g j
I: vent y
Ab ActI"n t" jE E
b jgg Report #
in u Prevent Recurrence e
I c3 4
i 80-13 800522 F
217.4 A*
3 80147/0lT SF Genera HI-HI steam generator water level.
Feed reg. valve FCV-1498 for "C" steam generator failed open.
Valve will be repaired, g-
't i
'N l
I 1
6
/
l' I
J J
4 F: Forced Reason:
Method:
Exhible G. Instrucilons
~-
S: Scheduled A Eiluipment Failure (Explain),
I Manual for Pieparation oI Data I
li-Maintenance of Test 2-Manual Scram.
Entiy Sheets for I.leensee t'
c.ucfueling 3-Aulomalle Sciam.
Event Repost (1.ER) File iNURI.G-D Regulatory Restricilon 4 Other (Explain) 0161)
- 'j E Opesatur Training & IJcense Examinallon F Adininistiative 5
C Opesailonal Esaur (Explain)
~ Exhibli 1.Same Source 19/77)
Il-Othes (Explain)
- See attached sheet.
I Page of I
UNIT SHUTD0'AN AND POWER REDUCTI0 tis EXPLANATION SHEET DOCKET NO. 50-338 REPORT MONTH May.
UNIT NAME North Anna 1 YEAR 1980 DATE 6-1-80 COMPLETED BY A. G. Neufer.
80-13 (A) 5-22-80 at 2237 Reactor tripped from Hi-Hi S/G water level in "C" S/G.
Feed water reg valve FCV-1498 valve actuator / positioner broke off the valve assembly causing the valve to open and allowing it not to be closed remotely.
Notei The uni;t Qas previously scheduled for an outage on the following Tuesday morning so at the time of the trip the outage was started.
Highlights:
"Essex" Control, Board modification Dr61.ning of steam generators for i;nternal tube si.de inspection for loose parts and blowdown and check. yalve mai.ntenance.
A new governor was installed ~ 0n emergency diesel generator.
Thksoutagewi'llextendthrou'h'theendofMay.
g
=
~..., -. _., -. _,,...
,. ~. ~. _. _.
OPERATING DATA REPORT DOCKET NO.
50-339 DATE o-2-60 COMPLETED BY W. R. Madison TELEPHONE
/U.$-6 W -5151 OPERATING STATUS North Anna 2 Notes
- 1. Unit Name:
May 1980 North Anna 2 License NPF-7
- 2. Reporting Period:
- 3. Licensed Thermal Power (MWt):
139 issued for fuel loading and 947 lower power testilig.on'4 4. Nameplate Rating (Gross MWe):
80.
907
- 5. Design Elecmcal Rating (Nes MWe):
928
- 6. Maximum Dependable Capacity (Gross MWe):
- 7. Maximum Dependable Capacity (Net MWe):
898
- 8. If Changes Occur in Capacity Ratings (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A
- 9. Power Level To Which Restricted,1f Any (Net MWe):
M 'm
- 10. Reasons For Restrictions.If Any:
N[/A This Month Yr..to-Date Cumulative tiot arhinvort
- 11. Hours !n Reporting Period Cd+y t t..#
- 12. Number Of Hours Resctor Was Critical
'O O
n
- 13. Reactor Reserve Shutdown Hours 0
0 0
- 14. Hours Generstor On-Line 0
0 n
- 15. Unit Reserve Shutdown Hours 0
0 n
0 0
- 0
- 16. Gross Thermal Energy Generated (MWH) 0 0
0
- 17. Gross Electrical Energy Generated (MWH)
- 18. Net Electric:d Energy Generated (MWH).
0 0
0
- 19. Unit Service Factor N/A N/A N/A
- 20. Unit Availability Factor N/A N/A N/A II/A N/A N/A
- 21. Unit Capacity Fsetor iUsing MDC Net)
- 22. Unit Capacity Factor (Usine DER Net)
N/A Pfla M/4 fl/A fl/A N/A
- 23. Unic Forced Outage Rate
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date.and Duration of Each):
N/A
- 25. If Shur Down At End Of Report Period. Estimated Date of Startup:
N/A
- 26. Units In Test Status,'hior to Commercial Operation):
Forecast Achieved INITIAL CRITICALITY 6/6/80 INITIAL ELECTRICITY 7 5 80 COMMERCIAL OPERATION (9/77)
AVERAGE D AILY UNIT POWER LEVEL 50-339 DOCKETNO.
2 UNIT 6-2-80 DAE COMPLETED BY W. R. Madison 703-894-5151 TELEPHONE MONTH May, 1980 DAY, AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe Net)
(MWe-Net) 0 0
1 37 0
0 2
33 3
0 39 0
4 0
0 20 0
0 5
21 6
0.
22 0
0 0
7 D
0 0
8 24 9
0 25 0
10 0
0 26 11 0
27 0
12 0
28 0
13 0
29 0
14 n
30 0
13 0
31 0
16 0
INSTRUCTIONS On this format, list the average daily unit power level in MWe. Net for each day in the reporting month. Compute to the nearest whole megawatt.
(9/77)
L
~ 9 UNirSIIUTDOWNS AND POWER REDUCTIONS DOCKETNO.1N 2 UNir N AME DATE 6-2-80 COMPLETED By W. R. Madison _
REPORT MONTil May,1980 TELEPilONE 703-894-5151
=
c
.5?
'h
$Y3 Licensee
[-r, K'8 Cause & Corrective No.
Date g
3g j
jg5 Event g'g gU Action to H
j5 jgg Report #
mU Prevent Recurrence g
6 Unit in starttp status. Cr iticali ty has not bec n achi eved.
I 2
3 4
F: Fored Reason:
Method:
Exhibit G. instructions S: Scheduled A Equipn:ent Failure (Exp!:!r.)
1 Manual for Preparation of Data B-Maintenance of Test 2-Manual Scram.
Entry Sheets for Licensee C-Refueling 3 Automatic Scram.
Event Report (LEll) File (NUill'G.
D-Regulatory Restriction 4-Other (Explain) 0161)
E-Operator Training & License Ex.mination F Adminstrative 5
G-Operational Error (Explain)
Exhibit I.Same Source (9/77)
Il-Other (Explain)