Forwards IE Insp Rept 50-370/80-01 on 800109-11 & Notice of Violation
ML19323H152
Person / Time
Site: Mcguire
Issue date: 02/11/1980
From: Bryant J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parker W
DUKE POWER CO.
Shared Package
ML19323H138 List:
References
NUDOCS 8006120145
Download: ML19323H152 (2)


See also: IR 05000370/1980001

Text

.-

_-

.

o

UNITED STATES

8

g

NUCLEAR REGULATORY COMMISSION

o

,

y

$

E

REGION il

o,

-

f

101 MARIETTA sT., N.W., SUITE 3100

b

o

ATLANTA, GEORGI A 30303

FEB 11 W

In Reply Refer To:

RII:EHG

50-370/80-01

Duke Power Company

ATTN:

W. O. Parker, Jr.

Vice President, Steam Production

P. O. Box 2178

Charlotte, N C 28242

Gentlemen:

This refers to the inspection conducted by E. H. Girard of this office on ,

January 9-11, 1980, of activities authorized by NRC Construction Permit No.

CPPR-84 for the McGuire facility, and to the discussion of our findings held

with J. C. Rogers at the conclusion of the inspection.

'

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

.

During tile inspection, it was found that certain activities under your license

appear to be in noncompliance with NRC requirements. These items and references

to pertinent requirements are listed in the Notice of Violation enclosed here-

with as Appendix A.

This notice is sent to you pursuant to the provisions of

Section 2.201 of the NRC's " Rules of Practice," Part 2, Title 10, Code of Federal

Regulations. Section 2.201 requires you to submit to this office, within 20

days of your receipt of this notice, a written statement or explanation in reply

including:

(1) corrective steps which have been taken by you and the results

achieved; (2) corrective steps which will be taken to avoid further noncom-

pliance; and (3) the date when full compliance will be achieved.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

f

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

.

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear frcm you in this regard within

the specified period, the report will be placed in the Public Document Room.

8006120/ g

._.

.

.

'\\

Duke Power Company

-2-

FEB 111930

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

t

,4

.

. C.

t, Acting Chief

Reactor Construction and Engineering

Support Branch

Enclosures:

1.

Appendix A, Notice of Violation

2.

Inspection Report No. 50-370/80-01

cc w/ encl:

M. D. McIntosh, Plant Manager

P. O. Box 488

,

Cornelius, N C 28031

J. C. Rogers, Project Manager

P. O. Box 33189

Charlotte, N C 28242

,

  • 1,

-