ML19323H059

From kanterella
Jump to navigation Jump to search
Forwards LER 80-021/03L-0
Date released: 12/03/2019 Download: ML19323H059


LER 80-021/03L-0:on 800506,during Routine Testing to Prove Diesel operability,13U Diesel Generator Breaker Closed After Manual Opening.Caused by Loose Bolt in Generator Spring Charging Sys Causing Latch to Fail.Bolt Tightened
ML19323H068
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/04/1980
From: Foster E
NORTHEAST NUCLEAR ENERGY CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19323H068 (1)
Forwards LER 80-021/03L-0
ML19323H058
Person / Time
Site: Millstone Dominion icon.png
Issue date: 06/04/1980
From: Mroczka E
NORTHEAST NUCLEAR ENERGY CO.
To: GRIER B H
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
References
Download: ML19323H058 (1)