Responds to NRC Re Violations Noted in IE Insp Repts 50-348/80-07 & 50-364/80-04.Corrective Actions: Cleaning Stainless Steel Pipes w/Scotch-brite Pads Was Stopped.Cleaning Pads Returned to Warehouse
ML19323G714
Person / Time
Site: Farley  Southern Nuclear icon.png
Issue date: 04/28/1980
From: Clayton F
ALABAMA POWER CO.
To: James O'Reilly
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323G711 List:
References
NUDOCS 8006060531
Download: ML19323G714 (2)


Text

_ _ _ _ _ _ _ _ _

Alabam3 Power Company

'(

g 600 North 18th Street Po;t offica Box 2641 Birmerqham. Alabama 35291 cs e

i Telephone 205 323-5341

,v L

hko%^c'e',";i, Alabama Power April 28, 1980 the sournern ewrc spem Joseph M. Farley Nuclear Plant hTC Inspection of February 4-29, 1980 File: A-35.10.03 Ing:

80-680 Mr. Janes P. O'Reilly Z

U.S. Nuclear Regulatory Conmission 101 Lhrietta Street, N.W. - Suite 3100 Atlanta, Georgia 30303 Re: RII:MIB 50-348/80-7 50-361/80-4

Dear Mr. O'Reilly:

'Ihe inspection mport transnitted by letter dated April 10, 1980 has been reviewed by all concerned parties, and we do not con-sider any of the information contained therein to be proprietary.

'Ibe nonempliance in the inspection report is Infraction 3G4/80-04-01.

'Ibe following actions have been taken in response to the inspection mport.

1.

Oormctive steps which have been taken by Alabama Power Conpany ( APOD) and the msults achieved.

(a) Inmediately following notice of infraction, the cleaning of stainless steel pipe with " Scotch-brite" pads was stopped and field personnel wcre instructed to return all " Scotch-brite" cleaning pads to the project wambouse.

(b) Work was begun inmediately at the project Quality Contlul (QC) lab to run tests on a nmber of New

" Scotch-brite" cleaning pads, to determine chlorine content.

ao06oeo53/

'DFFICIAL COPY

J Mr. Janes P. O'Reilly NIC Inspection of February 4-29, 1980 Page 2 April 28,1980 (c) Results of QC lab tests perfomed on the New " Scotch-brite" cleaning pads were transmitted to Bechtel by mmo of 3/12/80 for their evaluation.

(d) Following Bechtel's evaluation of QC lab tests to detennine chlorine content, Bechtel advised APOD of a favorable evaluation of tests results. Subsequently, a Field Change Request (ICR-2C-986) dated 3/12/80 asking for appiuval of use of " Scotch-brite" pads for cleaning stainless steel was transmitted to Bechtel.

(e) Bechtel approval for use of " Scotch-brite" pads for cleaning stainless steel, shown on a Change Notice (2BM-3589), was received on site 4/16/80.

(f) A Work PInceduru for Cleaning Stainless Steel Pipe has been developed and approved.

(g) QC Procedure No. 5.4.2.3 - Quality Control Procedure for Installation of Equipment and Piping Insulation, references Westinghouse Specification PS-83336-KA which establishes criteria for detennining the sur-face concentration of chlorine and fluoride on stainless steel surfaces after final cleaning prior to installation of insulation.

2.

Oorrective steps take to avoid further nonconpliance.

Requested Bechtel's approval of materials used in cleaning stainless steel piping, developed and appro'.ud a work procedure and inplemented the work pincedure.

3.

'Ihe date full empliance will be achieved.

Full empliance was achieved April 23, 1980.

Very truly

urs, F. L. Clayton, Jr.