05000338/LER-1980-041-03, /03L-0:on 800503,during Review of Operations Periodic Test Schedule,Quarterly Inservice Insp of B Lhsi Pump Check Valves Determined Not Performed within Required Interval.Caused by Inadvertent Deletion from Schedule

From kanterella
(Redirected from ML19323G639)
Jump to navigation Jump to search
/03L-0:on 800503,during Review of Operations Periodic Test Schedule,Quarterly Inservice Insp of B Lhsi Pump Check Valves Determined Not Performed within Required Interval.Caused by Inadvertent Deletion from Schedule
ML19323G639
Person / Time
Site: North Anna 
Issue date: 05/30/1980
From: Cartwright W
VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.)
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323G636 List:
References
LER-80-041-03L, LER-80-41-3L, NUDOCS 8006060410
Download: ML19323G639 (2)


LER-1980-041, /03L-0:on 800503,during Review of Operations Periodic Test Schedule,Quarterly Inservice Insp of B Lhsi Pump Check Valves Determined Not Performed within Required Interval.Caused by Inadvertent Deletion from Schedule
Event date:
Report date:
3381980041R03 - NRC Website

text

__

UCENSEE EVENT REPORT c=urnos.stoCm I I

I l

1 I

I m. sass mNr en rm Au. amouinso inconnaanoNo i i i I l Vla l N l A l S l Ilglis0 l 0 l - l 0 l 0l0 l 0 l 0 l - l0 l 0 lgl 4 l 1 l1 l1 l 1 (gl a c.al r asl g i

e e ucamssa ccoe i4 ucansa umaan a

a uca.sa rm a s

N*!"

)tii

"*'.cs l L hl O l 510 [0 10l 3l3 l8 @l 0 I 5l 0l3 l 8 l 0 @l015 I 310l AIO l@

saus t

a a

ei occxar umean a

se avsur oar 14 rs aercar oars so l

EvaNT DESCR8FMCN AND PnOSA44.3 CCNSEQUS6CIS h 5"TTI I On May 3, 1980, upon review of the Operations Periodic Test Schedule, it was l

1 l@ l detennined that the quarterly inservice inspection of "B" LHSI pump check valves I

,had not been performed within the required surveillance interval.

Since the g

,,,,grequired testing was performed immediately on the date of discovery, t

,,igwith acceptable results, the health and safety of the general public were not l

,3 6 y ; laffected.

Reportable pursuant to T.S. 6.9.1.9.c.

I I

'~-

a is i I

s:

l W

'iEE

.2Ee sSES.

IS l r l@ g@ g@ l vI AI Liv iz l xt@

c @ N"* @

am anrcoes sesi i

i.

a=au-m a i.

i

=

occu==encs as, er ama===

sv=rrvaaa a=' oar =a.

caos rm

=a.

l

@ =u== I 8 l 01 g

1 014i11 y

1083 I L-d to]

[

n a

a a.

a n

=

a u

a CN 'lFR o'",vne

""EN!"

C @lHlg [Zjg [Zjg _l0l0l0 Ql

^M ca'n'"*au""M" ET-m.' u"nac"ru"===

aua.

l W@

IN l@

[,N,jh l A I 2 l 0l 0lh j

n x

a m

.a en a

e e

c usa es5CR PT1oM ANO CCRMECMVW ACMCNS

,,,o;l The test was inadvertantly deleted from coerations monthly test schedule. The 1 I

process for reviewing test schedules is being revised to eliminate scheduling'I ei1l i

errors.

l

]

li i s i I l

,i.iI f

a e m

)

l

'?r na" aneenstaria @

o".s"co' w'eE onczwareossammm @

i s, amen ioisl W @ l1l0l0!hl NA l

Non-Routine Test Schedule Review l

a y

u n

e se ls is { y @ lZ Ql ro.

r, @ l m,r.o.

r

-.- e.

NA l

MA I

=

l li il l 0 l 0 @{m@l==c,.m @

w r

ul NA l

,,nso

'.uu',?ia 6

l l0lapen0 glsesentmen@

I w

vi NA l

6tl l

  • k caea,c. M = uw @

D**D

  • D Y f j

l 131 I

@l NA

_aa a

s a o

sa

?esame en@

"*C ** C"#

,s 1 I i f I i f I :;

gl NA t

tiiI i.) :

a e to es se so ;

W.

R. Cartwright

,,703-894-5151

{

mau7 e

80060604/O.5

Virginia Electric and Power Company North Anna Power Station, Unit #1

Attachment:

Page 1 of 1 Docket No. 50-338 Report No. LER 80-041/03L-0

Description of Event

On May 3, 1980, with the unit in mode 1, it was discovered that the quarterly inservice inspection of the "B" LHSI pump check valves (1-SI-18, 1-SI-21,1-SI-26 and 1-SI-29) had not been performed within the required surveillance interval.

The surveillance interval expired on April 21, 1980 and the descrepancy was discovered on May 3, 1980 at which time the required testing was satisfactorily performed.

Probable Consequences of Occurrence The consequences of this event were minimal because the testing was out of surveillance a total of only 12 days beyond the permitted Tech Spec. limit for a quarterly PT.

Immediately upon discovery of the event, a satisfactory test was performed.

As a result, the health and safety of the general public were not affected.

There are no generic implications associated with this event.

Cause of Occurrence An error was made on the monthly Periodic Test Schedule from the Operation Department for the month of April, 1980, which inadvertantly omitted the subject test and it was not caught in subsequent reviews.

Immediate Correction Action The subject periodic test was immediately performed successfully.

Scheduled Corrective Action Periodic test schedules submitted by all applicable departments of the station will be reviewed promptly by the Performance Engineer for correctness and completeness.

Actions Taken to Prevent Recurrence Currently the station is in the process of developing a computer program to monitor the periodicity and completion dates of all station periodic tests.

This system will aid in detecting any tests which are late cr have been inadvertantly omitted.