Forwards QA Program Insp Repts 99900382/80-01 & 71-9001/80-01 on 800225-29 & Notice of Deviation
ML19323G516
Person / Time
Site: 07109001
Issue date: 03/24/1980
From: Potapovs U
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Wolfe B
GENERAL ELECTRIC CO.
Shared Package
ML19323G512 List:
References
REF-QA-99900382 NUDOCS 8006040035
Download: ML19323G516 (2)


Text

__ _

ea; UNITED S TATES

[

NUCLEAR REGULATORY COMMIS310N REG!ON IV

-311 AY AN Pt. AZA O RIV2. 3UlTE 1000

,a anunarcs '1::as not; b

'~~

z g \\gSG

... +

Docket Nos.

71009001/80-01 99900382/80-01 General Electric Company Nuclear Fuel and Service Division Attn:

Mr. B. Wolfe Vice President and General Manager 175 Curtner Avenue San Jose, California 95125 Gentlemen:

This refers to the QA Program inspection conducted by Mr. W. M. McNeill of this office on February 25-29, 1980, of your facility at Morris, Illinois associated with the records of spent fuel shipping casks and to the discussions of cur findings with Mr. W. C. Wheadon and members of your staff at the con-clusion of the inspection.

This inspection was made to confirm that, in the areas inspected, your QA Program is being effectively implemented.

The inspection effort is not designed to assure that unique quality requirements imposed by a customer are being implemented; nor to assure that a specific product, component or service provided by you to your customers, is of acceptable quality.

As you know, the NRC requires each of its licensees to assume full responsibility for the quality of specific products, components or services procured from others.

You should therefore not conclude that the NRC's inspection exempts you from inspections by an NRC licensee or his agents nor from taking effective cor-rective action in response to their findings.

Areas examined and our findings are discussed in the enclosed report. Within these areas, the inspection consisted of an examination of procedures and representative records, interviews with personnel, and observations by the inspector.

During the inspection it was found that the implementation of your QA Program failed to meet certain NRC requirements.

The specific findings and references to the pertinent requirements are identified in the enclosures to this letter.

Please provide us within thirty (30) days of your receipt of this report a written statement containing, (1) a description of steps that have been or will t

be taken to correct these items, (2) a description of steps that have been or I

will be taken to prevent recurrence, and (3) the date your corrective actions and preventive measures were or will be completed.

8006040 C 1

1

r-General Electric Company 2

Nuclear Fuel and Service Division In accordance with Section 2.790 of the Comaission's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter with enclosure and your reply, together with the enclosed inspection report will be placed in the Commission's Public Document Room.

If this report contains any

nformation that you believe to be proprietary, it is necessary that you make a written application within thirty (30) days to this office to withhold such information from public disclosure.

Any such application must include a full statement of the reasons on the basis of which it is claimed that the informa-tion is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.

Should you have any questions concerning this inspection, we will be pleased to discuss them with you.

Sincerely, i

I r

L N/buhD Uldis Potapovs, Chief, Vendor Inspection Branch

Enclosures:

1.

Notice of Deviation 2.

Inspection Report Nos. 71009001/80-01 99900382/80-01 l

-.