ML19323G332
| ML19323G332 | |
| Person / Time | |
|---|---|
| Site: | Quad Cities |
| Issue date: | 04/23/1980 |
| From: | Davis A NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Reed C COMMONWEALTH EDISON CO. |
| Shared Package | |
| ML19323G333 | List: |
| References | |
| NUDOCS 8006020185 | |
| Download: ML19323G332 (2) | |
See also: IR 05000254/1980007
Text
r
<r
+f*%
s
^4
UNITED STATES
~
8"
'n
NUCLEAR REGULATORY COMMISSION
f
a
REGl' N ill
O
e[
C
7tJ ROOSEVELT HOAD
%, ***** ,e
GLEN ELLYN, ILLINOIS 60137
APR 23 E60
.
' i
Docket No. 50-254
Docket No. 50-265
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Messrs. W. B. Grant, and
P. C. Lovendale of this office on March 25-27, 1980, of activities at
Quad Cities Nuclear Power Station, Units 1 and 2, authorized by NRC
Operating Licenses No. DPR-29 and No. DPR-30, and to the discussion
of our findings with Mr. N. Kalivianakis and others of your staff at
the conclusion of the inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted
of a selective examination of procedures and representative records,
observations, and interviews with personnel.
,
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
l
8006020 hl
I
w
w
r
.
8
Commonwealth Edison Company
-2-
APR 2 31960
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
h
M
A. B. Davis, Chief
Fuel Facility and
Materials Safety Branch
Enclosure:
IE Inspection
Reports No. 50-254/80-07
and No. 50-265/80-10
cc w/ encl:
Mr. D. L. Peoples, Director
of Nuclear Licensing
Mr. N. Kalivianakis, Plant
Superintendent
Central Files
Reproduction Unit NRC 20b
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
.
_ . - _ _ _ _ _ _ _ _
_
_ . _
- - - _