Notice of Deviation from Insp on 790521-25
ML19323G262
Person / Time
Site: Washington Public Power Supply System
Issue date: 06/13/1979
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML19323G260 List:
References
REF-QA-99900510 99900510-79-2, NUDOCS 8006020055
Download: ML19323G262 (1)


Text

.

o

.O United Engineers and Constructors, Inc.

Docket No. 99900510/79-02 NOTICE OF DEVIATION Eased on the results of an NRC inspection on May 21-25, 1979, it appeared that certain of your activities were not conducted in full compliance with your co itnents au indicated below:

Chapter 17.1.3, Design Control, subsection g. of the Washington Public Power Supply System Preliminary Safety Analysis Report requires that " Design documents and revisions thereto are distributed to responsible individuals in a timely manner-and contrplied to prevent inadvertent use of superseded material."

Contrary to this cc::xmitment, specification 9779-243, revision 11, issued for the procurement of Category I storage tanks on February 3',1975, contain seismic response spectra (pa ges 20/,-16,17, & 18) which were superseded by a revishn to calculations in April 1975; however, this specification was not revised and distributed to the supplier of these storage *A.

(See Details section II, paragraph B.3. for additional inforation).

/

d i)L/

t.

so usosoo gg 1

U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND EAFORCEMEh7 REGION IV Report No.

99900510/79-02 Program No.

51200 Co=psny:

United Engineers.& Constructors, Inc.

30 South 17th Street Philadelphia, Pennsylvania 19101 Inspection Condt.cted: May 21-25, 1979 Inspectors:

,-./,ff, fo//3/77 J. /Ry Costello, Principal Inspector Date bador Inspection Branch 0..$rifb l-,

O b l!im 6l13l79 I

D./G;. Anderson, Principal Inspector Date Wendor Inspection Branch Approved by:

M

'b ~7 k C. JQ;ile, Chief, Programs hvaluation Date Section, Vendor Taspection Branch Summag Inspection on May 21-25, 1979 (99900510/79-02)

Areas Insoected:

Implementation of 10 CFF. 50, Appendix B, criteria in the areas of design verification, design inspection, and action on previous inspection findings.

The inspection involved sixty-four (64) hours on site by two (2)

USNRC inspectors.

Results:

In the three (3) areas inspected one (1) deviation and one (1) unresolved item were identified in two (2) areas.

No deviations or unresolved items were identified in the other area.

D_eviation: Design Inspection -

the VPPSS-PSAF, a specification

ri
  • g R$'

$p J spe{s,..

Demineralized Water Storage Tank g$

{j EP*

Ag{lefe gejg,1yp %

been superseded.

.wo,t.w. ;d 'isE6. ?a~~v

4m1uthder
i gh Unresolved Item:

Design.,verifica y

3>

99 ve e

Design Review Control Logs, how c

fp4P wra f Q

b.

.M,a =isf T.Nes *N_[.N,_[ g U-

.j#ggg g#

and how to determine when a manag E-

~[

g pgyp

-e v

- +

_ _... _ _. _ _ _ - - -