o
.O United Engineers and Constructors, Inc.
Docket No. 99900510/79-02 NOTICE OF DEVIATION Eased on the results of an NRC inspection on May 21-25, 1979, it appeared that certain of your activities were not conducted in full compliance with your co itnents au indicated below:
Chapter 17.1.3, Design Control, subsection g. of the Washington Public Power Supply System Preliminary Safety Analysis Report requires that " Design documents and revisions thereto are distributed to responsible individuals in a timely manner-and contrplied to prevent inadvertent use of superseded material."
Contrary to this cc::xmitment, specification 9779-243, revision 11, issued for the procurement of Category I storage tanks on February 3',1975, contain seismic response spectra (pa ges 20/,-16,17, & 18) which were superseded by a revishn to calculations in April 1975; however, this specification was not revised and distributed to the supplier of these storage *A.
(See Details section II, paragraph B.3. for additional inforation).
/
d i)L/
t.
so usosoo gg 1
U. S. NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTION AND EAFORCEMEh7 REGION IV Report No.
99900510/79-02 Program No.
51200 Co=psny:
United Engineers.& Constructors, Inc.
30 South 17th Street Philadelphia, Pennsylvania 19101 Inspection Condt.cted: May 21-25, 1979 Inspectors:
,-./,ff, fo//3/77 J. /Ry Costello, Principal Inspector Date bador Inspection Branch 0..$rifb l-,
O b l!im 6l13l79 I
D./G;. Anderson, Principal Inspector Date Wendor Inspection Branch Approved by:
M
'b ~7 k C. JQ;ile, Chief, Programs hvaluation Date Section, Vendor Taspection Branch Summag Inspection on May 21-25, 1979 (99900510/79-02)
Areas Insoected:
Implementation of 10 CFF. 50, Appendix B, criteria in the areas of design verification, design inspection, and action on previous inspection findings.
The inspection involved sixty-four (64) hours on site by two (2)
USNRC inspectors.
Results:
In the three (3) areas inspected one (1) deviation and one (1) unresolved item were identified in two (2) areas.
No deviations or unresolved items were identified in the other area.
D_eviation: Design Inspection -
the VPPSS-PSAF, a specification
- ri
- g R$'
$p J spe{s,..
Demineralized Water Storage Tank g$
{j EP*
Ag{lefe gejg,1yp %
been superseded.
.wo,t.w. ;d 'isE6. ?a~~v
- 4m1uthder
- i gh Unresolved Item:
Design.,verifica y
3>
99 ve e
Design Review Control Logs, how c
- fp4P wra f Q
b.
.M,a =isf T.Nes *N_[.N,_[ g U-
.j#ggg g#
and how to determine when a manag E-
~[
g pgyp
-e v
- +
_ _... _ _. _ _ _ - - -