Forwards IE Insp Repts 50-440/80-05 & 50-441/80-05 on 800331-0401.No Noncompliance Noted
ML19323G008
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/26/1980
From: Fiorelli G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davisdon D
CLEVELAND ELECTRIC ILLUMINATING CO.
Shared Package
ML19323G009 List:
References
NUDOCS 8005300105
Download: ML19323G008 (2)


See also: IR 05000440/1980005

Text

__ _

_ _ _ _ _

_

_ _ _

- _ _ _ __

- _

_ _ - _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ -

TIC

$

o co (k

v

[8

UNITED STATES

3y

NUCLEAR REGULATORY COMMISSI7N

,

.. r

REGION 111

Q,

f#

799 ROOSEVELT ROAD

%, '

i ",d

GLEN ELLYN, ILLINOIS 60137

.....

APR 2 61980

Docket No. 50-440

Docket No. 50-441

The Cleveland Electric Illuminating

Company

ATTN: Dalwyn R. Davidson

Vice President - System

Engineering and Construction

Post Office Box 5000

Cleveland, OH 44101

Gentlemen:

This refers to the inspection conducted by Mr. K. D. Ward of this office

on March 31, and April 1, 1980, of activities at Perry Nuclear Power

Plant, Units 1 and 2, authorized by NRC Construction Permits No. CPPR-148

and No. CPPR-149 and to the discussion of our findings with Mr. M. R. Edelman

and others of your staff at the conclusion of the inspection.

The enclosed copy of our inspection report identifies areas examined

during the inspection. Within these areas, the inspectica consisted of

a selective examination of procedures and representative records, obser-

vations, and interviews with personnel.

No items of noncompliance with NRC requirements were identified during

the course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part

i

2, Title 10, Code of Federal Regulations, a copy of this letter, the

j

enclosures, and your response to this letter will be placed in the NRC's

4

Public Document Room, except as fo]Iows.

If the enclosures contain

information that you or your contractors believe to be proprietary, you

must apply in writing to this office, within twenty days of your receipt

of this letter, to withhold such information from public disclosure.

The application must include a full statement of the reasons for which

the information is considered proprietary, and should be prepared so that

proprietary information identified in the application is contained in an

enclosure to the application.

8005300 g (71g;

.

i

The Cleveland Electric

-2-

APR 2 61960

Illuminating Company

We will gladly discuss any questions you have concerning this

inspection.

Sincerely,

f8!!

G. Fiorelli, Chief

Reactor Const ruction and

Engineering Support Branch

Enclosure:

IE Inspection

Report No. 50-440/80-05

and No. 50-441/80-05

cc w/ enc 1:

Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Ohio

Power Siting Commission

Mr. Daniel D. Wilt, Attorney

Helen W. Evans, State

of Ohio

i

.

i

l