Forwards IE Insp Repts 50-327/80-12 & 50-328/80-07 on 800317-20.No Noncompliance Noted
ML19323F406
Person / Time
Site: Sequoyah  
Issue date: 04/18/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19323F407 List:
References
NUDOCS 8005280977
Download: ML19323F406 (2)


See also: IR 05000327/1980012

Text

-

...-

. .....~. - --.-.

.-

-

.

Y

,.

[

'o

UNITED STATES

dOF

',

8 ' g ~ ,,g

NUCLEAR REGULATORY COMMISSION

Sag

g

%

. ,, e

REGION 11

'

0,,

101 MARIETTA ST., N.W., sUlTE 3100

%*****

ATtANTA, GEORGIA 30303

i

APR 181980

In Reply Refer To:

'

RII:PKV

.'

50-327/80-12

50-328/80-07

Tennessee Valley Authority

,

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by P. K. VanDoorn of this office on

March 17-20, 1980 of activities authorized by NRC Operating License No. DPR-77

and Construction Permit No. CPPR-73 for the Sequoyah facilities, and to the

discussion of our findings held with T. B. Northern at the conclusion of the

inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

i

enclosed report. This item will be examined during subsequent inspections.

In acco.-dance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

1

inspection report will be placed in the NRC's Public Document Room.

If this

report coni. sins any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

to this office to withhold such information from public disclosure. Any such

application must include a full statement of the reasons on the basis of which

!

f

it is claimed that the information is proprietary, and should be prepared so

that proprietary information identified in the application is contained in a

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

.

8005280 f p

-

-

_

. _- .

.

Tennessee Valley Authority

-2-

J@R 181980

. . .

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

Sincerely,

.

i

C. E. Murphy, C

P.eactor Construction and

i

Engineering Support Branch

Enclosures:

Inspection Report Nos. 50-327/80-12

and 50-328/80-07

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

i

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

3. W. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

M. J. Burzynski, Project Engineer

400 Chestnut Street Tower II

Chactanooga, TN 37401

T. B. Northern

Construction Engineer

Post Office Box 2000

Spring City, TN 37381

H. N. Culver

249-A HBB

400 Commerce Avenue

Knoxville, TN 37902

,

'

L-.

,_

.

..

_.

..

--

. _ _

-

-.

--

---

'