ML19323F317

From kanterella
Jump to navigation Jump to search
Forwards LER 79-001/03L-1
Date released: 12/03/2019 Download: ML19323F317


LER 79-001/03L-1:on 791012,during Reactor Low Level 1 Channel Calibr & Functional Periodic Test,Instrument B21-LIS-NO178 Found Out of Calibr.Caused by Setpoint Drift. Switch Recalibr & Returned to Svc
ML19323F322
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323F322 (2)
Forwards LER 79-001/03L-1
ML19323F316
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/12/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To: OREILLY J P
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
Download: ML19323F316 (1)