Responds to Util 790702,1009 & 1113 Submittals Re Incomplete Fire Protection Program Items.Addl Info Request & SER Item 3.1 Open Issue Requirements Encl.Water Suppression Sys Adequate
ML19323E813
Person / Time
Site: Yankee Rowe
Issue date: 04/23/1980
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Kay J
YANKEE ATOMIC ELECTRIC CO.
References
NUDOCS 8005270267
Download: ML19323E813 (5)


Text

'

ff o

i-

  1. 44 9'c,
  • UNITED STATES

.[%e j

NUCLEAR REGULATORY COMMISSION

.dcg[/,!

C WASHINGTON. D. C. 20555 Acril 23, 1980 Docket No. 50-29

.c. Janes A. Kay Senior Engineer-Licensing Yankee Atomic Electric Company 25 Research Drive

'estborough, Massachusetts 01581

Dear t'r. Kay:

.le have reviewed your submittals dated July 2, October 9 and November 13, 1979, relating to the incomplete fire protection program items for Yankee-Rowe, identified in our Safety Evaluation (SER) dated P. arch 15, 1979.

Based on our review, the status of the incomplete items is presented in.

As indicated in Enclosure I we find the water suppression syste:r for the auxiliary boiler room to be acceptable. also identifies specific items for which we need additional information.

We advised you of this need by telephone. summarizes our re-quirerents to resolve the open issues relating to specific SER, 3.1 items.

Our consultant, Brookhaven national Laboratory (ENL) has assisted us in the review.

ENL's March 24, 1980, letter with their Yankee-Rowe Fire Protection Review report are included as Enclosure 3.

You are req.ested, within 30 days from receipt of this letter, to provide the needed information indicated in Enclosure 1 and to respond regarding your intentions to.eet our requirements identified in Enclosure 2.

incerely,

[O s

W >v.,%

,; g /3 Dennis L. Ziemann~ Chief Operating Reactor: Branch #2 Division of Operating Reactors Enci:sures: As stated i

9 THIS DOCUMENT CONTAlHS E

P00R QUAUTY PAGES 3

I:

1

.=-

1 8005270 M p

j

Mr. Jares A. Kay -

April 23,1980 CC i

Mr. J ares E. Tribble, President Yankee Atcaic Electric Ccmpany 25 Research Drive Westber: ugh, Massachusetts 01581 Greenfield Ccamunity College 1 College Drive Greenfield, Mas,sachusetts 01301 Chairran Board cf Selectmen l

Town of Rowe Rcwe, Massachusetts 01367 Energy Facilities Siting Council 14th Floor One Ashburton Place Besten, Massachusetts 02108 Director, Technical Assessment Division s

Office of Radiation Programs (A'J-459)

U. S. Environmental Protection Agen:y Crystai Mall #2 Arlington, Virginia 20460 U. S. Environmental Protection i

Agen:y Regicn I Office ATTN: IIS COORDINATOR JFK Federal Building Boston, Massachusetts 02203 i

4 T

A e

'I d

D

.m y

ENCLOSURE 1 STATUS OF RESOLUTION OF INCOMPLETE ITEMS FIRE PROTECTIO" PROGRAM FOR j

4 YANKEE-ROWE Licensee i

SER Item Staff Evaluation Response Due i

3.1.1 Fire Detection Systems (c) Containment Requirement

  • 30 days 3.1. 5 1.'ater. Suppression Systems (b) Diesel Generater Room Requirenent 30 days (c) Hydrogen Seal Oil Unit Requirement 30 days (d) Turbine. Building Requirement 30 days (e) Auxiliary Boiler Room Complete 3.1.6 Foam Suppression System Information 30 days 3.1.7 Gas Suppression System Requirement 30 days 3.1.12 Control of Combustibles (c) Diesel Fuel Line Requirement 30 days (d) Structural Steal Beams Requirement 30 days

)

3.2.1 Smoke Detection Systems Tests (1) In-Situ Deferred to SNL**

(2) Bench Tests Information 30 days **

3.2.2 Fire Water Supply Info rmation 30 days 3.2.3 Shutdown Capability Deferred to SEP A

t 4

1 7 All requirements are st=riarized in Enclosure 2.

  • - Criteria being developed by EllL.

r 'al..

~,

.x

tTRLUSunt 4 SU'MRY OF REOUIREMENTS TO RESOL"E SER 3.1 ITEMS _

0F FIRE PROTECTION FROGRAM FOR Y AN KEE-RC;.i 3.1.1 Fire Detection Systems (c) Centainment 1.

h'e will require early wa-ning' fire detection capability to be provided over in-situ-and transient combustibles, 3.i.5 ' at:- Suroressien Systems j

(b) Diesel Generator Room Sorinkler Svste 1 1.

We will require the use of 1/4 turn fire protection valves for use with the reacn rods for remote actuation capability on the fire crotection valves.

(c) Hydrocen Seal Oil Unit 1.

We will require that the speciai ha:ards system be sucolied from a separate connection to the looped plant fire protection header and that appropriate isolation valves be provided to assure that a single failure will not impair both the special hazard and turbine building sprinkler system.

(d) Turbine Euildino o

fl.

In reviewing the drawings submitted by the licensee, we were not able to determine whether there was a cross c:nnection between the s:ecial ha:ards system and tne turbine building sprinkler system. Therefore, we will require that the soe:f al hazard system (column water sprays and hydrogen seal and turbine cil cooler deluge system) be isolatsd frem the turbine building sprinkler systems by rem: val of any crcss connections to the zone i sprinkler system and by providing an incependent connection :: the io: ped fire protection supply header, with adec: ate valves installed to isolate the c:enection from the :rinkler system connection.

2.

We will require that the standoi;e hose stations be su:olied from an inde:encent ::nnecticn to the looped fire protec icn supply header and valves added so that a single failure of the # ire protection system will net impair both s:rinklers and stand:ipe hose stations.

3.

We will require that tne tur:ine buildin; sorinkler systems be exoanded t: :rovide ccm:lete area protection for the area under the tur:ine uilding :perating ficer.

2-3.1.l2 Control of C: bustibles (c) Diesel Fuel Oil Line (1)

'le will require that the diesel fuel oil.line out-site the diesel generator roces -be rerouted to

reciude exposure of the 450V switchgear and the hi;h and low pressure safety injection pumps.

(d) Diesel Generator Rooms

~

(1) We will require a one-hour rated fire retardant coating

~

in accordance with the provisions of ASTME-119 for the structural steel beams in the diesel generator rooms.

3.1.17 Gas Sucoression System (1) We will require that the detection system be of the early warning type, i.e. ionization or photoelectric. Actuation-cf the Halon System shall be either a cross-zoned or matrix pattern, but in either case no more than two detector alarms shall be required for system actuation.

1 f

a b

2 r

a e

-n 7

ENCLOSURE 3

3. *. i.* t e s i
  • t. i.,,~ _= i *', *~.. w
  • z.sj y r y-.
  • s

.r=1. w n;r=.

_,.ww..~a

. 0 0 ^ G..

~2. 9 f '.'..\\

N*

s

0..C ' 6 :. :.b'.'. v.

2 1.

w

.. a 6:*0r. '.Gw cN

'O~~

s::- e : %c.sc. Eregy (5":)2.:5-21tt l

l March 24, 1980 1

1 Mr. F.cbert L. Ferguson l

l P11.t Systems 3 ranch U. S.

N'.

ear Regulatory Ce missicn

'.'ashington, D.C.

20555 RE: Yankee Rowe, Fire Protection Review, Items 3.1.5 and 3.1.12(d).

Cear Bob:

1 J

Enclosed are items 3.1.5, Water Suppression Systems, and 3.1.12(d),

Ccn rol of Combustibles (d - exposed structural steel D.G. r0cm).

l We do not have sufficient information on items 3.1.1, 3.1.6, 3.1.7, 1

3.1.12(c), 3.2.1, or 3.2.3.

Item 3.2.3 is not assigned to us.

This c:rpletes the present Brookhaven National Laboratory input to Yankee Rowe.

Sincerely yours, yy: j.o., u/.,; p3n//

m

/

'~

mx y.-

Robert E. Hail, Grcup Leader F.sactor Engineering Analysis enclCsure cc.-

L. Derderian J. Eisenhut W. Kato wo/ enc.

  • i. Levine E. VacDougall
7. Fanciera E. Sylvester DUPLICATE DOCUMENT Entire document previously l

entered into system under:

'NO h

b[O No. of pages:

/

-.. -