Forwards Addl Info Clarifying 800317 Response to Violations Noted in IE Insp Rept 50-219/79-18.Corrective Actions:Proper Gas Meter Received & Air Sampling Sys Completion Planned for 800630.Noncompliance B.6 Completion Expected by 800901
ML19323E398
Person / Time
Site: Oyster Creek
Issue date: 05/19/1980
From: Finfrock I
JERSEY CENTRAL POWER & LIGHT CO.
To: Stello V
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE)
References
NUDOCS 8005230496
Download: ML19323E398 (2)


Text

o n

.r.n) "<.

m-i,1:j I f g-)

- -*~ -

)*

Jersey Central Power & Light Company IciW M(. T h,. J d ;

Madison Avenue at Punch Bowl Road Morristown, New Jersey 07960 (201)455-8200 p

May 19, 1980 Mr. Victor Stello, Jr., Director Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, D. C.

20555

Dear Mr. Stello:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Inspection Report No. 50-219/79-18 This letter is to bring to your attention certain clarifications, corrections and additions to my letter of March 17, 1980 in which JCPSL submitt i formal responses to the findings of the inspection conducted by the NRC Performance Appraisal Branch (PAB).

Enclosed as Enclosure A are the corrections to the original submittal. These were discussed in our meeting of April 29, 1980 with representatives of the NRC's Region I in King of Prussia.

If there are any questions regarding the enclosed information or additional information is required, please contact me.

Very truly yours, Ivan R. Finf ek, r.

Vice President la Enclosures cc:

Boyce 11. Grier, Director U.S. Nuclear Regulatory Commission Region I 631 Park Avenue King of Prussia, Pennsylvania 19406

$00 THIS DOCUMENT CONTAINS S

8005230 % q POOR QUAUTY PAGES jl

~

Jersey Central Power & Light Company is a Member of the General Public Utilmes Systern

ENCLOSURE A I.

Attachment A to the 3/17/80 Letter

.In response to the item of noncompliance E. page 11, " calibration procedures had not been written and implemented as of November 2, 1979", a response to the finding for the environmental air samplers was inadvertently Icft out.

In response, the item of noncompliance is correct as stated.

New air sampling systems were purchased in 1979 for all sampling stations. They were received with the wrong gas meters which had to be replaced.

The correct meters have been received.

The changeout of the air sampling systems will be completed by June 30, 1980. At that time completed procedures and schedules for calibration will be impicmented.

.In response to item of noncompliance B.6, page 8, for the corrective actions to be taken, a completion date of September 1, 1981 was given. The date should be September 1, 1980.

II.

At' chment B to the 3/17/80 Letter

.In Attachment B, page 9, it is stated that the Radwaste Shipping Supervisor Position will be filled by May 1,1980.

On page 35 of the same attachment the date given is August 1, 1980.

The correct date is bby 1, 1980. An acting Radwaste Shipping Supervisor was appointed on April 23, 1980.

. Attachment B, Page 21 - In describing the organizational structure for the reorganized radiation protection program, it was not explicitly stated who the Supervisor-Radiation Protection reported to in the organization.

This position will report directly to the Station Manager assuming the Technical Specification Change Request No. 85 submitted May 2, 1980 is approved. A copy of that request is attached.

t i

i

j i

Jersey Central Pov.er & t.ight company

- ').

p.

,,I

'f

)

Ma$ son Avenue at Pur.;h Sawl Read

  • ),

Morristown. New Je'sey OM60 c.

(201)455-6200 i

May 2, 1980 Director Nuclear Reactor Regulation United States Nuclear Regulatory Commission Washington; DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Technical Specification Change Request No. 85 i

In accordance with 10 CFR 50.59 and 10 CFR 50.90, Jersey Central Power & Light Company, owner and operator of the Oyster Creek' Nuclear Generating Station, Provisional Operating License No. DPR-16, requests changes to Appendix A of that license.

This Technical Specification Change will, when approved, provide-he highest level of station management attention to our Radiation Protection program, and establish a Manager of Training position that will result in improvements and control over all Gercration Division training.

This Technical Specification Change Request has been reviewed and approved by the Station Manager, the Plant Operations Review Committee, and an Ind e:p e nd e n t Safety Review Group in accordance with Section 6.5 of the Oyster Creek Technical f.pecifications.

We have determined that this submittal is Class II per 10 CFR 107.22 and have enclosed a check for $ 12 0 0. 0 0 pursuant to that section.

Very truly yours, lN Ivan R.'Fi ro

, Jr.

Vice Presi ent hpypyws Jasey Cen:ral Poaur & Lght Company is a IAember of tre General PutAc Utates Systern

JERSEY CENTRAL POWER & LIGHT COMPANY

)

OYSTER CREEK NUCLEAR GENERATING STATION (DOCKET NO. 50-219)

FROVISIONAL OPERATING LICENSE NO. DPR-16 Applicant hereby requests the Commission to change Appendix A to the above-captioned license as follows:

1.

Sections to be chanced Sections' 6.3, 6.4, and 6.5 2.

Extent of Changes Thischangeincorporatestheprohosedchangesforthefacilitystaff reorganization.

3 Changes requested Replace Section 6, Pages 6-2a, 6-2b, 6-3, 6-4, and 6-6 of revised Section 6 pages.

4.

Discussion 1

Changes to the plant and Generation Organization are being mcde in an effort to improve key functional areas at the Oyster Creek Station.

The fi rst organizational change involves the addition of a flanager of Training reporting directly to the Vice President, Generation with the station training functions reporting to him.

It is felt this will broaden the perspective of training and provide better support for the expanding training needs of the Station.

The second organizational change involves a reorganization of the Radiation Protection function at the Station. The Supervisor, Radiation Protection will now report directly to the Station Manager.

The Radiation Protection staf f has also been expanded in order to provide a higher level e

of protection in the Health Physics area.

The final organizational change directs the Fire Protection Supervisor to report to the Plant Support Superintendent. The importance and compicxity of fire protection and prevention at Oyster Creek requires this individual 2

be placed at this level within the organization to assure adequate attention j

is.given to this area.

i 0

h

}(

goosolos/s?

1 7

.y

,- ---i.

i Ze exparicnce snall be in such creas as reactor pnysics, core measurements, core heat transfer, and cor.e pnysics testing progrcms. Successful completion of c reactor engineering training program (suen as tne 12 ween concentre.teo

, ro: rems of f ered by :;33 Ven6 ors) may oc equivalent to one year's nuclec pser plant exp2rience.

Orervicar Station Mechanical Maintenance Ecquirements:

Seven years of total power plant experience of which one year m.: t be nuclect power plant experience.

Two years of academic or relcted tecnnical training may fulfill two of tne remaining six years of. required o:parience.

]

harvisor station Instrunent & Electrical Maintencnce 14quirements:

Five years of experience in instrtraentation and control, of wnich a minimum of cne year shall be in nuclear instrumentation and control at an operating nuclear power plant.

A maximum of four years of this five year experience may be fulfilled by related technical or academic training.

4 Engineering supervisor

.l Tne engineer in cnarge of technical support shall have a Bachelor's Degree in Engineering or the Physical Sciences and have three years of professional level e>.perience in nuclear services, nuclear plant operation, or nuclear engineering, and the necessary overall nuclear background to determine when to call consultar. and contractors for dealing with complex problems beyond t.he scope of owner-organization expertise.

Suoervisor Radiatinn Protection M quirements: Bacnelor 's degree or the equivalent in ~a science or engineering L

caject, including some formal training in radiation protection.

Five years of p:ofessional experience in applied radiation protection.

(Master's degree equivalent to one year experience and Doctor's degree equivalent to two years a:perience waere coursework related to radiation protection is involved.) Tnrce years of tnis professional experience should b) in applied rcdiation protection worn in a nuclear f acility dealing with radiological proble.Ts similar to tncse er.countereo in nuclear power stations.

Cnemical Sutervisor Mquirements:

Five years exparience in enemistry of which a minimum of one year i

shall Ec in radiochemistry at an operating nuclear power plant.

A maximum of fcur yccrs cf this five year experience may be fulfilled by related technical or r.cz.demic training.

4 6.4 TRAI!?I!4G 6.4.1 A retraining program for operators shall be maintained under the direction of the Manager of Training and shall meet the requirements and recommendation _of Appendix A of ~10CFR Part 55.

Replacement 6-2a

. ~.,

training programs, the content of which shall meet the req.zirements of 10CFR Part 55, shall be conducted under the direction of the F. ant.ger of Training for licensed operators and Senior Reactor Operators.

i 6.4.2 I

A training program for the Fire Brigade shall be maintained under the 4

direction of the Manager of Training.

6.5 SAFCIY REVIEW AND AUDIT I

The Station Manager and three organizational units, the Plant j

Operations Review Committee (PORC), the Ind-endent Safety Review Groups (ISRG) and the General Office Review Board (GORB) function to accomplish nuclear safety review and. audit of the Oyster Creek Station.

4 1

I i

-i I

i

{

l i

l i

i i

4 i

l 1

l I.

6-2b t

1

4 3

-f d"?6 i"*

U.:.

Un

  1. /

vday u

a 107E

7. 2 L hi:

z --

c..a.

<z

=-

-5

-v.

a 6,_ e,

.5 5

G g

~.._ -

u wa

^

4 =,#

~

cm-

-=4 d

eg 4-

=

eg h

  • [ f.

e <

,,a

s. E g CQ We c =.g

.--v e

7 5,-

"5 9 w Zd3 C:a s

gM e

-g

=

-a-

= -

" o-z*

eed 8-**

ene s.

4 ig

  • =dm 4

at hw

.. - u a C

/ G se -. / g- #.

O e-

'd v -

f E bim u a >= l4* d =*

n we d.

a47-e Ed

& WN M

5..

J nJ ams nV.

m.a C

v 7 e'4 De i~p =~.

me e= 6-= et Q/

G4-n sf b en

< aa; a :a < ttt we

>- sc ~ **

/ wc D" VW ma -

.fL m V 'd 8 44S Y

g a

L'*

C

~E -

s =i.

2.-

=

  • - ~t e

a, Se "e8

- hp d P" tJ e

ie e.y GmA

=-e

/ /U

$ u en.

ew4 e

..O 4,

3

  • 4 l

Om* M

.. x ZY

$5

@ O ed aJ w w e *"

te g

%nf hr2 j

.. a

/C

-N C

l l-E Diet #4 d

-o M&

3.J.-5

/.

6 I

.+

+3 We

,, ES

.a - < ~dCe a

-G J,, p.e c

m e

F *" I"T d

/d*V C

"v. O

; /

a a.o

-a25

MTQJ it A MANatJ r e

SUPTRYl%DR DIRECT 0lt PLANT StFroRT tmIT RADIATIOpf PROTECTION STATION SIFa k!K1TNI4 NT Sifrt RIETIN!W Al AfstIhlSIRATION PLANAGUENT CUNTROL StFfRVISOR e

RADIOLOCICAL RADIOLOGICAL RADIOLOGIAL RADIATION SUPERYl50R SilrERVISOR SIFERVISDR SIFLR)l$0k STATION STAfl0N STATIos Ort 2AT10NS StFr0RT ENGINEERING PROTECTION MD-R9fE SurERVISOR SUPERV150R SurERVISOR TRAINING t[OLAhlCAI.

I&E Organtings COORDINATOR MAINTTNANCF MAINIENAACE I

l 080"P S313 FI g,p egfggty y

Stirt Rt lwa i

TTOPICAL COPrt ITR ENGl!EIRING OlfbilCAL gggg rp0TECTION StFERVISOR StCURITY SUPERVISOR Aftt!NISTR ATIVE SIFERVISOR ArrLICATIONS StirERYlSOR StirTRVISOR Stirf RVISOR STATION StFTRVISOR noctptET SurERVisnR SlFERVISOR SERVICES CONTROL TEO#ilCIANS 'l/ SHIFT gwy,pt UU prre Org UTu I,

NUTE: 71st StFTRVISOR STATION OPERATIONS

  • l AND TIE CROUP SHIFT EUPERVISOR REQUIRE SENIOR RI. ACTOR OrrRATORS EQUlrMENT e37$ng g y LICENSES. Tite C0KTROL R0twe Ort.RATORS Of*ERATOR RfQUIRES A REACTOR OPERATORS LICENSE
  • SHlfT STAFFING TICURE 6.2.2 OTSTER CREEK STAfl0N CONDUCT OF OPERAfl0NS 04 ART l

6-4 I

e, i

e 52.59 sni11 also te rainthined at the station.

G.5.2 E:nt Cgeratinns Feview Coraittee (PChC)

.. u t..,....

ii.5.2.1 li.e POPC snall funation to advise the Statio7 i :.n39er.

y:.ea u w..

6.5.2.2

'a in Forsc r,nai j conair.t of tr e followin g pic-nt U rnannel:

Unit Superintendent c:anagement Control Supervisor t.ngineering Supervisor Plant Supp;r t 3cparintendent Supervisor Radiation Protection

{

The Station Manager shall designate the Chairman and Vice-Cnairman from among tne PORC memcers.

. LTt.FRATt.S 6.5.2.3 Alternate r. embers shall be appointed in writing t.y the PORC Cnairman and will tave the typ2 of exp2rience and training required of reculcr member s.

i:,caever, tney need nt,t nave tne cxtensive longevity in tne designated fields as long ac in tne opinion of the Chairmrn, tncir x; er i ene.

..ni jtrif w.nt c.: n e,irtp.- t.,

. i...,,.,,,,,t~l.

s.'-

..ma, we,.su 5.5.2.4 Ir.e PCRC snail meet at least once per calendar r.onta and as convene 6 by tne PCrC Cnairman or tne Station :'.anager.

CEUM 6.5.2.5 A quorun of tne PORC shall consist of tne Chairman or Vice Chairman and three ten;bers/ alternates.

No more tnan two alternate members i

shall be counted in establisning a quorum.

_T_i.5TGSI _ I LITIES G.5.2.6

'ine responsibilities of tne PORC are included in Table 6.5.1.

6-6