ML19323E281
| ML19323E281 | |
| Person / Time | |
|---|---|
| Site: | Dresden, Oconee, Pilgrim, Brunswick, Surry, 02700047 |
| Issue date: | 04/07/1980 |
| From: | Stohr J NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | AFFILIATION NOT ASSIGNED, CAROLINA POWER & LIGHT CO., DUKE POWER CO., VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.), WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP. |
| Shared Package | |
| ML19323E282 | List: |
| References | |
| NUDOCS 8005230330 | |
| Download: ML19323E281 (2) | |
Text
______ -
[** **%'o f/0 UNITED STATES P
g NUCLEAR REGULATORY COMMISSION 4
{
E REGION 11 e
o, 101 MARIETTA ST., N.W., SUITE 3100
%.....o ATLANTA, GEORGIA 30303 In Reply Refer To:
APR - 71980 RII:RAB 1500039 REGION II ADDRESSEES (See Attachment A)
Gentlemen:
This refers to an unannounced inspection conducted by R. A. Brown of this office on March 13 and March 14, 1980. A shipment of radioactive waste shipped from your facility was inspected upon arrival at the Chem-Nuclear Systems, Inc.,
Barnwell, South Carolina disposal site.
Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of a review of the shipping papers, placarding and labeling requirements, radiation measurements, r. elective contamination surveys, and observations by the inspector.
Within the scope of this inspection, no items of noncompliance were disclosed.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room. If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such information from public disclosure. Any such application must include a full statement of the reasons oa the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary infor-mation identified in the application is contained in a separate part of the document. If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document Room.
j Should you have any questions concerning this letter, we will be glad to discuss them with you.
Sincerely,
. Philip St r, Chief '
uel Facilit and Materials Safety Branch
Enclosure:
Inspection Report No. 1500039 cc: See Page 2 8005230330
APR-71980.
i cc:
U.S. Department of Transportation 1
ATTN: William L. Barrow Federal Highway Administration 1720 Peachtree Road, N.W., Suite 200 Atlanta, Georgia Chem-Nuclear Systems, Inc.
ATTN: Lee Hebbard, Site Manager 4
P. O. Box 726 Barnwell, South Carolina 29812 W. L. Stewart, Manager P. O. Box 315 Surry, VA 23883 A. C. Tollison, Jr.
Plant Manager Box 458 Southport, NC 28461 J. E. Smith, Station Manager P. O. Box 1175 Seneca, SC 29678 4
0
... -,, -