Text

From: Pulvirenti, April Sent: Tuesday, November 19, 2019 10:04 AM To: Zamber, Maria

Subject:

SUBJECT:

WATERFORD UNIT 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.8.1.1, AC SOURCES.

Maria, By letter dated October 24, 2019, 2019 (ADAMS Accession No. ML19297H543), Entergy Operations, Inc.

(Entergy) submitted a request for an amendment to Renewed Facility Operating License No. NPF-38 for Waterford Steam Electric Station, Units 3 (Waterford 3). The proposed change would revise Technical Specification 3/4.8.1, A. C. Sources - Operating, Surveillance Requirements (SR) to correct errors in some criteria for voltage and frequency. The changes ensure would ensure compliance with the plant design basis and ensure that the Emergency Diesel Generators are capable of supplying power with the correct voltage and frequency to the required loads.

The purpose of this e-mail is to provide the results of the acceptance review of this amendment request.

The acceptance review was performed in accordance with NRR Office Instruction LIC-109 to determine if there is sufficient technical information in scope and depth to allow the NRC staff to complete its detailed technical review. The acceptance review is also intended to identify whether the application has any readily apparent information insufficiencies in its characterization of the regulatory requirements or the licensing basis of the plant.

NRC has reviewed the application and concluded that it does provide technical information in sufficient detail to complete its detailed technical review and make an independent assessment regarding the acceptability of the proposed changes in terms of regulatory requirements and the protection of public health and safety and the environment. Given the lesser scope and depth of the acceptance review as compared to the detailed technical review, there may be instances in which issues that impact SCPBs ability to complete the detailed technical review are identified despite completion of an adequate acceptance review. If additional information is needed, we will let you know by separate correspondence.

Based on the information provided in your submittal, the NRC staff has estimated that this licensing request will take approximately 350 hours14.583 days <br />2.083 weeks <br />0.479 months <br /> to complete. The NRC staff expects to complete this review in approximately 12 months, which is November 19, 2020. If there are emergent complexities or challenges in our review that would cause changes to the initial forecasted completion date or significant changes in the forecasted hours, the reasons for the changes, along with the new estimates will be communicated during the routine interactions with the assigned project manager.

These estimates are based on the NRC staffs initial review of the application and they could change, due to several factors including requests for additional information, unanticipated addition of the scope to the review, and review by NRC advisory committees or hearing-related activities. Additional delay may occur if the submittal is provided to the NRC in advance or in parallel with industry program initiatives or pilot applications.

If you have any questions, please contact the Waterford 3 Project Manager, April Pulvirenti, at (301)-

415-1390.

April Dr. April L. Pulvirenti Project Manager, Waterford Unit 3 United States Nuclear Regulatory Commission Office of Nuclear Reactor Regulation 301-415-1390

Hearing Identifier: NRR_DRMA Email Number: 317 Mail Envelope Properties (MN2PR09MB3983A7FB950FFDFA53A70DF98F4C0)

Subject:

SUBJECT:

WATERFORD UNIT 3 - ACCEPTANCE OF REQUESTED LICENSING ACTION RE: LICENSE AMENDMENT REQUEST TO REVISE TECHNICAL SPECIFICATION 3.8.1.1, AC SOURCES.

Sent Date: 11/19/2019 10:04:00 AM Received Date: 11/19/2019 10:03:00 AM From: Pulvirenti, April Created By: April.Pulvirenti@nrc.gov Recipients:

"Zamber, Maria" <mzamber@entergy.com>

Tracking Status: None Post Office: MN2PR09MB3983.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 3262 11/19/2019 10:03:00 AM Options Priority: Normal Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: