ML19323D968

From kanterella
Jump to navigation Jump to search
Forwards Waste Packaging Insp Rept 80-02A on 800206-08. No Noncompliance Noted
ML19323D968
Person / Time
Site: 02700047, Peach Bottom
Issue date: 04/02/1980
From: Galen Smith
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To: Daltroff S
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
Shared Package
ML19323D969 List:
References
NUDOCS 8005220602
Download: ML19323D968 (2)


Text

,

nn

  • T 4 o,,

UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

s a

REGION 1 9

631 PARK AVENUE

%7..G...[

KING OF PRUSSIA, PENNSYLVANIA 19406 Docket Nos. 50-277 50-278 APR 0 21980 Philadelphia Electric Company ATTN: Mr. S. L. Daltroff Vice President Electric Production 2301 Market Street Philadelphia, Pennsylvania 19101 Gentlemen:

Subject:

Inspection No. 15000039/80-02A This refers to an unannounced inspection conducted by R. A. Brown of our Region II office on February 6, 7, and 8,1980. A shipment of radioactive waste shipped from your facility was inspected upon arrival at the Chem-Nuclear Systems, Inc., Barnwell, South Carolina disposal site.

Areas examined during the inspection and our findings are discussed in the enclosed inspection report. Within these areas, the inspection consisted of a review of the shipping papers, placarding and labeling requirements, radiation measurements, selective contamination surveys, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's. " Rules of Practice," Part 2, ritle 10, Code of Federal Regulations, a copy of this letter and the enclosed inspection report will be placed in the NRC's Public Document Room.

If this report contains any information that you (or your contractor) believe to be proprietary, it is necessary that you make a written application within 20 days to this office to withhold such int )rmation from public disclosure. Any such application must include a full sta:ement of the reasons on the basis of which it is claimed that the information is proprietary, and should be prepared so that proprietary information identified in the application is contained in a separate part of the document.

If we do not hear from you in this regard within the specified period, the report will be placed in the Public Document

Room, l

i Should you have any questions concerning this letter, we will be glad to discuss them with you.

l Sincerely, G

(

Gear e H Sm th, Chief Fuel Facility and Materials 5 fety Brech

Enclosure:

Inspection Report No. 15000039/80-02A 8 005220 N1

Philadelphia Electric Company 2

APR 0 21980 cc (w/ encl):

W. T. Ullrich, Station Superintendent Troy B. Conner, Jr., Esquire (Without Repo,2)

Eugene J. Bradley, Esquire (Without Report)

Raymond L. Hovis, Esquire (Withou' Jort)

Michael J. Scibinico, II, Assist...c Attorney General (Without Report)

~

-