ML19323D584

From kanterella
Jump to navigation Jump to search
Notice of Proposed Renewal of License R-78
ML19323D584
Person / Time
Site: 05000148
Issue date: 04/24/1980
From: Reid R
Office of Nuclear Reactor Regulation
To:
Shared Package
ML19323D582 List:
References
NUDOCS 8005210709
Download: ML19323D584 (4)


Text

.

7590-01 O

V UNITED STATES NUCLEAR REGULATORY COMMISSION DOCKET NO. 50-148 THE UNIVERSITY OF XANSAS NOTICE OF PROPOSED RENEWAL OF FACILITY LICENSE The United States Nuclear Regulatory Commission (the Commission) is considering renewal of Facility License No. R-78, issued to The University of Kansas (the licensee), for operation of the pool-type nuclear reactor located on the licensee's campus at Lawrence, Kansas.

The renewal would extend the expiration date of Facility License No. R-78 to April 7,1990, in accordance with the licensee's timely application f:r ranewal dated March 4,1980.

Prior to renewal of the license, the Commission will have made findings required by the Atomic Energy Act of 1954, as amended (the Act) and the Comission's regulations.

~

By June 2, 1980

, the licensee may file a request for a hearing with respect to renewal of the subject facility license and any person wh:se interest may be affected by this proceeding anc who wishes to parti:i-pa e as a party in the proceeding must file a written petition for leave o intervene. Recuests for a hearing and petitions for leave to intervene shall be filed in accordance with the Commission's " Rules of Practice for Ocrestic Licensing Frc:eedings" in 10 CFR Part 2.

If a recuest for a hearing cr :etit::n fcr leave :c intervene is filed by the above date, tne Ccr-issi:n

r an A::-ic Safety 3.: Licensir.; E:ard, designated by tr.e Cc issien er :,

the :hai an cf the at:-ic Safety ar: Licensin; Scard Panel, will rule : : e re:;est 1.d/or petitier ar.d the Se:retary or the designated At:mic Safe,

in: Li:er. sing E:ard will issue a notice of hearing er an apprc::riate Ords.

80GCLO

1 4

' 7590-01 As required by 10 CFR !2.714, a petition for leave to intervene shall set forth with particularity the interest of t'he petitioner in the proceeding, and now that interest may be affected by the results of the proceeding.

The petition should specifically explain the reasons why intervention should be permitted with particular reference to the following factors:

(1) the nature of the cetitioner's right under the Act to be made a party to the proceeding; (2) the nature and extent of the petitioner's property, financial, or other interest in the proceeding; and (3) the possible effect of any order which may be entered in the proceeding on the petitioner's interest. The petition should also identify the specific aspect (s) of the subject matter of the proceeding as to which petitioner wisnes to intervene. Any person who has filed a petition for leave to intervene or who has been admitted as a party may amend the petition without requesting leave of the Board up to fifteen (15) days pricr to the first prehearing conference scheduled in the proceed-ing but such an amended petition must satisfy the specificity requirements described above.

Not later than fifteen (15) days prior to the first prehearing cor.fer-ence scheduled in the proceeding, a petitioner shall file a supplement to the petition to intervene which must include a list of the contentions which are sought to be litigated in the matter, and the bases for each contention set forth with reasonable specificity. Contentions shall be li;-ited to ma-ers wi nin the scc;e c# the renewal ac-icn under considera-

.icn.

A peti ticr.er d: fails to file such a succle: ent which satisfies

nese re:uire.ar.ts wi:n res:sct to a: least cr.e ccn:er.ticn will no! :s pEr:.itted to ?!rticipi*.e as a part;..

I

- 7590-01 Those permitted to intervene become parties to the proceeding,

' subject to any limitations in the order granting leave to intervene, and have the opportunity to participate fully in the conduct of the hearing, including the opportunity to present evidence and cross-examine witnesses.

A request for a hearing or a petition for leave to intervene shall be filed with the Secretary of the Ccmmission, United States Nuclear Regulatory cot.r.ission, Washington, D. C.

20555, Attention:

Docketing and Service Section, or nay be delivered to the Commission's Public Document Room,1717 H Street, N.W., Washington, D. C.

by the above date. Where petitions are filed during the last ten (10) days of the notice period, it is requested that the petitioner or representa-tive for the petitioner promptly so inform the Commission by a toll-free telephone call to Western Union at (800) 325-6000 (in Missouri (800) 342-c700). The Western Union operator should be given Datagram Identification Number 3737 and the following message addressed to Robert W. Reid:

(petiticner's name and telephone number); (date petition was mailed); (Kansas); and (publication date and page number of this FEDERAL REGISTER notice). A copy of the petition should also be sent to the Executive Legal Director, U. S. Nuclear Regulatory Commission, Was.ington, D. C.

20555.

N:n-irely #ilings :# :etitions #:r leave to intervene, amended petitions, s;;:le sr.:Si petitions and/or retuss:s for hearing will not be entertaired a:sen a determica:ict :;. :ne Con-ission, :ne presicing officer or the At:mic Sa#et; and _icersing E:1: designa:e: :o rule on : e :etitien and/or re:uest, i

a: t s Ostiticner has ade a subs:an:ial sn: wing cf ;200 cause for the l

- 7590-01 grantir g of a late petitien and/or request. That determination will be based upon a balancing of the facters specified in 10 CFR 12.714(a)(1)-(v) and$2.714(d).

For further details with respect to this action, see the application for renewal dated March 4, 1980, which is available for public inspection at the Commission's Public Document Rcom,1717 H Street, N.W. Washington, D. C.

~

Dated at Bethesda, Maryland, this 24th day of April,1980.

FOR ThE NUCLEAR REGULATORY COMMISSION

(

/

'/-.'

em Robert W. Reid, Chief Operating Reactors Branch #4 Division of Operating Reactors I

T b

_.