ML19323D014

From kanterella
Jump to navigation Jump to search
Forwards Emergency Operating Procedures EP/1/A/5000/01,03, 04,07 & 19
ML19323D014
Person / Time
Site: Mcguire, McGuire  Duke Energy icon.png
Issue date: 05/15/1980
From: Parker W
DUKE POWER CO.
To: Harold Denton, Youngblood B
Office of Nuclear Reactor Regulation
Shared Package
ML19323D015 List:
References
NUDOCS 8005190535
Download: ML19323D014 (1)


Text

.

DUKE POWER COMPANY Powra Bt:ttomo 422 SocTu Cut:acu Sinett, CruatorTE, N. C. as24a M 4AM 3.PA8dCR.JR. May 15, 1980

/ge Pers>Cf%F TE'EP=0*C.AaEA 704 Sec.,anoowcmo= 373-4063 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C. 20555 Attention: Mr. B. J. Youngblood Light Water Raactor Project Branch No. 2

Subject:

McGuire Nuclear Station Docket Nos. 50-369 and 50-370

Dear Mr. Denton:

As requested by Mr. R. Birkel, NRC Project Manager for McGuire Nuclear Statiou, enclosed are three copies of selected McGuire emergency operat-ing procedures. The following procedures are transmitted herein:

EP/1/A/5000/01 Reactor Trip EP/1/A/5000/03 Loss of Reactor Coolant EP/1/A/5000/04 Steam Generator Tube Failure EP/1/A/500G/07 Steam Line Rupture EP/1/A/5000/19 Feedwater Line Rupture These procedures are being transmitted to initiate the NRC emergency pro-cedure review identified as a NTOL requirement (Action Plan Item I.C.8).

These procedures are also being sent to Westinghouse to initiate the vendor review of procedures also identified as a NTOL requirement (Action Plan Item I.C.7).

V y truly yours, l

O A-= ~ ~ - - d- *

/ William O. Parker, Jr. '

\

IS$ents THIS DOCUMENT CONTAINS P00RQUAUTYPAGES -

<