ML19323D014
| ML19323D014 | |
| Person / Time | |
|---|---|
| Site: | McGuire, Mcguire |
| Issue date: | 05/15/1980 |
| From: | Parker W DUKE POWER CO. |
| To: | Harold Denton, Youngblood B Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19323D015 | List: |
| References | |
| NUDOCS 8005190535 | |
| Download: ML19323D014 (1) | |
Text
.
DUKE POWER COMPANY Powra Bt:ttomo 422 SocTu Cut:acu Sinett, CruatorTE, N. C. as24a M 4AM 3.PA8dCR.JR.
May 15, 1980
/ge Pers>Cf%F TE'EP=0*C.AaEA 704 Sec.,anoowcmo=
373-4063 Mr. Harold R. Denton, Director Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Washington, D. C.
20555 Attention:
Mr. B. J. Youngblood Light Water Raactor Project Branch No. 2
Subject:
McGuire Nuclear Station Docket Nos. 50-369 and 50-370
Dear Mr. Denton:
As requested by Mr. R. Birkel, NRC Project Manager for McGuire Nuclear Statiou, enclosed are three copies of selected McGuire emergency operat-ing procedures. The following procedures are transmitted herein:
EP/1/A/5000/01 Reactor Trip EP/1/A/5000/03 Loss of Reactor Coolant EP/1/A/5000/04 Steam Generator Tube Failure EP/1/A/500G/07 Steam Line Rupture EP/1/A/5000/19 Feedwater Line Rupture These procedures are being transmitted to initiate the NRC emergency pro-cedure review identified as a NTOL requirement (Action Plan Item I.C.8).
These procedures are also being sent to Westinghouse to initiate the vendor review of procedures also identified as a NTOL requirement (Action Plan Item I.C.7).
V y truly yours, l
O A-= ~ ~ -
- d-
/ William O. Parker, Jr. '
\\
IS$ents THIS DOCUMENT CONTAINS P00RQUAUTYPAGES
<