Text
G 8006190434 y(
o,,
UNITED STATES
+
NUCLEAR REGULATORY COMMISSION n
E REGION V
{..
4 1990 N. CALIFORNIA BOULEVARD o,
e'g 6
SUITE 202, WALNUT CREEK PLAZA q e,,,,
WALNUT CREEK, CALIFORNI A 94596 April 29,1980 Docket Nos. 50-133, 50-275 & 50-323 Pacific Gas and Electric Company 77 Beale Street San Francisco, California 94106 Attention: Mr. Philip A. Crane, Jr.
Assistant General Counsel Gentlemen:
The enclosed Circular No. 80-10, is forwarded to you for information.
If there are any questions related to your understanding of the suggested actions, please contact this office.
Sincerely, j W)msil-R. H. Engelken Director Enclosures :
1.
IE Circular No. 80-10 2.
List of Recently Issued IE Circulars cc w/ enclosures:
W. Barr, PG&E W. Raymond, PG&E R. Ramsay, PG&E, Diablo Canyon E. Weeks, PG&E, Humboldt Bay E. B. Langley, PG&E
)
9 SSIllS No.: 6830 Accession flo. :
UNITED STATES 8002280665 NUCLEAR REGULATORY COMMISSION OFFICE OF INSPECTI0fl AflD ENFORCEMENT k
WASHINGTON, D.C.
20555 April 29, 1980 IE Circular No. 80-10 FAILURE TO MAINTAIN ENVIRONMENTAL QUALIFICATION OF EQUIPMENT Description of Circumstances:
Carolina Power and Light recently reported that the wrong class of insulating material had been used at their H. B. Robinson Nuclear Plant when the motor leads of a containment fan cooler were reconnected. The motor leads had been disconnected during the refueling outage to supply power to welding equipment.
When the motor leads were reconnected, the wrong class of insulating material degraded the environmental qualification of the containment fan cooler motor.
A similar event, reported by Duquesne Light Company, occurred when a containment fan cooler motor was not installed with the proper cable insulation.
The NRC has previously issued IE Circular 78-08 and IE Bulletins 79-01 and 79-01B concerning environmental qualification of Class IE equipment. These Bulletins primarily address the environmental qualification of equipment as purchased and installed; howeve- - above events emphasize the importance of properly installing and mainte
_avironmentally qualified equipment.
Recommended Action for Licensee Consideration:
All holders of operating licenses or construction permits shouM recognize the potential for degradation of environmentally qualified equipment due to improper maintenance or improper use.
It is recommended that licensees review current maintenance procedures and administrative policies to ensure the followirg:
1.
Adequate administrative controls exist to ensure that equipment which is environmentally qualified is identified prior to maintenance.
2.
Maintenance procedures provide necessary instructions and precautions to ensure that the environmental qualification of equipment is not degraded when maintenance is completed.
3.
Maintenance personnel are adequately trained on environmental qualification requirements and the potential for equipment degradation from improper maintenance.
fio written response to this Circular is required.
If you require additional information regarding this matter, contact the Director of the appropriate NRC Regional Office.
IE Circular flo. 80-10 Enclosure April 29, 1980 RECEilTLY ISSUED IE CIRCULARS Circular Subject Date of Issued to flo.
Issue 80-09 Problems With Plant Internal 4/28/80 All holders of a power Communications Systems reactor OL or CP 80-08 BUR Technical Specification 4/18/80 All General Electric Inconsistency - RPS Response BWR's holding a power Time reactor OL 80-07 Problems with HPCI Turbine 4/3/80 All holders of a power Oil System reactor OL or CP 80-06 Control and Accountability 4/14/80 Medical licensees in Systems for Implant Therapy Categories G and G1 Sources 80-05 Emergency Diesel-Generator 4/1/80 All holders of a power Lubricating 011 Addition and reactor OL or CP Onsite Supply l
80-04 Securing of Threaded Locking 3/14/80 All holders of a power Devices on Safety-Related reactor OL or CP Equipment 80-03 Protection from Toxic Gas 3/6/80 All hoiders of a Hazard:
power reactor OL 80-02 fluclear Power Plant Staff 2/1/80 All holders of Reactor Work Hours OLs, including research and test reactors, and cps 80-01 Service Advice for GE 1/17/80 All licensees of Induction Disc Relays nuclear power reactor operating facilities and rolders of nuclear power reactor cps 79-25 Shock Arrestor Strut 12/20/79 All licensees and Assembly Interference holders of power reactor cps