Forwards IE Insp Rept 50-346/80-05 on 800204-08,11,15, 19-22,25-28 & 0303-07.No Noncompliance Noted
ML19323C827
Person / Time
Site: Davis Besse 
Issue date: 04/01/1980
From: Heishman R
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Crouse R
TOLEDO EDISON CO.
Shared Package
ML19323C828 List:
References
NUDOCS 8005190262
Download: ML19323C827 (2)


See also: IR 05000346/1980005

Text

--

--

,-

_

c cecoq(o,

UNITED STATES

8 005100 MLTIQ

i

<,

[

3 ygg( ,g

NUCLEAR REGULATORY COMMISSION

REGION ill

g .g'

  1. ,'c [e

e

799 ROOSEVELT ROAD

4

j

% . . . . e"

GLEN E LLYN,lLLINOIS 60137

APR1

E60

.

.

Docket No. 50-346

Toledo Edison Company

ATTN:

Mr. Richard P. Crouse

Vice President, Nuclear

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the inspection conducted by Mr. L. A. Reyes of this office

on February 4-8, 11, 15, 19-22, 25-28, March 3-7, 1980 of activities at

Davis-Besse Nuclear Power Station, Unit 1, authorized by NRC Operating

License No. NPF-3 and to the discussion of our findings with Mr. T. Murray

on February 22 and through the course of the inspection.

The enclosed copy of our inspection report identifies areas examined during

the inspection. Within these areas, the inspection consisted of a selective

examination of procedures and representative records, observations, and in-

terviews with personnel.

No items of noncompliance with NRC requirements were identified during the

course of this inspection.

In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the en-

closed inspection report will be placed in the NRC's Public Document Room,

except as follows.

If this report contains information that you or your

contractors believe to be proprietary, you must apply in writing to this

office, within twenty days of your receipt of this letter, to withhold

such information from public disclosure. The application must include a

full statement of the reasons for which the information is considered pro-

prietary, and should be prepared so that proprietary information identified

in the application is contained in an enclosure to the application.

.

. . . . . - . . - - . .

. . -

. -. - -

.

.

Toledo Edison Company

2-

gpg i

$$4

-

.

We will gladly discuss any questions you have concerning this

-

inspection,

-

Sincerely,

o

(W

. F. Heishman, Chief

Reactor Operations and

Nuclear Support Branch

Enclosure:

IE Inspection

Report No. 50-346/80-05

cc w/ enc 1:

Mr. T. D. Murray, Station

Superintendent

Central Files

Reproduction Unit NRC 20b

l

PDR

Local PDR

NSIC

TIC

Harold W. Kohn, Power

Siting Commission

Helen W. Evans, State

of Ohio