400 Chestnut Street Tower 11 May 12, 1980 1
Director of Nuclear Reactor Regulation Attention:
Mr. T. A.
Ippolito, Chief Light Water Reactors Branch No. 3 Division of Project Management U.S. Nuclear Regulatory Commission Washington, DC 20555 5D-9
Dear Mr. Ippolito:
33 In the Matter of the
)
Docket Nos. 50-259 Tennessee Valley Authority
)
50-260 50-296 1:.nclosed are five copies of TVA's revised Radiological Emergency Plan (TVA-REP).
This document includes the site REP for the Sequoyah and Browns Ferry Nuclear Plants. This plan was developed to meet NUREG-0654; however, there are various recommendations which are not met in this revised plan.
1.
Some of the items in NUREG-0654, such as prompt notification of the public, are not the primary responsibility of TVA.
In these instances, specific information on the required activities are not included in the TVA-REP because the responsibility lies with State and local agencies and will be included in those emergency plans.
Only those actions required for TVA to fulfill its responsibilities, such as prompt notification of State and local agencies and recommendations for protective action, are included in the TVA-REP.
2.
NUREG-0654 recommends that a near-site emergency operation center and a backup facility be established for each nuclear plant. TVA has established a Central Emergency Control Center which serves all of TVA's nuclear plants. This facility and State and local emergency control centers provide sufficient support. We believe that near-site facilities are an unnecessary duplication.
Howe.ver,
(
a near-site press center has been established for public informa-tion during an emergency.
v 3.
As specified in NUREG-0654, there are some recommendations of g
h,&
NUREG-0578 which should also be implemented as they relate to s
radiological emergencies. The TVA-REP reflects TVA's commitments 4
Mp*.
7 with respect to these items as addressed in our response to g4,pb g
L THIS DOCUMENT CONTAINS k
POOR QUAUTY PAGES d
. Director of Nuclear Reactor Regulation Ma3 12, 1980 The enclosed plan is intended to meet the requirements of 10 CFR 50 Appendix E and therefore does not include detailed information such as I
names and telephone numbers of specific individuals.
This information is included in the implementing procedures which support the TVA-REP.
We have had preliminary discussions related to the NRC review of the TVA-REP with the NRC Emergency Planning Branch.
TVA will provide the support necessary to expedite the review of the TVA-REP to ensure that an acceptable plan can be implemented on a schedule consistent with a full-power license for Sequoyah Nuclear Plant and continued operation of Browns Ferry Nuclear Plant.
Also enclosed is a tabular cross reference between NUREG-0654 and the TVA-REP to aid in your review.
Very truly yours, TENNESSEE VALLEY AUTHORITY
' .- i s
A' WY';
L. M. Mills, Manager Nuclear Regulation and Safety Enclosure (5) 4
- I
TENNESSEE VALLEY AUTHORITY RADIOLOGICAL EMERGENCY PLAN -
CROSS REFERENCE TO NUREG - 0654 NUREG 0654 TVA REP.
Evaluation Criteria Reference (s)
Ala 4.3.4
)
Alb 3.0; App. A, 1.0; App. B, 1.0; App. C, 1.0; App. D, 1.0; App. E.
Alc App. A, page 4 i
Ald App. A, 3.2.4; REP IPD Ale App. A, 3.2.1; App. B, 3.1, App. E, 2.0 A2a App. A, 3.0; App. B, 3.0; App. C, 3.0; App. D, 3.0, App. E, 2.0 A2b State Plan A3 4.3.3; 4.3.4 A4 App. B, 3.1.5; App. D, 3.2.6.1 B1 App. E, 2.0 B2 Arp. E, 2.1.2 B3 App. C, 2.0; App. E, 2.1.3 B4 App. A, 1.0; App. E, 2.0 B5 App. E, 2.0 B6 4.0 B7 App. E, 5.0 B8 4.0; App. A, 3.0; App. B, 3.0; App. C, 3.0; App. D, 3.0 B9 State Plan B10 App. E, 3.6, 3.7 Cla 4.3.4 Clb 4.3.4 Clc 6.2.2 C2 N/A C3 6.2.2.3 C4 4.3 D1 5.0 D2 REP-IPD
. D3 State Plan El 6.0; REP-IPD E2 REP-IPD E3 REP-IPD E4 App. A, 3.2.1; App. D, 3.2.1.2 E5 State Plan E6 State Plan E7 State Plan F1 7.2; App. A, 4.1; App. B, 4.1; App. C, 2.2; App. D, 4.1.1; App E., 3.9 F2 REP-IPD-G1 10.0 G2 10.0 G3a 10.0 G3b 10.0
I i
Evaluation Criteria Reference (s) l G4 10.0 G5 10.0 H1 3.1.1; App. E, 2.1 H2 N/A 1
H3 State Plan H4 6.1 H5 7.3.1 H6 7.3 H7 Under consideration H8 Under consideration H9 App. E, 3.1 H10 8.4 Hll REP-IPD H12 3.1.2.3; App. D, 1.0 Il 5.2 I2 addressed in TVA's response to NUREG-0578
, I3 5.3 I4 5.4; REP-IPD IS 7.3.1.1 I6 5.0 I7 6.2.2.1 I8 6.2.2.1 19 6.2.2.1 Il0 6.2.2.3 J1 6.4.1 J2 6.4.1; App. E, 4.0 J3 6.4.1; App. E, 4.0 J4 6.4.1 J5 6.4.1 J6 6.4.1 J7 5.4.1 J8 State Plan J9 State Plan J10 State Plan J11 State Plan K1 REP-IPD K2 REP-IPD K3 REP-IPD K4 State Plan K5 App. E, 7.0 K6 REP-IPD K7 REP-IPD K8 State Plan L1 6.5 L2 6.5 L3 Stat'e Plan L4 6.5.3 M1 9.0 M2 3.6 M3 0.3.1.1.2 M4 REP-IPD
t NUREG 0654 TVA REP.
Evaluation Criteria Reference (s)
N1 8.2 N2 8.2 N3 8.2.2.2 N4 8.2.2.3 NS 8.2.2.3 01 8.1.1 02 8.0 03 8.6.2 04 8.1.1 P1 8.1.1 P2 8.1.1 P3 Preface P4 8.3 P5 8.3.3 P6 2.1.3 P7 Table of Contents e
P8 Table of Contents P9 8.5 t
Note: TVA-REP - Tennessee Valley Authority Radiological Emergency Plan REP-IPD - Radiological Emergency Plan Implementing Procedures Document App. - Appendix to the TVA-REP 4