Responds to NRC 800229 Ltr Re Violations Noted in IE Insp Repts 50-424/80-02 & 50-425/80-02.Corrective Actions: Reinstructed Personnel Involved W/Weld Rod Distribution & Control,In Procedure Requirements & Responsibility
ML19323C429
Person / Time
Site: Vogtle  Southern Nuclear icon.png
Issue date: 04/02/1980
From: Dutton D
GEORGIA POWER CO.
To: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
Shared Package
ML19323C424 List:
References
GM-597, NUDOCS 8005150524
Download: ML19323C429 (2)


Text

. __ _ _ _ _ _ _ _ _ _ _ _ _ _ __ _ _ _ _ _ - _ _ _ _ _ _ _ _ _

O- ',

B00515 o W

, a Georgia Power Company , , , , , , ,

Post Offce Box 4545 '. ,

,' *." [.' , '

L-Atlanta, Georgia 3o302 Telephone 404 522-606o Vogtle Project Southern Company Services, Inc. . 3 [.O f. ? P tj l lS Post Offce Box 2625 Birmingham, Alabama 35202 Telephone 205 870-6o11 April 2,1980 United States Nuclear Regulatory Commission

REFERENCE:

Office of Inspection and Enforcement IE:II:EHG Region II - Suite 3100 50-424/80-02 101 Marietta Street 50-425/80-02 Atlanta , GA 30303 File: X78G10 Attention: Mr. C. E. Murphy Log: GM-597 Gentlemen:

The Georgia Power Company wishes to submit the following information concerning the noncompliance discussed in your inspection report number 50-424/80-02 and 50-425/80-02.

Pullman Power Products performed a review of documentation and con-firmed that all 3/32" E309-16 electrode, on site, is acceptable for shop use. Pullman Power Products also located another unopened can of 3/32" E309-16 electrode of the same heat number as that reported to be in the shop  :

rod oven. Comparison of the two confirmed the manufacturers marking to be the same. The above action provides adequate assurance that unacceptable material could not have been stored in the oven. l A meeting was held on February 6,1980 with personnel involved in weld rod distribution and control. These people were reinstructed in pro-cedure requiremerts and their responsibility to assure the requirements are met. A review 'af all storage ovens was perfonned to assure compliance with procedures.

Full compliance with storage procedures was accomplished February 14, 1980.

Neither the inspection report nor this reply contain any proprietary information and may be placed in the NRC's Public Document Rooms. l l

Ver ours,

@ y trul l V Ml k

\

W Doug Dutt n Project General Manager CWH:tp

.. .: .. .a . - . a . . -~. -. .: . : =. - = - - ' ~^' ' ^ ^ ' '

.- o d

United States Nuclear Regulatory Commission Mr. C. E. Murphy

.. April 2,1980 f- Page 2

\ '

xc: M. D. Hunt - Region II J. H. Miller, Jr. <

W. E. Ehrensperger F. G. Mitchell, Jr.

3 C. F. Whitmer  ;

R. J.-Kelly R. E. Conway R. W. Staffa C. W. Hayes 1

W. M. Johnston, Jr.

C. R. Miles, Jr.

E. D. Groover

D. L. McCrary R. A. Thomas J. A. Bailey J. L. Leamon J. L. Vota 1 B. L. Lex K. M. Gillespie t

i.

1 i

4 s

6 -

p . .i 6.,'

(

b f

! s ,

4

, , ..,,..-m . - . ,..-- . -, , .. -