C mm:nwealth Edissn
--./ ons First fia'.cnci Pfa:3. CNc3;o. Mi nois
( T J Address Fiepiy o: Post Off'co Gox 767 800515o ( %
i
,y Chicago, litinois 60690 May 12, 1980 Mr. James G. Keppler, Director Directorate of Inspection ano Enforcement - Region III U.S. Nuclear Regulatory Commission 799 Roosevelt Road Glen Ellyn, IL 60137
Subject:
Quad Cities Units 1 and 2 Response to IE Insepction Report Nos. 50-254/80-08 and 50-265/80-01 NRC Docket Nos. 50-254265 Reference (a):
R. F. Heishman letter to C. Reed dated April 21, 1980
Dear Mr. Keppler:
Reference (a) transmitted the report of an inspection conducted by Mr. E. Chow, J. Hopkins, and J. Streeter of your office en January 4, March 6-7, 9-11, 1980, of activities at the Quad Cities Nuclear Power Station, Units 1 and 2.
This report and Appendix A to Reference (a), Notice of Violation, indicateo that one item of noncompliance (deficiency) was identified during the inspection.
Pursuant to 10 CFR Part 2, Section 2.201, Attachment A contains our response to the item of noncompliance, which provides the corrective actions taken and-indicates that full compliance is achieved at this time.
Please address any questions you may have concerning this matter to this office.
Very truly yours, kW $c-.~e *'
th D.
L. Peoples j
/
Director of Nuclear Licensing Attachment 3728A j
o w.
Attachment A NRC Docket No. 50-265 The item of non-compliance identified in Appendix A to the NRC letter dated April 21, 1980, is responded to in the following paragraphs.
Contrary to Technical Speci fication 6.2. A. procedurc QTS 150-57, Revision 6, was not adhered to in that valve position verification was not carried out on March 8,1980, to veri fy that test valves 2-1402-33A and 2-1402-338 were locked closed as required.
Corrective Action Taken and Results Achieved Drawing Change Requests were initiated for the Core Spray Piping Diagrams for both Units 1 and 2, to show the inboard locked 3/4-inch test valves as 1402-33A and 1402-33B. Valve tags and valve checklists were updated to show this configuration, which is in accordance wi th QTS 150-S7 Prior to unit startup valves 2-1402-33A and 2-1402-338 were verified to be locked closed.
Outboard valves 2-1402-32A and 2-1402-32B were veri fied closed. The corresponding valves for Unit I were also verified to be in their proper positions.
Corrective Action to Avoid Further Non-Compliance The valve check lists for both Units 1 and 2 IPCLRT (QTS 150-55 and QTS 150-S 7, respectively) were reviewed to assure correctness.
Procedure revisions have been submitted, and will be implemented prior to the next IPCLRT.
Date When Full Canoliance will be Achieved Full compliance is achieved at this time.