ML19323C321

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-348/80-06 on 800305-08. No Noncompliance Noted
ML19323C321
Person / Time
Site: Farley 
Issue date: 04/04/1980
From: Robert Lewis
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Mcdonald R
ALABAMA POWER CO.
Shared Package
ML19323C322 List:
References
NUDOCS 8005150342
Download: ML19323C321 (2)


See also: IR 05000348/1980006

Text

_

N

-

.

80.051503%

.

-

--

--

---

T /(T

'

  1. pa nog'o

[d'8@

UNITED STATES

!

NUCLEAR REGULATORY COMMISSION

o

3

E

REGION 11

[

101 MARIETTA ST., N.W., SUITE 3100

ATLANTA, GEORGIA 30303

<

a....

In Reply Refer To:

APR 041980

RII:BRM

50-348/80-06

Alabama Power Company

ATTN:

R. P. Mcdonald

Vice President-Nuclear Generation

P. O. Box 2641

Birmingham, AL 35291

Gentlemen:

This refers to the inspection conducted by B. R. Messitt of this office on

March 5-7, 1980 of activities authorized by NRC License No. NPF-2 for the

Joseph M. Farley facility, and to the discussion of our findings held with W. G.

,

Hairston at the conclusion of the inspection.

'

.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report. Within these areas, the inspection consisted of

selective examinations of procedures and representative records, interviews with

personnel, and observations by the inspector.

i

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,

Title 10, Code of Federal Regulations, a copy of this letter and the enclosed

inspection report will be placed in the NRC's Public Document Room.

If this

report contains any information that you (or your contractor) believe to be

proprietary, it is necessary that you make a written application within 20 days

,

'

to this office to withhold such information from public disclosure. Any such

t

application must include a full statement of the reasons on the basis of which

l

it is claimed that the information is proprietary, and should be prepared so

j

that proprietary information identified in the application is contained in a

e

l

separate part of the document.

If we do not hear from you in this regard within

the specified period, the report will be placed in the Public Document Room.

(

Should you have any questions concerning this letter, we will be glad to discuss

them with you.

g

{

L.c.

g

R. C. Lewis, Acting Chief

j

Reactor Operations end Nuclear

i

Support Branch

,

Enclosure:

(See Page 2)

i

.

l0

. ._ ___._ _.__ _. .___-

-

- --

. . . . _ _ _ _ . - _ . . _ . . _ . .

-

t

-

APR 041980

.

,

,

Alabama Power Company

-2-

t

Enclosure:

Inspection Report No. 50-348/80-06

cc w/ encl:

A. R. Barton

Executive Vice President

P.'O.

Box 2641

Birmingham, AL 35291

F. L. Clayton, Jr.

Senior Vice President

Post Office Box 2641

Birmingham, AL 35291

,

.

H. O. Thrash

l

Manager-Nuclear Generation

P. O. Box 2641

.

Birmingham, AL 35291

4

0. D. Kingsley, Jr.

,

Manager, Nuclear Engineering and

{

.

Technical Services

P. O. Box 2641

Birmingham, AL 35291

J. W. McGowan

Manager-Operations Quality Assurance

P. O. Box 2641

Birmingham, AL 35291

,

l

W. G. Hairston, III

P! ant Manager

Drawer 470

Ashford, AL 36312

,

,

,

}

>

1

,

.

a