ML19323C321
| ML19323C321 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 04/04/1980 |
| From: | Robert Lewis NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II) |
| To: | Mcdonald R ALABAMA POWER CO. |
| Shared Package | |
| ML19323C322 | List: |
| References | |
| NUDOCS 8005150342 | |
| Download: ML19323C321 (2) | |
See also: IR 05000348/1980006
Text
_
N
-
.
80.051503%
.
-
--
--
---
T /(T
'
- pa nog'o
[d'8@
UNITED STATES
!
NUCLEAR REGULATORY COMMISSION
o
3
E
REGION 11
[
101 MARIETTA ST., N.W., SUITE 3100
ATLANTA, GEORGIA 30303
<
a....
In Reply Refer To:
APR 041980
RII:BRM
50-348/80-06
Alabama Power Company
ATTN:
R. P. Mcdonald
Vice President-Nuclear Generation
P. O. Box 2641
Birmingham, AL 35291
Gentlemen:
This refers to the inspection conducted by B. R. Messitt of this office on
March 5-7, 1980 of activities authorized by NRC License No. NPF-2 for the
Joseph M. Farley facility, and to the discussion of our findings held with W. G.
,
Hairston at the conclusion of the inspection.
'
.
Areas examined during the inspection and our findings are discussed in the
enclosed inspection report. Within these areas, the inspection consisted of
selective examinations of procedures and representative records, interviews with
personnel, and observations by the inspector.
i
Within the scope of this inspection, no items of noncompliance were disclosed.
One new unresolved item resulted from this inspection and is discussed in the
enclosed report. This item will be examined during subsequent inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and the enclosed
inspection report will be placed in the NRC's Public Document Room.
If this
report contains any information that you (or your contractor) believe to be
proprietary, it is necessary that you make a written application within 20 days
,
'
to this office to withhold such information from public disclosure. Any such
t
application must include a full statement of the reasons on the basis of which
l
it is claimed that the information is proprietary, and should be prepared so
j
that proprietary information identified in the application is contained in a
e
l
separate part of the document.
If we do not hear from you in this regard within
the specified period, the report will be placed in the Public Document Room.
(
Should you have any questions concerning this letter, we will be glad to discuss
them with you.
g
{
L.c.
g
R. C. Lewis, Acting Chief
j
Reactor Operations end Nuclear
i
Support Branch
,
Enclosure:
(See Page 2)
i
.
l0
. ._ ___._ _.__ _. .___-
-
- --
. . . . _ _ _ _ . - _ . . _ . . _ . .
-
t
-
APR 041980
.
,
,
Alabama Power Company
-2-
t
Enclosure:
Inspection Report No. 50-348/80-06
cc w/ encl:
A. R. Barton
Executive Vice President
P.'O.
Box 2641
Birmingham, AL 35291
F. L. Clayton, Jr.
Senior Vice President
Post Office Box 2641
Birmingham, AL 35291
,
.
H. O. Thrash
l
Manager-Nuclear Generation
P. O. Box 2641
.
Birmingham, AL 35291
4
0. D. Kingsley, Jr.
,
Manager, Nuclear Engineering and
{
.
Technical Services
P. O. Box 2641
Birmingham, AL 35291
J. W. McGowan
Manager-Operations Quality Assurance
P. O. Box 2641
Birmingham, AL 35291
,
l
W. G. Hairston, III
P! ant Manager
Drawer 470
Ashford, AL 36312
,
,
,
}
>
1
,
.
a