Ro:On 800326,alarm for Zone 9,reactor bldg,50-ft Elevation Annunciated & Would Not Reset. Caused by Inoperable Relay in Detector Circuitry.Fire Detection Instrumentation Repairs Will Be Completed by 800516
ML19323B946
Person / Time
Site: Brunswick Duke Energy icon.png
Issue date: 05/08/1980
From: Tollison A
CAROLINA POWER & LIGHT CO.
To:
References
BSEP-80-808, NUDOCS 8005140445
Download: ML19323B946 (1)


Text

Tt (/

800514Sp-3 Carolina Power & Light Company

. = . - c.1 Brunswick Steam Electric Plant P. O. Box 10429 '

Southport, N. C. 28461 May 8, 1980 -

FILE: B09-13516 ' SERIAL: BSEP/80-808 Mr. James P. O'Reilly, Director U. S. Nuclear Regulatory Commission Region II 101 5brietta Street, Suite 3100 Atlanta, Georgia 30303 BRUNSWICK STEAM ELECTRIC PLANT, UNIT NO. 2 LICENSE NO. DPR-62 DOCKET'NO. 50-324 .

SPECIAL REPORT PER TECHNICAL SPECIFICATION 6.9.2d

Dear Mr. O'Reilly:

As required by Technical Specifications 3.3.5.7 and 6.9.2d, Carolina Power &

Light Company is submitting the following special report. .

On March 26, 1980, an alarm for Zone 9, Reactor Building, 50 foot elevation, annunciated and would not reset. The apparent cause of the zone failure is an inoperable relay in the detector. circuitry. Repairs to this fire detection instrumentation will be completed by May 16, 1980.

Very truly yours, A. C. To111 son, Jr., General Manager