Forwards IE Insp Repts 50-566/80-05 & 50-567/80-05 on 800304-05.No Noncompliance Noted
ML19323B808
Person / Time
Site: Yellow Creek  Tennessee Valley Authority icon.png
Issue date: 03/21/1980
From: Murphy C
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19323B809 List:
References
NUDOCS 8005140291
Download: ML19323B808 (2)


See also: IR 05000566/1980005

Text

- . -

..

- - - - - . ... - . - ..

.

.

,

-8005240 g j

Wd

,

/

'o,,

UNITED STATES

86'MI

8

NUCLEAR REGULATORY COMMISSION

8#7

o

g

a

REGION 11

0,,

[

101 MARIETTA ST N.W SUITE 3100

a , , , , *#

[k'NM

-

'

In Reply Refer To:

RII:BRC

50-566/80-5

50-567/80-5

Tennessee Valley Authority

ATTN:

H. G. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by B. R. Crowley of this office on

March 4-5, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-172

and CPPR-173 for the Yellow Creet Nuclear Plant facility, and to the discussion

,

of our findings held with R. H. Daniel at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the

enclosed inspection report.

'lithin these areas, the inspection consisted of

selective examinations of prn:edures and representative records, interviews with

personnel, and observations by the inspector.

Within the scope of this inspection, no items of noncompliance were disclosed.

One new unresolved item resulted from this inspection and is discussed in the

enclosed report. This item will be examined during subsequent inspections.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title

10, Code of Federal Regulations, a copy of this letter and the enclosed inspection

report will be placed in the NRC's Public Document Room. If this report contains

any information that you (or your contractor) believe to be proprietary, it is

necessary that you make a written application within 20 days to this office to

withhold such information from public disclosure. Any such application must

include a full statement of the reasons on the basis of which it is claimed that

the information is proprietary, and should be prepared so that proprietary infor-

,

,

mation identified in the application is contained in a separate part of the

i

L

,

,~ document. If we do not hear from you in this regard within the specified period,

the report will be placed in the Public Document Room.

)

i

i

,

l

\\

l

~

.

i

_

'

,

i

t

__

_ _ _

_

-

_

-

.-.._

- . - .

.

.

'

Tennessee Valley Authority

-2-

00%E 2 2 IS6C

,

i-

,

Should you have any questions concerning this letter, we'will be glad to discuss

them with you.

Sincerely,

/

.

.

C. E. Murphy, Chief

Reactor Construction and Engineering

Support Branch

,

Fnclosure:

Inspection Report Nos. 50-566/80-5

and 50-567/80-5

cc w/cncl:

J. F. Cox

400 Commerce Street

W10C131 C-K

Knoxville, TN 37902

M. M. Price, Project Manager

P. O. Box 2000

Iuka, MS 38852

D. L. Terrill, Project Engineer

400 Chestnut Street Tower II

Chattanooga, TN 37401

E. G. Beasley

. Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902

a

- ,.

-

.

I

h

e =

%

.

.

I'

.