Category:INTERVENTION PETITIONS
MONTHYEARML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20039B5721981-12-15015 December 1981 Response Opposing R Alexander 811130 Untimely Petition to Intervene.Strong Grounds Necessary to Reopen Record on Financial Qualifications Not Shown & Requirements for Untimely Intervention Not Met.Certificate of Svc Encl ML20003H8021981-04-23023 April 1981 Intervenor Jf Doherty Contention 56,stating That Reactor Trip Sys Unprotected Against Pipe Break to Scram Discharge Vols from Hydraulic Control Units.Certificate of Svc Encl ML20003A5581981-01-26026 January 1981 Contentions 50 & 55 in Response to NUREG-0470,Suppl 2, Draft Suppl to Fes Re Const of Allens Creek Nuclear Generating Station,Unit 1. Site Je-3 Superior to Applicant Choice W/Less Environ Impact ML20062L2941981-01-15015 January 1981 Contention 51 Re Designation of Site Li-3 as Superior Site, Contention 52 Re Ability of Govt to Decide Issues of Wildlife Habitat & Contentions 53 & 54 Re NUREG-470,Suppl 2. Certificate of Svc Encl ML19336A7361980-10-27027 October 1980 Response in Opposition to Jf Doherty Untimely Contention 50. Intervenor Failed to Establish Connection Between Design & Alleged Safety Concern of Coolant Circulation Degradation. Certificate of Svc Encl ML19331D9241980-08-28028 August 1980 Response in Opposition to W Schuessler,S Doggett & Tx Pirg 800813 Reworded Contention Except Portion Re Capability of Plan W/Location.Remaining Portions Do Not Comply W/Aslb 800724 Order.Certificate of Svc Encl ML19338C3861980-08-15015 August 1980 Consolidation of Contentions Re Emergency Evacuation Plans. Alleges Failure of Environ Rept,Psar,Fes & SER to Comply W/ Regulations Re Evacuation During Class 9 Accidents. Designates Wj Schuessler as Lead Party ML19323D7621980-04-22022 April 1980 Response in Opposition to Jf Doherty Contentions 48 & 49. Intervenor Failed to Justify Untimeliness & to State Good Basis for Conteniton 48.Contention 49 Is Inappropriate for Consideration Due to Class 9 Policy.W/Certificate of Svc ML19323B6961980-04-0707 April 1980 Contentions 48 & 49 Alleging That Facility Should Be Designed W/Control Rod Drive Return as Addl Safeguard & That Containment Should Have Core Ladle as Described in NUREG- 0054 ML19309G1181980-04-0707 April 1980 Brief in Response & Opposition to Fh Potthoff Appeal of ASLB 800310 Order Rejecting Contention 6 Re Biomass Farm Alternative.Intervenor Failed to Include Sufficient Bases for Allegation.Certificate of Svc Encl ML19309H6581980-04-0707 April 1980 Amend to 790525 Contention 17,adding ATWS for Consideration W/Power Excursion Accidents Re Reactivity Effect ML19305E1481980-03-31031 March 1980 Response in Support of R Potthoff Appeal Re Denial of Petition to Intervene.Potthoff Contention Should Be Regarded as Allegation That EIS Did Not Address Biomass Conversion. W/Certificate of Svc ML19309E4101980-03-27027 March 1980 Response in Opposition to Intervenor Jf Doherty 800312 Untimely Contention 47.Good Cause Re Relationship of New Info to Analyses of Turbine Missile Generation Probability & Damage to Equipment,Not Met.W/Certificate of Svc ML19294B0971980-02-10010 February 1980 Response to Applicant & NRC Briefs Re R Alexander 800206 Appeal.Restates Interests as Affected Family & Urges Aslab to Grant Intervention ML20148C9071978-10-11011 October 1978 Petition for Leave to Intervene by Houston Chapter of Natl Lawyers Guild,Inc ML20148B7651978-10-11011 October 1978 Petition to Intervene in CP Proceedings.Accident at Facility Could Cause Tremendous Loss of Life.Even Low Levels of Radiation Can Cause Cancer or Genetic Damage ML20147C6961978-09-29029 September 1978 Response to Amended Petition for Leave to Intervene Filed by W. E.Rentfro.Holds That Amended Petition Fails to Meet the Requirements of I0CFR2.7J4(b) & ASLB Order of 780814 & Should Be Denied 1982-07-12
[Table view] Category:RESPONSES & CONTENTIONS
MONTHYEARML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20039B5721981-12-15015 December 1981 Response Opposing R Alexander 811130 Untimely Petition to Intervene.Strong Grounds Necessary to Reopen Record on Financial Qualifications Not Shown & Requirements for Untimely Intervention Not Met.Certificate of Svc Encl ML20003H8021981-04-23023 April 1981 Intervenor Jf Doherty Contention 56,stating That Reactor Trip Sys Unprotected Against Pipe Break to Scram Discharge Vols from Hydraulic Control Units.Certificate of Svc Encl ML20003A5581981-01-26026 January 1981 Contentions 50 & 55 in Response to NUREG-0470,Suppl 2, Draft Suppl to Fes Re Const of Allens Creek Nuclear Generating Station,Unit 1. Site Je-3 Superior to Applicant Choice W/Less Environ Impact ML20062L2941981-01-15015 January 1981 Contention 51 Re Designation of Site Li-3 as Superior Site, Contention 52 Re Ability of Govt to Decide Issues of Wildlife Habitat & Contentions 53 & 54 Re NUREG-470,Suppl 2. Certificate of Svc Encl ML19336A7361980-10-27027 October 1980 Response in Opposition to Jf Doherty Untimely Contention 50. Intervenor Failed to Establish Connection Between Design & Alleged Safety Concern of Coolant Circulation Degradation. Certificate of Svc Encl ML19331D9241980-08-28028 August 1980 Response in Opposition to W Schuessler,S Doggett & Tx Pirg 800813 Reworded Contention Except Portion Re Capability of Plan W/Location.Remaining Portions Do Not Comply W/Aslb 800724 Order.Certificate of Svc Encl ML19338C3861980-08-15015 August 1980 Consolidation of Contentions Re Emergency Evacuation Plans. Alleges Failure of Environ Rept,Psar,Fes & SER to Comply W/ Regulations Re Evacuation During Class 9 Accidents. Designates Wj Schuessler as Lead Party ML19323D7621980-04-22022 April 1980 Response in Opposition to Jf Doherty Contentions 48 & 49. Intervenor Failed to Justify Untimeliness & to State Good Basis for Conteniton 48.Contention 49 Is Inappropriate for Consideration Due to Class 9 Policy.W/Certificate of Svc ML19323B6961980-04-0707 April 1980 Contentions 48 & 49 Alleging That Facility Should Be Designed W/Control Rod Drive Return as Addl Safeguard & That Containment Should Have Core Ladle as Described in NUREG- 0054 ML19309G1181980-04-0707 April 1980 Brief in Response & Opposition to Fh Potthoff Appeal of ASLB 800310 Order Rejecting Contention 6 Re Biomass Farm Alternative.Intervenor Failed to Include Sufficient Bases for Allegation.Certificate of Svc Encl ML19309H6581980-04-0707 April 1980 Amend to 790525 Contention 17,adding ATWS for Consideration W/Power Excursion Accidents Re Reactivity Effect ML19305E1481980-03-31031 March 1980 Response in Support of R Potthoff Appeal Re Denial of Petition to Intervene.Potthoff Contention Should Be Regarded as Allegation That EIS Did Not Address Biomass Conversion. W/Certificate of Svc ML19309E4101980-03-27027 March 1980 Response in Opposition to Intervenor Jf Doherty 800312 Untimely Contention 47.Good Cause Re Relationship of New Info to Analyses of Turbine Missile Generation Probability & Damage to Equipment,Not Met.W/Certificate of Svc ML19294B0971980-02-10010 February 1980 Response to Applicant & NRC Briefs Re R Alexander 800206 Appeal.Restates Interests as Affected Family & Urges Aslab to Grant Intervention ML20148C9071978-10-11011 October 1978 Petition for Leave to Intervene by Houston Chapter of Natl Lawyers Guild,Inc ML20148B7651978-10-11011 October 1978 Petition to Intervene in CP Proceedings.Accident at Facility Could Cause Tremendous Loss of Life.Even Low Levels of Radiation Can Cause Cancer or Genetic Damage ML20147C6961978-09-29029 September 1978 Response to Amended Petition for Leave to Intervene Filed by W. E.Rentfro.Holds That Amended Petition Fails to Meet the Requirements of I0CFR2.7J4(b) & ASLB Order of 780814 & Should Be Denied 1982-07-12
[Table view] Category:LEGAL TRANSCRIPTS & ORDERS & PLEADINGS
MONTHYEARML20063N7471982-10-0606 October 1982 Motion for Termination of Proceedings.Util Decided to Cancel Plant.Certificate of Svc Encl ML20063N7591982-10-0606 October 1982 Withdrawal of Application for CP ML20055A7221982-07-15015 July 1982 Memorandum & Order Denying Jf Doherty 820615 Submittals, Treated as Motion to Reconsider ASLB 820602 Order.Motion Untimely Filed & Failed to Show Significance or Gravity of Issues ML20055A3551982-07-12012 July 1982 Amended Contention 59.Certificate of Svc Encl ML20054L4521982-07-0202 July 1982 Response Opposing J Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Fails to Establish Timeliness &/Or Significance of Issues Sought to Be Raised.Certificate of Svc Encl ML20054L5531982-07-0202 July 1982 Response Opposing Doherty 820615 Motion to Reopen Record to Add Contention 59.Motion Should Be Considered Motion for Reconsideration of ASLB 820602 Order.Timeliness & Significance of Issues Not Established.W/Certificate of Svc ML20054J9371982-06-28028 June 1982 Response Opposing J Doherty 820615 Request to Reopen Record. Request Improper & Insufficient to Support Relief.Commission Rules Cannot Be Circumvented by Refiling Same Argument After ASLB Ruling Issued.Certificate of Svc Encl ML20054F9861982-06-15015 June 1982 Motion to Reopen Record to Take Evidence on Contention 59. Gravity of Issues Warrants Reopening ML20054G0171982-06-15015 June 1982 Contention 50 Re Brown & Root Deficiencies in Quadrex Rept. Certificate of Svc Encl ML20053D0861982-05-24024 May 1982 Response in Opposition to Util 820519 Motion to Strike Doherty Contention 58 Re Applicant Conduct on Reporting Violations.Contention Should Be Treated as Such,Not as Motion.Certificate of Svc Encl.Related Correspondence ML20052H8621982-05-19019 May 1982 Motion to Strike J Doherty Reply to Applicant 820507 Response to Doherty 820422 Motion to Add Contention 58. Commission Rules Do Not Allow Reply.Certificate of Svc Encl ML20052H4441982-05-14014 May 1982 Reply Opposing Applicant 820507 Response to J Doherty 820422 Motion to Add Contention 58.Contention Should Be Admitted W/Amends.Aslb Should Judge Conduct of Applicants. Certificate of Svc Encl ML20052F3121982-05-0707 May 1982 Response Opposing J Doherty 820422 Motion to Add Contention Re Alleged Failure to Rept Design Defects.Substantively, Motion Is Motion to Reopen Record & Stds Have Not Been Met. Certificate of Svc Encl ML20052D1221982-04-29029 April 1982 Findings of Fact on Supplemental Issues to Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20052A4541982-04-22022 April 1982 Submittal of Contention 58 Re Applicant Conduct on Reporting Violations at Plant.Certificate of Svc Encl ML20054E0561982-04-21021 April 1982 Supplemental Findings of Fact on Tx Pirg Addl Contention 31 Re Technical Qualifications.Certificate of Svc Encl ML20050J1111982-04-0606 April 1982 Answers to Second & Third Sets of Interrogatories,Questions 29 & 8 Respectively,Re Quadrex Rept.Certificate of Svc Encl. Related Correspondence ML20050E2961982-04-0505 April 1982 Answers & Objections to Seventh Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050E2891982-04-0505 April 1982 Answers & Objections to Doherty Sixth Set of Interrogatories.Related Correspondence ML20050C4211982-04-0202 April 1982 Objections to Request for Admissions.Requests Untimely, Irrelevant to Issues Before ASLB & Extremely & Unduly Burdensome.Certificate of Svc Encl.Related Correspondence ML20050C4081982-03-31031 March 1982 Answers & Objections to Fifth Set of Interrogatories. Certificate of Svc Encl.Related Correspondence ML20050C4791982-03-29029 March 1982 Answers & Objections to Jf Doherty Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters. Certificate of Svc Encl.Related Correspondence ML20042C6181982-03-29029 March 1982 Response Opposing J Doherty 820315 Motion for ASLB to Subpoena Quadrex Corp Employee Witnesses as ASLB Witnesses. Request Is Based on Misperception of Scope of Reopened Hearings.Certificate of Svc Encl ML20042C6431982-03-29029 March 1982 Motion for ASLB to Call DE Sells as Witness for Tx Pirg Addl Contention 31 & Quadrex-related Matters.Testimony Needed to Explain Why NRC Did Not Immediately Obtain Quadrex Rept. Certificate of Svc Encl ML20050C5091982-03-26026 March 1982 Response to Jf Doherty 20th & 21st Requests for Documents. Certificate of Svc Encl ML20050C5041982-03-26026 March 1982 Testimony of Lj Sas on Tx Pirg Addl Contention 31 Re Quadrex Rept.Rept Raises No Issue as to Whether Ebasco Can Properly Engineer Project.Prof Qualifications Encl ML20050C5011982-03-26026 March 1982 Supplemental Testimony of Jh Goldberg on Technical Qualifications.Brown & Root Terminates Due to Lack of Engineering Productivity,Not Due to Allegations in Quadrex Rept ML20042C5201982-03-25025 March 1982 Motion to Compel Discovery from Applicant & to Postpone Evidentiary Presentations at 820412 Hearings.Applicant Objections to Interrogatories Unsupported & Necessitate Hearings Be Delayed.Certificate of Svc Encl ML20049K0671982-03-25025 March 1982 Reply to Tx Pirg 820315 Addl Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20049K0801982-03-25025 March 1982 Answers & Objections to Interrogatories.Certificate of Svc Encl ML20042C5481982-03-23023 March 1982 Fourth Set of Requests for Admissions Re Quadrex Rept & Tx Pirg Contention 31.Certificate of Svc Encl ML20049K0841982-03-23023 March 1982 Answers & Objections to Third Set of Interrogatories. Certificate of Svc Encl ML20049K0941982-03-23023 March 1982 Answers & Objections to Second Set of Interrogatories. Certificate of Svc Encl ML20042A4791982-03-17017 March 1982 Response Opposing J Doherty 820310 Motion for Postponement of 820412 Hearings.Sufficient Grounds Not Provided to Justify Delay.Certificate of Svc Encl ML20042B2351982-03-17017 March 1982 Seventh Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl ML20042B2381982-03-15015 March 1982 Sixth Set of Interrogatories Re Tx Pirg Addl Contention 31 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20042B2451982-03-15015 March 1982 Motion for Subpoena of Quadrex Corp Employees.Testimony Necessary for Clear Understanding of Brown & Root Deficiencies Despite Util Supervision & Specific Steps Needed to Correct & Prevent Problems.W/Certificate of Svc ML20041F0761982-03-10010 March 1982 Fourth Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept.Certificate of Svc Encl.Related Correspondence ML20041F0871982-03-10010 March 1982 Motion for Postponement of 820412 Hearing on Tx Pirg Addl Contention 31 & Quadrex-related Matters.Addl Time Needed to Complete Discovery.Certificate of Svc Encl ML20049J6571982-03-0808 March 1982 Answers to First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl ML20041E1001982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents.Certificate of Svc Encl ML20041E1071982-03-0505 March 1982 First Set of Interrogatories & Request for Production of Documents Re Tx Pirg Contention 31.Certificate of Svc Encl ML20041E1181982-03-0505 March 1982 Third Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Rept Matters.Related Correspondence ML20041E1201982-03-0505 March 1982 Motion for Order Directing Applicant to Provide Forthcoming Bechtel Quadrex Rept Review.Rept Pertinent to Remaining Issue.Certificate of Svc Encl.Related Correspondence ML20041E1741982-03-0505 March 1982 Brief Opposing R Alexander Appeal from ASLB 820112 Order Denying Petition to Intervene.Aslb Did Not Abuse Discretion in Denying Petition.Certificate of Svc Encl ML20041E0711982-03-0404 March 1982 Second Set of Interrogatories Re Tx Pirg Contention 21 & Quadrex Rept Matters.Certificate of Svc Encl.Related Correspondence ML20049H8881982-03-0101 March 1982 Response Opposing D Marrack 820213 Motion for Review of Dates for Reopening Hearings & Continuance.No Commission Regulations or Atomic Energy Act Provisions Require Applicant Irrevocable Commitment.Certificate of Svc Encl ML20041B5381982-02-22022 February 1982 Reply to Intervenors Proposed Findings of Fact & Conclusions of Law.Certificate of Svc Encl ML20041C0671982-02-22022 February 1982 Response Opposing Tx Pirg 820209 Motion for Addl Time to File Proposed Findings of Fact & Conclusion of Law.Motion Mooted by Tx Pirg Filing Proposed Findings on 820212. Certificate of Svc Encl ML20041B5421982-02-17017 February 1982 First Set of Interrogatories Re Tx Pirg Contention 31 & Quadrex Matters.Certificate of Svc Encl.Related Correspondence 1982-07-02
[Table view] |
Text
. _
L J 8005140 f
U"I22D 3?;.223 07 ,Cli2ICA nril 7, 1930 UUO!Ed2 22TJL120R I. :.IOCICI
.......n, ~.r,....~.y,
. ,. 7, -
m,..,,
-.. as ~- ~ T..,,
. . > v- .,.z .)
In the !!atter of:
. -.,u. ,s ,. . .. ... .ui, .s.. ,t . .. .. m .. , , - . , , .
o .. . .mni . ,
(allens Creet nuclear Senerating "o c::et ._.o. 5g-4go, C7 3tation, Unit JO C 7. D07.32??'3 00::2E: TIT:0 *3 and M.
Zursu:nt to '3 072 2 714, J:hn J. 00hert7, Intervenor in the 33cve 0:nstru::Lon license ?roce311nrs files the contentions below. :ach is first presented, followed by a supporting statenent
'roviding additional basis, and c:ncluded b a statement as to uhy the contention should be admitted to the crocestings de-c'ite the deadline for Contentions being passed.
?2.:? C7 T"?'":TIO7 M8 Intervenor Contands the A0rG3 should be designed with a control roi drive return line (CRD), becauce this source of hiTh 1 essure water functions as an adiitional safe uari against events where there is water loss fr:7 the r ector vessel et oressure remains high.
-m ,.-- -,a ,. . -m GU ,c
.s .t .1.. UG . w aw.e .,
fhis Oontention is sun?3ated 57 the fact on three occai-si:ns of naior Boilia .later .'eactor events, the 02D return line and 7uno have functioned as significant systens to keep a safe reactor core inventory, despite this systen's not being a " safety" or ' safety related" systen. These events were:
- a. The fire at the 3rv<n's 7 err? Unit 1, on " arch 22, 1975.
- b. The ir7well overpressurization event at 3resden II, on .ne 5, 1 1970
- c. 'he loss of core inventor 7 at Syster Creek, on "a7 2,197?.
Fur:her evidence the 023 return line s sten is of safety <
value is thst there will be periods'as long as a ves; where tTe A0:.'03 will be 7ersittei to run uith punos to the high cres- 1 sure core sora7 systen (2705) out of service. In the event of occurences like t.:se listei a ovo, there would be no source of hi.h oressure for maintainin.; the roact,r core inventory or cooling with PPCS out of service. :*ence the ORD return line offers a bac'c-up systen in the event of out of service for the 2F03 pumps.
This Intervenor would also 7oint out that "C2D novement
~
9a- be somewhat slow" on the 0"G3 "siace the exhaust neaier ore curs i: higher' ac: riin ton letrer enclocare fran 3. G.
1 l
Jherwood of Seneral 21ectric to 7. 2telh of ' 20 Divisien of
)
C7oratinz 3eactors of ::a7 22,1979.
9o although tho:e to evilantly sufficient reasen4re7ove the t'.e 02J return ' ecause of unerpected no:-le crac :inc in the reactor, this Interve or centonis that the sicnificance to safet7 so far shown 57 havinT this noa-safetr systen available outweighs the advanta0e of renoving it due to norrie erse':c.
In silition, it should b? poi . tai out that a ca t.ution to t':e THIS DOCUMENT CONTAINS
, POOR QUAUTY PAGES H
e
, .. ~ , , , -, . .,
.J 0 O ! e ,, . 0 . ~A.. 7 s- . ,i f .
. ,J : , . s ,. v - . , . ,.,.m. -....~.,
Thic ;ontatti... is basci on tha unique cronerrisc of the 3 >i1 for t';e pr:20091 cite as offerin little of :he protecti'-
a cite uith : ore roc:c and roe :11::2 strits vould -iva n e 9u M ic and the environment. 2ho : ors la lle ' con e,t amich wcs cu7?orte' for any reactor site in the aaricaa Ph sical Societ~ .:ecort (Re-views of Modarn Physics, 47 Jup.a. Jusmer,1975; .3, 0-111) on
- uclear 31fety, a.,221rs fra: .:G2:G- a?4, to al.':r ;;;;;cl 117: uf additional time in which m,lten uranium could 'ce ;re ented fron cen-tceting :he noist lays and siltc of the aCNGC where subcequent
- tean en,losion such as dec:ri:ci in mun-1000, "2eacter Zafat7 3tud7 " (page 7:: -77,73) wouli be lihol7 to oc:ur. 2ha =inicus delay of tha " core laile" would sake evacuation more easy.
..-m wn A, v. ~. - , , ..a, --a -t - i .yA ,. . . . . .u- ~. .r -- U . . ., _a , %. c, a.. , :.i$g 1/ 2his Intervonor ass rts there has been cood cauca for late filing becauce no satisfactory core 12:1e has been precanted for a nuclear plant until this for the J1oating nuclear 21 ant, presented in a reb-ruary ")30 :iRO publication shere the -levice has had entensive exami-nation. The docu=ent ::U2iG-0354, Oupp. 3 was unnvailable to this Intervonor until :: rch 19, 1930.
2/ 2hore is no current c: ,ission effort to have ap,licant's e7 sten or any 3.l2 system equippei with a cora 1:lle device for clants situated on clay, silt, can; and gravel.
3/ Consideration of thic, in view of the evacuation and porulation c:ntentions raiced by Intervenor J. Morgan 21 shop and other carties vault cive the opp;rtunit:' te c:ncider melt-delay 37: tons in rela-tion to denographic conditions.
4/ 50 other part7 has ascorted the right :: bring up this levice for core melt mitigation or delay.
5/ .ihere the consequences of =eltdoun are severe, the use of tine to consider its nitiration is worthy. This Intervonor has raisai several other is:ues in this proceeding, and hence his participation as a question is moot.
Therefore, this Intervenor see'.<s ainission of the above Contentions nunbere 48 and 49.
2espectfully submitted John 7. Joher'7 03 pies of "JO 2: 7.
the carties below on SC::22Tf'O this F 022TZ:.2I5. 3 :48 and in9" were serve" on Postal Service. of April, 1930, via Zirst Olass U.1 I 3haldon J. :lolfe, Esq. ("20)
Curtave t. Linenbsr:er, (:'20 Dr. 3. Leonard 0heatus, (::22 2teven :I. Cahin'<i, Esq. (U20 Richsr' 1. Loverre, Zsc. (Otate of Texas)
- 3. Oordoa Oooch, Isq. (Aoplicant)
J. Gre Or7 Oopelan', Ici. (ASplicant)
The In:ervening Farties.