ML19323B682
| ML19323B682 | |
| Person / Time | |
|---|---|
| Site: | Davis Besse |
| Issue date: | 03/31/1980 |
| From: | James Keppler NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III) |
| To: | Johnson W TOLEDO EDISON CO. |
| Shared Package | |
| ML19323B683 | List: |
| References | |
| NUDOCS 8005140069 | |
| Download: ML19323B682 (2) | |
See also: IR 05000346/1980007
Text
a o 0514 00M
Tl0
'
d
o
UNITED STATES
[")y,g/h
NUCLEAR REGULATORY COMMISSION
i/'c e
REGION lli
% . . . . /[
~
799 ROOSEVELT ROAD
0,
GLEN ELLYN, ILLINOIS 60137
sat 31 NO
Docket No.
50-346
Toledo Edison Company
ATTN:
Mr. W. Johnson
President and Chief
Operating Officer
Edison Plaza
300 Madison Avenue
Toledo, OH 43652
Gentlemen:
This refers to the meeting conducted by me, and others of this office on
February 29, 1980, at NRC Region III offices with you and others of your
staff.
The enclosed copy of our inspection report identifies the areas discussed
during the meeting. As indicated in the report, the primary thrust of
the meeting was the immediate resolution of concerns regarding the cur-
rent experience levels of the operating shifts at the Davis-Besse Nuclear
Station. Your cooperation was very instrumental in effecting an imme-
diate short term resolution to the concerns. However, for the long term
we believe it will require the explicit attention of you and your staff
to prevent any future degradation of the plant staff to the peint we
found it during the weeks of February 18 through 28, 1980. Our inspec-
tion effort will continue in the area of plant staffing and we request
that you be prepared to address your plans to meet the December 1979
draft of ANS Standard 3.1 in our next management meeting.
No items of noncompliance with NRC requirements were identified during
the course of this meeting.
Ia accordance with Sectior 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Fede :1 Regulations, a copy of this letter and the
enclosed inspection report vill be placed in the NRC's Public Document
Room, except as follows. If this report contains information that you or
your contractors believe to be proprietary, you must apply in writing to
this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application
.
m
eme w e O y 9
=w
_
ey
a---#,w
e=a
a
v.
e
=
.
.~
Toledo Edison Company
-2-
M 31 Sig
must include a full statement of the reasons for which the information is
considered proprietary, and should be prepared so that proprietary infor-
mation identified in the application is contained in an enclosure to the
application.
Thank you for your cooperation with us.
If you have any questions re-
garding the enclosed report please feel free to call me.
Sincerely,
h
ames G.
epp r
Director
Enclosure:
IE Inspection
Rpt. No. 50-346/80-07
cc w/ enc 1:
Mr. T. Murray, Station
Superintendent Central Files
Reproduction Unit NRC 20b
Local PDR
Howard W. Kohn, Ohio Power
Siting Commission
Helen W. Evans, State
of Ohio
i
.
. , . . . . . . . . . . . _ _ . . . .
- _ , -
_ . - . , . -
--
. . .
.
.-
_
,
.
.
_