ML19323B682

From kanterella
Jump to navigation Jump to search
Forwards IE Insp Rept 50-346/80-07 on 800229.No Noncompliance Noted
ML19323B682
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 03/31/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Johnson W
TOLEDO EDISON CO.
Shared Package
ML19323B683 List:
References
NUDOCS 8005140069
Download: ML19323B682 (2)


See also: IR 05000346/1980007

Text

a o 0514 00M

Tl0

'

d

o

UNITED STATES

[")y,g/h

NUCLEAR REGULATORY COMMISSION

i/'c e

REGION lli

% . . . . /[

~

799 ROOSEVELT ROAD

0,

GLEN ELLYN, ILLINOIS 60137

sat 31 NO

Docket No.

50-346

Toledo Edison Company

ATTN:

Mr. W. Johnson

President and Chief

Operating Officer

Edison Plaza

300 Madison Avenue

Toledo, OH 43652

Gentlemen:

This refers to the meeting conducted by me, and others of this office on

February 29, 1980, at NRC Region III offices with you and others of your

staff.

The enclosed copy of our inspection report identifies the areas discussed

during the meeting. As indicated in the report, the primary thrust of

the meeting was the immediate resolution of concerns regarding the cur-

rent experience levels of the operating shifts at the Davis-Besse Nuclear

Station. Your cooperation was very instrumental in effecting an imme-

diate short term resolution to the concerns. However, for the long term

we believe it will require the explicit attention of you and your staff

to prevent any future degradation of the plant staff to the peint we

found it during the weeks of February 18 through 28, 1980. Our inspec-

tion effort will continue in the area of plant staffing and we request

that you be prepared to address your plans to meet the December 1979

draft of ANS Standard 3.1 in our next management meeting.

No items of noncompliance with NRC requirements were identified during

the course of this meeting.

Ia accordance with Sectior 2.790 of the NRC's " Rules of Practice," Part

2, Title 10, Code of Fede :1 Regulations, a copy of this letter and the

enclosed inspection report vill be placed in the NRC's Public Document

Room, except as follows. If this report contains information that you or

your contractors believe to be proprietary, you must apply in writing to

this office, within twenty days of your receipt of this letter, to

withhold such information from public disclosure. The application

.

m

eme w e O y 9

=w

_

ey

a---#,w

e=a

a

v.

e

=

.

.~

Toledo Edison Company

-2-

M 31 Sig

must include a full statement of the reasons for which the information is

considered proprietary, and should be prepared so that proprietary infor-

mation identified in the application is contained in an enclosure to the

application.

Thank you for your cooperation with us.

If you have any questions re-

garding the enclosed report please feel free to call me.

Sincerely,

h

ames G.

epp r

Director

Enclosure:

IE Inspection

Rpt. No. 50-346/80-07

cc w/ enc 1:

Mr. T. Murray, Station

Superintendent Central Files

Reproduction Unit NRC 20b

PDR

Local PDR

NSIC

TIC

Howard W. Kohn, Ohio Power

Siting Commission

Helen W. Evans, State

of Ohio

i

.

. , . . . . . . . . . . . _ _ . . . .

- _ , -

_ . - . , . -

--

. . .

.

.-

_

,

.

.

_