ML19323B482
| ML19323B482 | |
| Person / Time | |
|---|---|
| Site: | North Anna |
| Issue date: | 05/09/1980 |
| From: | Sylvia B VIRGINIA POWER (VIRGINIA ELECTRIC & POWER CO.) |
| To: | Harold Denton, Varga S Office of Nuclear Reactor Regulation |
| References | |
| 419, NUDOCS 8005120426 | |
| Download: ML19323B482 (1) | |
Text
8 0 0512 0 VX Vinoixra ELucTute Ax u l'ow n u Co>t tuxv H a c u s o x o. v i u o rw ar u n u (>i May 9, 1980 Mr. Harold R. Denton, Director Serial No.
419 Of fice of Nuclear Reactor Regulation N0/RMT:baw Attn:
Mr. S teve n A. Va rga, Ch ie f Docket Nos:
50-338 Operating Reactors Branch No. 1 50-339 Division of Licensing License Nos: NPF-4 U. S. Nuclear Regulatory Commission NPF-7 Washington, D. C.
20555
Dear Mr. Denton:
The North Anna Power Station procedure to sample the service water pump house drain system for turbidity and suspended solids has been changed.
This letter serves as notification pursuant to Atomic Safety and Licensing Appeal Board Decision, ALAB-578.
The change to the periodic test is to collect a sample from each of six drains under the service water pump house and test them collec tively.
The procedure had originally taken only two samples and analyzed them sr.parately.
t S ince rely,
,i>l. 4 L 7
B.
R.
Sylvia Manager-Nuclear Operations and Maintenance cc:
Mr. B. Joe Youngblood, Chief Licensing Branch 1 Division of Licensing Mr. James P. O'Reilly, Director Of fice of Inspection and Enforcement