Discusses 800310-21 Special Insp of Health Physics Program. Details & Findings of Insp Will Be Forthcoming.List of Major Concerns Discussed Encl
ML19323B318
Person / Time
Site: Zion  File:ZionSolutions icon.png
Issue date: 04/15/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Oconnor J
COMMONWEALTH EDISON CO.
References
NUDOCS 8005120232
Download: ML19323B318 (2)


Text

.. _. _. _. _. _

8 0 0512 o,gg

~

f 4

o rar UNITED STATES 8

NUCLEAR REGULATORY COMMISSION o

E REGION ill d'[*

C 799 ROOSEVELT ROAD GLEN ELLYN,ILLINO:s 60137 Docket No. 50-295 APR 15120 Docket No. 50-304 Commonwealth Edison Company ATTN:

J. J. O'Connor President P. O. Box 767 Chicago, IL 60690 Gentlemen:

On March 10 through 21, 1980, the NRC conducted a special appraisal of the health physics program at the Zion Nuclear Generating Station as part of an ongoing extensive effort in this area at all operating nuclear power plants in the country. The detailed report and findings of that inspec-tion will be forthcoming. However, because of concerns identified during this special inspection, you and I and members of our respective staffs met in our Region III office on April 11, 1980.

During this meeting, our major concerns, listed in the enclosure to this letter, were discussed in detail. This confirms that Commonwealth Edison Company has initiated action on certain of these concerns and will proceed expeditiously to resolve all concerns. We agreed to meet in approximately two weeks to discuss CECO's method of resolution, including completion dates, for each area.

We appreciate your cooperation in resolving these matters.

Sincerely,

& fe nam U

James G. Kepp er Director

Enclosure:

As stated cc w/ encl:

Mr. D. L. Peoples, Director of Nuclear Licensing Mr. N. Wandke, Plant Superintendent Central Files Reproduction Unit NRC 20b PDR Local PDR NSIC TIC Mr. Dean Hansell, Office of Assistant Attorney General

7 HEALTH PHYSICS. APPRAISAL CONCERNS 1.

Improvement in the quality of the radiation protection progtam through stronger management and management support.

2.

Vandalism which may adversely affect contamination control, emergency communications, and laboratory analytical results.

3.

Identification of the source and extent of alpha contamination seen in the refueling cavity.

4.

Personnel accountability and access control to auxiliary building and -

high radiation areas.

5.

Improvement of contamination control.

6.

Identification and correction of sources of inplant radioactive gas leaks.

7.

Assurance of adequacy of training and instrument calibration as related to emergency response capabilities.

8.

Accelerated completion of the radwaste facility addition and safety review of the temporary demineralizer installation under accident conditions.

i I

l I

1 I

l

- _