Forwards IE Insp Repts 50-327/80-08 & 50-328/80-05 on 800219-22.No Noncompliance Noted
ML19323B301
Person / Time
Site: Sequoyah  Tennessee Valley Authority icon.png
Issue date: 03/21/1980
From: Stohr J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Parris H
TENNESSEE VALLEY AUTHORITY
Shared Package
ML19323B302 List:
References
NUDOCS 8005120215
Download: ML19323B301 (2)


See also: IR 05000327/1980008

Text

j

Nd

[p %q'o

,

gg,

,

UNITED STATES

3g

g

,,

g

NUCLEAR REGULATORY COMMISSION

,

1-'

.c

REGION 11

,

o

.' #

'8

101 MARIETTA sT

N.W.. sUlTE 3100

b

8 0 0512 0 2h6

g U" /

ATLANTA, G EORGI A 30$"

MAR 211980

Q

In Reply Refer To:

RII:LLJ

50-327/80-08

50-328/80-05

Tennessee Valley Authority

ATTN:

H. C. Parris

Manager of Power

500A Chestnut Street Tower II

Chattanooga, TN 37401

Gentlemen:

This refers to the inspection conducted by L. L. Jackson of this office on February 19-

22, 1980 of activities authorized by NRC Construction Permit Nos. CPPR-72 and CPPR-73

for the Sequoyah facility, and to the discussion of our findings held with the plant

superintendent at the conclusion of the inspection.

Areas examined during the inspection and our findings are discussed in the enclosed

inspection report. Within these areas, the inspection consisted of selective exami-

nations of procedures and representative records, interviews with personnel, and

observations by the inspectors.

Within the scope of this inspection, no items of noncompliance were disclosed.

In accordance with Section 2.790 of the NRC's " Rules of Practice", Part 2, Title 10,

Code.of Federal Regulations, a copy of this letter and the enclosed inspection report

will be placed in the NRC's Public Document Room.

If this report contains any infor-

mation that you (or your contractor) believe to be proprietary, it is necessary that

you make a written application within 20 days to this office to withhold such infor-

mation from public disclosure. Any such application must include a full statement

of the reasons on the basis of which it is claimed that the information is proprie-

tary, and should be prepared so that proprietary information identified in the appli-

cation is contained in a separate part of the document.

If we do not hear from you

in this regard within the specified period, the report will be placed in the Public

Document Room.

Should you have any questions concerning this letter, we will be glad to discuss

'

them with you.

Sine rely

/

Philip Stohr,

ef

'uel Facility and Maiecials

Safety Branch

Enclosures:

Inspection Report Nos. 50-327/80-08 and 50-328/80-05

cc w/cuc1:

(See Page 2)

e

MAR 211980

,

Tennessee Valley Authority

-2-

.

cc w/ encl:

G. G. Stack, Project Manager

P. O. Box 2000

Daisy, TN 37319

J. M. Ballentine

Plant Superintendent

P. O. Box 2000

Daisy, TN 37319

J. F. Cox

400 Commerce Street

W10Cl31 C-K

Knoxville, TN 37902

D. L. Lambert, Project Engineer

400 Chestnut Street Tower 11

Chattanooga, TN 37401

T. B. Northern

Construction Engineer

Post Office Box 2000

Spring City, TN 37381

E. G.

Beasley

Tennessee Valley Authority

309 Grant's Building

Knoxville, TN 37902

.