UNITED STATES
TEC
8
- 'n
NUCLEAR REGULATORY COMMISSION
$
E
REGION ill
- #
799 ROOSEVELT ROAD
o,
GLEN ELLYN, ILLINOIS 60137
% . . . . .
g**
MAR 2 0 E60
Focket No. 50-10; 50-237; 50-249;
50-254; 50-265
Commonwealth Edison Company
ATTN:
Mr. Cordell Reed
Vice President
Post Office Box 767
Chicago, IL 60690
Gentlemen:
This refers to the inspection conducted by Mr. I. T. Yin of this office
on February 27-28, 1980, at EDS Nuclear Inc., San Francisco, California,
of activities at Dresden Nuclear Power Station authorized by NRC Operat-
ing Licenses No. DPR-2, No. DPR-19 and No. DPR-25, and of activities at
the Quad-Cities Nuclear Power Station, Units 1 and 2, authorized by NRC
Operating Licenses No. DPR-29 and No. DPR-30 and to the discussion of
'
our findings with Mr. M. Strait of your staff at the conclusion of the
l
inspection.
The enclosed copy of our inspection report identifies areas examined
during the inspection. Within these areas, the inspection consisted of
a selective examination of procedures and representative records, obser-
vations, and interviews with personnel.
No items of noncompliance with NRC requirements were identified during
the course of this inspection.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part
2, Title 10, Code of Federal Regulations, a copy of this letter and the
enclosed inspection report will be placed in the NRC's Public Document
Room, except as follows.
If this report contains information that you
or your contractors believe to be proprietary, you must apply in writing
to this office, within twenty days of your receipt of this letter, to
withhold such information from public disclosure. The application must
include a full statement of the reasons for which the information is con-
sidered proprietary, and should be prepared so that proprietary informa-
tion identified in the application is contained in an enclosure to the
application.
i
sr-
4
Commonwealth Edison Company
-2-
MAR 2 0 280
We will gladly discuss any questions you have concerning this
inspection.
Sincerely,
.
'
gW/
g
,
G. Fiorelli, Chief
Reactor Construction and
Engineering Support Branch
cc w/ enc 1:
Mr. D. L. Peoples, Director
of Nuclear Licensing
Mr. B. B. Stephenson,
Station Superintendent
Central Files
Reproduction Unit NRC 20b
j
Local PDR
Mr. Dean Hansell, Office of
Assistant Attorney General
.
l
1