Requests Review of Encl Draft SER Input,Fsar Sections 3.6 Through 3.10.Also Requests Meeting to Discuss Util Responses & Proposed Solutions for Each Open Item
ML19323B008
Person / Time
Site: Grand Gulf  Entergy icon.png
Issue date: 04/22/1980
From: Baer R
Office of Nuclear Reactor Regulation
To: Stampley N
MISSISSIPPI POWER & LIGHT CO.
Shared Package
ML19323B009 List:
References
NUDOCS 8005090105
Download: ML19323B008 (3)


Text

u _.

8005090/05 C

p%[o UNITED 5TATEs

  • ,g g

y ' > 5, g

NUCLEAR REGULATORY COMMISSION '

'.l WASHINGTON, D. C. 20555 k.... /

APR 2 z 1S80 Docket Nos. 50-416 and 50-417 Mr. N. L. Stampley, Vice President Production and Engineering Mississippi Power and Light Company P. O. Box 1640 Jackson, Mississippi 39205

Dear Mr. Stampley:

SUBJECT:

GRAND GULF NUCLEAR STATION UNITS 1 AND 2 MEETING TO RESOLVE OPEN ITEMS IN FSAR SECTIONS 3.6 THROUGH 3.10 INCLUSIVE Our review of your application for the Grand Gulf Nucite Station has progressed to the point that we now have a draft Safety Evaluation Report (SEP) in the mechanical engineering area. We propose to accelerate the remainder of our review of the mechanical engineering area on an experimental basis, as discussed below.

We request that your staff (1) review the enclosed draft SER input, (2) prepare responses to resolve each of the open items and (3) meet with the NRC staff at a mutually agreeable time and place where your staff will present and dis-cuss your responses and proposed solutions for each open item.

The objective of this meeting is to resolve each open item during the meeting l

without resorting to further written questions and answers.

In addition to l

our consultant, Batelle Pacific Northwest Laboratories, we intend to have I

appropriate NRC technical personnel attend the rneeting, through and including those at the Assistant Director level. We request that you be represented by equivalent level of management and by representatives of your NSSS vendor and architect-engineer so that decisions can be approved. Any necessary appeals would subsequently be handled at the NRC Division Director level.

When your staff has had sufficient time to review the draft SER input and has i

prepared responses to resolve each open item, you should develop an agenda for a meeting to close out the open items and propose to us a time and location for that meeting. We will then issue a meeting notice. As interested members

Mr. N. L. Stampley'

-2 APR 2% @

~

of the public may wish to attend the meeting, notice must be issued a minimum of two weeks before the meeting is held.

Please select a site which will not preclude members of the public from attending.

If you have any questions regarding this matter, please call us. Based on the outcome of this meeting (and similar meetings for Susquehanna and San Onofre),

we may wish to us this type of review in other areas of your application.

Sincerely, n.

D n

,Qvb CE{ b

  • l%

Robert L. Baer, Chief Light Water Reactors Branch No. 2 Division of Project Management

Enclosure:

Grand Gulf Draft SER ces w/o enclosure:

See next page

' h,.'

)

9

r-Mr. N. L. Stampley pg g g ig6*g Mr. N. L. Stampley Vice President - Production Mississippi Power and Light Company P. O. Box 1640 Jackson, Mississippi 39205 ccs:

Mr. Robert B. McGehee, Attorney Wise, Carter, Child, Steen and Caraway P. O. Box 651 Jackson, Mississippi 39205 Troy B. Conner, Jr., Esq.

Conner, Moore and Corber 1747 Pennsylvania Avenue, N. W.

Washington, D. C.

20006 Mr. Adrian Zaccaria, Project Engineer Grand lulf Nuclear Station Becht..I Power Corporation Gaithersburg, Maryland 20760 i