Forwards IE Insp Rept 50-312/80-08 on 800304-05.No Noncompliance Noted
ML19323A586
Person / Time
Site: Rancho Seco
Issue date: 03/21/1980
From: Spencer G
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION V)
To: Mattimoe J
SACRAMENTO MUNICIPAL UTILITY DISTRICT
Shared Package
ML19323A587 List:
References
NUDOCS 8004210422
Download: ML19323A586 (2)


See also: IR 05000312/1980008

Text

7/c

8

UNITED STATES

8"

Ig

NUCLEAR REGULATORY COMMISSION

g

,

G

j

REGION V

Q

,4

1990 N. CALIFORNI A BOULEVARD

SulTE 202. WALNUT CREEK PLAZA

g * * * , * ,e

WALNUT CREEK, CALIFORNIA 94596

HNti11986

Docket No. 50-312

Sacramento Municipal Utility District

P. O. Box 15830

Sacramento, California 95813

Attention: Mr. John J. Mattimoe

Assistant General Manager

Gentlemen:

Subject:

NRC Inspection - Rancho Seco

This refers to the inspection conducted by Mr. P. Narbut of this office

on March 4-5, 1980, of activities authorized by NRC License No. DPR-54

and to the discussion of our findings held by the inspectors with

Mr. R. Columbo and other members of your staff at the conclusion of the

inspection.

The inspection was an examination of the activities conducted in response

to the requirements of I.E.Bulletin 79-02 " Pipe Support Base Plate

Designs Using Concrete Expansion Anchor Bolts." Within these areas, the

inspection consisted of selective examinations of procedures and representative

records, interviews with personnel, and observations by the inspectors.

No items of noncompliance with NRC requirements were identified within

the scope of this inspection.

,

In accordance with Section 2.790 of the NRC's " Rules of Practice,"

Part 2, Title 10, Code of Federal Regulations, a copy of this letter and

the enclosed inspection report will be placed in the NRC's Public

Document Room.

If this report contains any information that you believe

to be proprietary, it is necessary that you submit a written application

to this office, within 30 days of the date of this letter, requesting

that such information be withheld from public disclosure. The applica-

tion must include a full statement of the reasons why it is claimed that

800u210 @ %

.

- _ _

$

Sacramento Municipal Utility District

-2-

3 gg g

.

1

the information is' proprietary. The application should be prepared so

that any proprietary information identified is contained in an enclosure

to the application, since the application without the enclosure will

also be placed in the Public Document Room.

If we do not hear from you

in this regard within the specified period, the report will be placed in

the Public Document Room.

'

Should you have any questions concerning this inspection,.we will be

glad to discuss them with you.

.

Sincerely,

_/

G. S. Spe;.u-, van

.

,

lcer, Chief

Reactor Construction and

Engineering Support Branch

!

Enclosure:

'

IE Inspection Reporc

4

No. 50-12/80-08

cc w/o enclosure:

R. J. Rodriguez, SMU3

L. G. Schwieger, SMUD

.

W

-