ML19323A191

From kanterella
Jump to navigation Jump to search
Forwards Attachments to IE Circular 80-03, Protection from Toxic Gas Hazards, Inadvertently Omitted from 800306 Transmittal
ML19323A191
Person / Time
Site: Perry  FirstEnergy icon.png
Issue date: 04/02/1980
From: James Keppler
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
To: Davidson D
CLEVELAND ELECTRIC ILLUMINATING CO.
References
NUDOCS 8004180038
Download: ML19323A191 (1)


Text

{{#Wiki_filter:_ _ _ _ _ _ _ - - _ _ _ _ _ _ _ _ _ _ _ p reeg o UNITED STATES [ ' -),, Ek NUCLEAR REGULATORY COMMISSION }lC r REGION til o, 799 ROOSEVELT ROAD GLEN ELLYN, ILLINOIS 60137 o l Docket No. 50-440 APR2 g Docket No. 50-441 l The Cleveland Electric Illuminating l Company ATTN: Mr. Dalwyn R. Davidson l Vice President l System Engineering I and Construction l P. O. Box 5000 Cleveland, OH 44101 Gentlemen: IE Circular No. 80-03 dated March 6, 1980, was inadvertently sent to you without the enclosed attachments. We are sorry for any inconvenience this may have caused you. 1 Sincerely, l 0 3Nyg " 1 James G. Keppler Director Attachments: Sections 2.2.1-2.2.2; 2.2.3 and 6.4 of NUREG 75/087 cc w/ attach: Central Files i Director, NRR/DPM ) Director, NRR/ DOR l PDR Local PDR NSIC TIC Harold W. Kohn, Power Siting Commission Mr. Daniel D. Wilt, Attorney Helen W. Evans, State of Ohio y 8004280 036

NUREG-75/087 p raco U.S. NUCLEAR REGULATORY COMMISSION ,,e ( i i STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION SECTION 6.4 HABITABILITY SYSTEMS REVIEW RESPONSIBILITIES Primary - Accident Analysis Branch (AAB) Secondary - Hydrology-Meteorology Branch (HMB) Auxiliary Systems Branch (ASB) Effluent Treatment Systems Branch (ETSB) I. AREAS OF REVIEW The control room ventilation system and control building layout and structures, as described in the applicant's safety analysis report (SAR), are reviewed with the objective of assuring that plant operators are adequately protected against the effects of accidental releases of toxic or radioactive gases. A further objective is to assure that the control room can be maintained as the center from which emergency teams can safely operate in the case of a design basis radiological release. To assure that these objectives are accom-plished the following items are reviewed: 1. The zone serviced by the control room emergency.entilation system is examined to ascertain that all critical areas requiring access in the event of an accir's are included within the zone (control room, kitchen, sanitary facilities, etc.) and to ( assure that those areas not requiring access are generally excluded from the zone. 2. The capacity of the control room in terms of the number of people it can accommodate for an extended period of time is reviewed to confirm the adequacy.J emergency food and medical supplies and self-contained breathing apparatus and to de: ermine the length of time the control room can be isolated before CO levels be one excessive. 2 3. The control room ventilation system layout and functional design is reviewed to determine flow rates and filter efficiencies for input into the AAB analyses of the buildup of radioactive or toxic gases inside the control room, assuming a design basis release. Basic deficiencies that might impair the effectiveness of the systee are examined. In addition, the system operation and procedures are reviewed. The ASB has primary responsibility in the system review area under Standard Review Plan (SRP) 9.4.1. The ASB is consulted when reviewing hardware and operating procedures. i 4 I I u A USNRC STANDARD REVIEW PLAN $" Y= de~ i =..[.$ Ym wi.. Y. m".Y .Y. U N n b.,5 ~ ~ ~ i ,T,,;;[,,,,,;,6,,,;E,,.,- : 6CE$~;,'WC'E 'a a-.*a+=J 7,, ~ ,g u-Rev. 1 i \\ j

= 4. The flow rates and iodine removal efficiencies used in the analysis are obtained from 6 the ETSB (see SRP 6.5.1). I 5. Thephysicallocationofthecontrolroomwithrespecttopotentialreleasepointsof hazardous airborne materials (SAR Chapter 2 and other pertinent chapters) is reviewed to det-nine the location and source strength of radioactive, toxic, or roxious materials. The layout of the control building is reviewed to assure that airborne-j materials will not enter the control room from corridors or ventilation ducts, etc. }~j Estimates of dispersion of airborne contamination are made in conjunction with IMI. l 6. Radiation shielding provided by structural concrete is analyzed to determine the f effectiveness of shielding and structure surrounding the control room. The control building layouts are checked to see if radiation streasing through doors (or other apertures) or from equipment might be a problem. 7. Independent analyses are performed to determine whether dose values or toxic gas con-centrations remain below recommended levels. The IMB provides meteorological input and checks the X/Q values for the control room location. l II. ACCEPTANCE CRITERIA 1. Control Room Eneroency Zone l See Section III.1 of this plan. 2. Control Room Personnel Capacity } Food, water, and medical supplies should be sufficient to maintain the emergency team ,/ (at least 5 men) for 5 days. l 3. Ventilation System Criteria (See III.3 of this plan) The following criteria deal with the verification of acceptable system performance and assurance of system availability: l Isolation Dampers - Dampers used to isolate the control zone from adjacent zones a. or the outside must be leaktight. This may be accomplished by using low leakage I dampers or valves. The degree of leaktightness should be documented in the SAR. I b. Single Failure - A single failure of an active component should not result in loss of the system's functional performance. All the components of the control room emergency filter train will be considered active components. See Appendix A for criteria regarding valve or damper repair. Pressurization Systems - Systees that will pressurize the control roce during a c. t i radiation emergency should meet the following requirements: I. '. + (1)-Those systees having pressurization rates of greater than or equal to 0.5 volume changes per hour will require periodic (every 18 months) verification I that the makeup is + 105 of design value. During plant construction or I i Rev. I 6.4-2 l

after any modifications to the control room that might significantly affect { its capability to maintain a positive pressure, measurements should be / taken to verify that the control room is pressurized to at least 1/8-inch water gauge relative to all surrounding air spaces (while applying the ~ design makeup air rate). (2) Those systems having pressurization rates of less than 0.5 and equal to or greater than 0.25 volume changes per hour will have identical testing requirements as indicated in (1), above. In addition, at the CP stage an analysis must be provided (based on the planned leaktight design features) that ensures the feasibility of maintaining 1/8-inch water gauge differential with the design makeup air flow rate. l (3) Those systems having pressurization rates of less than 0.25 voltme changes should meet all the requirements for (2), above, except that periodic verification of control room pressurization (every 18 months) will be required. 4. Toxic Gas Protection l Self-contained breathing apparatus for the emergency team (at least 5 men) should be on hand. A six-hour onsite bottled air supply should be available with unlimited offsite replenishment capability froe nearby location (s). Refer to References 3 (, through 6, and see Section III.3 of this plan. 5. Emergency Standby Filters See Standard Review Plan 6.5.1 for acceptance criteria for control room ESF systems. Credit for iodine removal efficiencies will be given in accordance with Regulatory Guide 1.52. Filter efficiencies for systems not covered by liagulatory Guide 1.52 will be determined on a case-by-case basis by ETSB. l 6. Relative Location of Source and Control Room i In general, the control room inlets must be so placed in relation to the location of potential release points as to minlaize control room contamination in the event of a release. Specific criteria as to radiation and toxic gas sources are as follows: a. Radiation Sources f As a general rule the control roce ventilation inlet should be separated from the major potential release points by at least 100 feet laterally and by 50 feet vertically. However, the actual minimum distances must be based on the dose analyses. Refer to Section III of this plan and Reference 7 for further i information. b. Toxic cases The einfeum separation distance is dependent upon the gas in question, the container size, and the available control room protection provisions. Refer to Regulatory Guide 1.78 (Ref. 3) for general guidance and to Regulatory Guide 1.95 (Ref. 4) for specific acceptable design provisions related to chlorine. Rev. 1 6.4-3 l l L

l 9 e 7. Radiation Shieldino l See discussion of General Design Criterion 19 below. 8. Radioactive and Toxic Gas Hazards a. Radiation Hazards The dose guidelines (see General Design Criterion 19, Appendix A of 10 CFR j Part 50) used in approving emergency zone radiation protection provisions are as follows: (1) Whole body gamma: 5 ren (2) Thyroid: 30 res l (3) Beta skin dose: 20 rce* The whole body gamma dose consists of contributions from airborne radioactivity inside and outside the control room, as well as direct shine from fission products inside the reactor containment building. l b. Toxic Gases For acceptance purposes, three exposure categories are defined: protective action exposure (2 minutes or less), short-term exposure (between 2 minutes and I hour), and long-term exposure (1 hour or greater). Because the physiological effects can vary w'dely from one toxic gas to another, the following general restrictions should be used as guidance: there should be no chronic effects from exposure, and acute effects, if any, should be reversible within a short period of time (several minutes) without benefit of medication other than the use of self-contained breathing apparatus. The allowable limits should be established on the basis that the operators should be capable of carrying out their duties with a minimum of interference caused by the gas and subsequent protective measures. The limits for the three categories normally are set as follows: (1) Long-term limit (1 hour or greater): use a limit assigned for occupational exposure (40-hour week). t (2) Short-tern limit (2 minutes to I hour): use a limit that will assure that the operator will not suffer incapacitating effects after a 1-hour exposure. t " Credit for the beta radiation shielding afforded by special protective clothing and eye pro-tection is allowed if the applicant commits to their use during severe radiation releases. However, even though protective clothing is used, the calculated unprotected skin dose is not to exceed 75 res. The skin and thyroid dose levels are to be used only for judging the acceptability of the design provistors for protecting control room operators under postulated design basis accident conditions. They are not to be interpreted as acceptable emergency doses. The dose levels quoted here are derived for use in the controlled plant environment and should not be confused with the conservative dose computation assumptions used in evaluating exposures to the general public for the purposes of comparison with the guideline values } of 10 CFR Part 100. I Rey,1 6.4-4

(3) Protective action limit (2 min. or less) use a limit that will assure that the operator will quickly recover af ter breathing apparatus is in place. In determining this limit, it should be assumed that the concentration increases linearly with time from zero to two minutes and that the Ilmit is attained at two minutes. The protective action limit is used to determine the acceptability of emergency zone protection provisions during the time personnel are in the process of fitting themselves with self-contained breathing apparatus. The other limits are used to determine whether the concentrations with breathing apparatus in place are applicable. (They are also used in those cases where the toxic levels are such that emergency Zone isolation without use of protective gear is suffi-cient.) As an example of appropriate limits, the following are the three levels for chlorine gas: Long-ters: 1 ppe by volume Short-ters: 4 Protective action: 15 (See Reference 3 for protective action levels for other toxic gases.) III. REVIEW PROCEDURES The reviewer selects and emphasizes aspects of the areas covered by this review plan as may be appropriate for a particular case. The judgment on areas to be given attention and emphasis in the review is based on an inspection of the material presented to see whether it is similar to that recently reviewed for other plants and whether items of special safety significance are involved. r 1. Control Room Emergency Zone The reviewer checks to see that the Zone includes the following-a. Instrumentation and controls necessary for a safe shutJown of the plant, i.e., the control room, including the critical document re'erence file. [ b. The computer roce, if it is used as an integral part of the emergency response plan. i l c. The shift supervisor's office. d. The operators' wash room and the kitchen. ( i l' The emergency zone should be limited to those spaces requiring operator occupancy. l Spaces 'such as t,attery rooms, cable spreading rooms, or any other spaces not requiring continuous or frequent occupancy after a design basis accident (DBA) generally should 6.4-5 Rev. 1 l ~ . - ~ ~ - - -. g s 4

~ be excluded from the emergency zone. Inclusion of these spaces may increase the probability of smoke or hazardous gases entering the emergency zone. They may also increase the possibility of infiltration into the emergency zone, thus decreasing the effectiveness of the ventilation system in excluding contamination. It is. advantageous to have the emergency zone located on one floor, with the areas included in the zone being contiguous. i t 1-2. Control Room Personnel Capacity l The reviewer checks to see that emergency food and water are provided. Normally, a )' five-day supply for five men would be sufficient for land-based plants. A medical kit is also helpful. Specific requirements for these items have not been formulated. The air inside a 100,000 cubic foot control room would support five persons for at least six days. Thus, CO buildup in an isolated emergency zone is not normally 2 considered a limiting problem. s a 3. Ventilation System Layout and Functional Design This area is a major portion of the review. The procedures are as follows: a. The type of system proposed is determined. The following types of protection provisions are currently being employed for boiling water reactor (BWR) or pressurized water reactor (PWR) plants: (1) Zone isolation, with the incoming air filtered and a positive pressure maintained by the ventilation system fans. This arrangement is often ) provided for BWRs having high stac*ts. Air flow rates are between 400 and / 4000 cfa. (2) Zone isolation, with filtered recirculated air. This arrangement is often provided for BWRs and PWRs with roof vents. Recirculation rates range from 2,000 to 30,000 cfa. (3) Zone isolation, with filtered recirculated air, and with a positive pret:are maintained in the zone. This arrangement is essentially the same as that in (2), with the addition of the positive pressure provision. s (4) Dual air inlets for the emergency zone. In this arrangement, two widely spaced inlets are located outboard (on opposite sides) of potential toxic and radioactive gas sources. The arrangement guarantees at least one inlet being free of contamination (except under extreme no-wind conditions). It can be used in all types of plants. Makeup air supplied from the contamination-free inlet provides a positive pressure in the emergency zone and thus minimizes infiltration. ~ Rev. I 6.4-6 l l Y " 7 - $fM#8]P4"9-WM 4 ~ E

(5) Bottled air supply for a ilmited time. In this arrangement, a flow rate of 400 to 600 cfm is provided from compressed air containers for about one (' hour, to prevent inleakage. It is used in systems hav'ng containments wh2se internal atmospheric pressure becomes negative t ithin an hour after a DBA (subatmospheric containments). 1-b. The input parameters to the radiological dose model are determined (see Item 5). The parameters are emergency zone volume, filter effie'.ency,' filtered makeup air flow rate, unfiltered inleakage (infiltration), ar< filtered recirculated air l flow rate. The ventilation system components and t % system layout diagrams are examined. c. The respor.sible reviewer in the ASB should be consulted if there are questions pertaining to the sy.tten design. He will determine if the system meets the single failure criter.'on as well as other safety requirements (see Standard Review Plan Section 9.4.1). Damper failure and fan failure are especially important. The review should confirm that the failure of isolation dampers on the upstream ride of fans will not result in too much unfiltered air entering the control room. The AAB dose analysis results are used to determine how much unfiltered air can be tolerated. d. The following information may Le used in evaluating the specific system types (see Reference 7 for further dis ussion): (1) Zone isolation, with filtered incoming air and positive pressure. These systems may not be sufficienti) effective in protecting against iodine. The staff allows an iodine prote-tion factor (IPF), which is defined as the time-integrated concentration of iodine outside over the time-integrated concentration within the emergency zone, of 20 to 100 for filters built, maintained, and operated according to Regulatory Guide 1.52 (an IPF of 100 requires deep bed filters). Such sys'.eas are likely to provide a sufficient reduction in iodine concentration only if the source is at some distance from the inlets. Thus, in most cases orely plants with high stacks (* 100 m) would meet Criterion 19 with this system. Normally the staff suggests that these systems be modified to allow isolation and operation with recircu-lated air since only minor ducting changes are necessary. (2) Zone isolation, with filtered recirculated air. These systems have a 1, greater potential for controlling fodir.e than those having oace-through .i filters. IPFs ranging from 20 to over 150 can te achieved. These are the j usual designs for plants having vents located at containment roof level. A 1, system having a recirculation rate of 5000 cfm anc a filter efficiency of l, 95% would be rated as follows: l l i, {.. - 6.4-7 Rev. 1 l s

Infiltration (cfm) IPF* 200 25 100 49 50 96 25 191 i

  • Within the range of interest, the iodine protection factor is directly 5

proportional to recirculation flow rate times efficiency. ) Infiltration should be determined conservatively. The calculated or measured gross leakage is used to detennine the infiltration rate that will be applied in the evaluation of the radiological consequences of postulated accidents. This rate is detennined as follows: (1) The leakage from the control room when pressurized to 1/8-inch water gauge is calculated on the basis of the gross leakage data. One-hal f of this value is used to represent the base infiltration rate. Component leak rates may be used to calculate gross leakage (see, for example References 8 and 9). (ii) The base infiltration rate is augmented by adding to it the estimated contribution of opening and closing of doors associated with such activ-ities as the required emergency procedures external to the control room. Normally,10 cfm is used for this additional contribution. (111) An additional factor that is used to modify the base infiltration rate is the enhancement of the infiltration occurring at the dampers or valves upstream of recirculation fans. When closed, these dampers typically are exposed to a several-inch water gauge pressure differential. This is accounted for by an additional infiltration contribution over the base infiltration at 1/8-inch water gauge. The use of an infiltration rate that is based on calculation is acceptible except in the case where the applicant has assumed exceptionally low rates of infiltration. In these cases, more substantial verification or proof may be required. For instance, if an applicant submits an analysis that shows a gross leakage rate of less than 0.06 voltme changes per hour, the reviewer would require that the gross leakage be verified by periodic tests as described in Regulatory Position C.5 of Regulatory Guide 1.95. (3) Zone isolation, with filtered recirculated air, and with a positive pressure. This system it sentially the same as the preceding one. However, an additional ope ational mode is possible. Makeup air for pressurization is adultted. It is filtered before entering the emergency zone. Pressurization reduces the unfiltered inleakage that is assumed to occur when the emergency Rev. 1 6.4-8 j

zone is not pressurized. Assuming a filter fan capacity of 5000 cfm and a fliter efficiency of 95%, the following protection factors result (flows in cfe): j IPF (Assuming IPF (Assuming Makeup Air Recirculated Air No Infiltration) Ihfiltration*) 400 4600 238 159 750 4250 128 101 1000 4000 96 80 The makeup flow rate should have adequate margin to assure that the control woom will be mainteined at a pressure of at least 1/8-inch water gauge. The applicant should indicate that an acceptance test will be performed to verify adequate pressurization. If the makeup rate is less than 0.5 volume changes per hour, supporting calculations are required to verify adequate air flow. If the makeup rate is less than 0.25 volume changes per hour, periodic verification testing is required in addition to the calculations and the acceptance test. ? A question that often arises is whether pressurization" or " isolation and recirculation" of the control room is to be preferred. Which design gives the lowest doses depends upon the assumptions as to unfiltered inleakage. Isolation is generally preferred in that it will limit the entrance of noble gases (not filterable) and, in addition, it is a better approach when the accident involves a short-term " puff release." If infiltration is 25 cfm or less, " isolation" would be best in any event. A second question related to the first involves the method of operation. The following possibilities have been considered. l t (i) Automatic isolation with subsequent manual control of pressurization. (11) Automatic isolation with immediate automatic pressurization. The first is advantageous in the case of external puff releases. Simple isolation would minimize the buildup of the unfilterable noble gases. It would also protect the filters from excessive concentrations in the case of a chlorine release. However, the second method does guarantee that infiltration (unfiltered) is reduced to near zero immediately upon accident detection. This would be beneficial inthe case where the contamination transport path r i "Normally 10 cfm inflitration is assumed for conservatism. This flow could b, reduced or elf-minated if the applicant provides assurance that backflow (primarily as a re Jult of ingress 1 and egress) will not occur. This may mean installing two-door vestibules o equivalent. p 6.4-9 - - -- + l .-n ,,.. - ~ ~ ~, - - - - i

to the energency zone is mainly inside the building. Method (1) should be used in the case of a toxic gas release and either method (i) or (11) should i, be used in the case of a radiological release, provided Criterion 19 guidelines ) can be satisfied. (A substantial time delay should be assumed where sianual isolation is assumed, e.g., 20 minutes for the purposes of dose calculations.) (4) Dual air inlets for the emergency zone. Several plants have utilized this concept. The viability of the dual inlet concept depenas upon whether or not the placement of the inlets assures that one inlet will always be free froe l contamination. The assurance of a contamination-free inlet depends in part l upon building wake effects, terrain, and the possibility of wind stagnation i or reversal. For example, in a situation where the inlets are located at the extreme edges of the plant structures (e.g., one on the north side and one on [ the south side), it is possible under certain low probability conditions for both inlets to be contaminated from the same point source. Reference 7 presents the interim position for dealing with the evaluation of X/Q's for dual inlet systems. With dual inlets placed on plant structures are on opposite sides of potential radiation release points (e.g containment building), and are capable of functioning with an assumed single active failure in the inlet isolation system, the following considerations may be applied to the evaluation of the control room X/Q's: I (1) Dual inlet designs without manual or automatic selection control - Equation (6) of Reference 7 may be used with respect to the least favorable inlet location to estimate X/Q's. The estimated values can be reduced by a factor of two (2) to account for dilution i effects associated with a dual inlet configuration. This is based l upon the dilution derived from drawing in equal amounts of clean and contaminated air through two open inlets. (ii) Dual inlet designs limited to manual selection control - Equation (6) of Reference 7 any be used with respect to the more favorable inlet location to estimate the X/Q's. The estimated values can be reduced by a factor of four (4) to account for dilution effects associated with a dual inlet configuration and the relative probability that the operator will make the proper inlet selection. The reduction factor is contingent upon having redundant radiation detectors within each air inlet. The reduction factor is based on the judgment that trained control room operators, in conjunction with radiation alars indication, will select and close the contaminated air inlet. 2 (111) Dual inlet desigas with autcoatic telection control features - Equation (6) of Reference 7 may be used with respect to the more Rev. I 6.4-10

t favorable inlet location to estimate the X/Q's. The estimated values can be reduced by about a factor of ten (10) to account for the ability to salect a " clean" air inlet. The actual factor may be somewhat j higher if the inlet configuration begins to approach the remote air inletconceptsuchthattheprobabilityofhavingonecleafbirinlet is relatively high. Plant configuration and meteorological conditions should be used as the principal basis for reduction factors greater than ten (10). The reduction factor of ten (10) or more is contingent upon having redundant radiation detectors in each inlet and the provisions of acceptable control logic which w uld be used in the automatic selection of a clean air inlet. Because damage to the ducting afght seriously affect the system capability to protect the operators, the ducting should be seismic Category I and should be protected against tornsdo missiles. In addition, the number and placement of despers must be such as to assure both flow and isolation in each inlet assuming one single active component failure. (See Appendix A i for infomation on the damper repair alternative.) The location of the intakes with respect to the plant security fence should also be reviewed. (5) Bottled air supply for a limited time. In some plant designs the containment pressure is reduced below atmospheric within one hour after a D8A. This generally assures that after one hour significant radioactive material will not be released from the containment. Such a design makes it feasible to maintain the control room above atmospheric pressure by use of bottled air. Periodic pressurization tests are required to determine that the rated flow (normally about 300 to 600 cfa) is sufficient to pressurize the control room to at least 1/8-inch water gauge. The system is also required to be composed of several separate circuits (one of wh'ch is assumed to be inoperative to account for a possible single failure). At least one (nonredundant) once-through filter system for pressurization as a staney for accidents of long i duration is also desirable. Compressed air bottles should be protected from tornado missiles or internally-generated missiles and should be placed so as not to cause damage to vital equipment or interference with operation if they fail. 4. Eneroency Standby Filters I Refer to Standard Review Plan 6.5.1. .r j i 5. Relative Location of Source and Control Room .. I This review area involves identification of all potential sources of toxic, radioactive, or othentise potentially hazardous gases and analysis of their transport to the control room. There are three basic categories: 08A radioactive sources, toxic gases such as i. 6.4-11 Rev. 1 I =. _. l \\ s

chlorine, and gases with the potential for being released inside confined areas adjacent to the control roce. a. 08A Radioactive Sources The LOCA source terms determined in Appendix A to Standard Review Plan 15.6.5 review are riferred to and routinely used to evaluate radiation levels external to the control room. The dispersal from the containment or the standby gas treatment vent is determined with a building wake diffusion model. This model is discussed in Reference 7. Other D8As are reviewed to determine whether they sight constitute a more severe hazard than the LOCA. If this is suspected, an additional analysis is performed for the suspect 08As. The HMB provides the meteorological input and reviews the AA8 calculation of X/Q values. 9 b. Toxic Gases The appitcant is asked to identify those toxic substances stored (or transported) on or in the vicinity of the site which may pose a threat to the reactor oper-ators by producing toxic gases upon accidental release. The method used to detemine whether the quantity or location of the toxic material is such as to require closer study is described in Regulatory Guide 1.78 (Ref. 3). This guide also discusses the methods for analyzing the degree of risk and states, in general terms, the various protective measures that could be instituted if the hazard is found to bs too great. In the case of chlorine, specific acceptable protective provisions have been d1termined; these are described in detail in Reference 4. In summary, the following provisions or their equivalent are required (.nartaining ') to the emergency zone ventilation systes): (1) Quick-acting toxic gas detectors. (2) Automatic emergency zone isolation. 1 (3) Emergency zone leaktightness. (4) Limited fresh air makeup rates. (5) Breathing apparatus and associated bottled air supply. [ (Note that the best solution for a particular case will depend on the toxic gas in question and on the specific ventilation systes design.) r c. Confined Area Releases The reviewer studies the control building layout in relation to potential sources inside the control building or adjacent connected buildings. The following con- ~ cerns are checked: l ~, ) Rev. I 6.4-12 .,_ : a....

(1) Storage locations of CO or other firefighting materials should be such as to 2 eliminate the possibility of significant quantities of the gases entering the j emergency zone. (The ASB has the primary responsibility in this area.) (2) The ventilation zones adjacent to the emergency zone should be enfigured and balanced to preclude air flow toward the emergency zone. (3) All pressurized equipment and piping (e.g., main steam Ifnes and turbines) that could cause significant pressure gradients when fatted inside buildings should be istlated from the emergency Zone by multiple barriers such as multiple door vestibules or their equivalent. 6. Radiation Shieldina Control room operators as well as other plant personnel are protected from radiation sources associated with a normally operating plant by various combinations of shield-ing and distance. The adequacy of this type of protection for normal operating conditions is reviewed and evaluated by the RAB. To a large extent the same'radia-tion shielding (and alssile barriers) also provides protection from design basis accident radiation sources. This is especially true with respect to the control room walls which usually consist of at least 18 inches of concrete. In most cases, the radiation coming from external design basis accident radiation sources is attenuated to negligible levels. However, the,*ollowing items should be considered qualitatively in assessing the adequacy of control room radiation shielding: Control room structure boundary. Wall, ceiling, and floor materials and thick-a. ness should be reviewed. Eighteen inches to two feet of concrete or its equivalent will be adequate in most cases. t b. Radiation streaming. The control room structure' boundary should be reviewed with respect to penetrations (e.g., doors, ducts, stairways, etc.). The potential for radiation streasing from accident sources should be identified, and if deemed necessary, quantitatively evaluated. Support from the RA8 may be required for some radiation streasing dose calculations. c. Radiation shielding from internal sources. If sources internal to the control roce complex are identified, radiation shielding against thee should be reviewed. Typical sources in this category include contaminated filter trains, or airborne radioactivity in enclosures adjacent to the control room. 4 Evaluations of radiation snielding effectiveness with respect to the above items ,i should be perforrad using staplified analytical models for point, ifne, or volume i i sources such as those presented in References 10 and 11. If more extended analysis is ) required, analytical support free the RA8 should be requested. The applicant's I

  • coverage of the above itees should also be reviewed in terms of completeness, method of analysis, and assimptions.

1 4.4 Rev. 1 ..- ~ - -.. - -.. = .t* l

7. Independent Analyses a. Control Room Doses Although the applicant is required to calculate doses to the control room, operators, independent analyses are made by the AAB because of the diversity of i control roce habitability system designs and the engineering judgment involved in their evaluation. Using the approach indicated in Reference 7, the source terms and doses due to a DBA are calculated. The source terms detennined by the AA8's independent analysis of LPZ doses for a LOCA are used. The methods and assumptions for this calculation are presented in Appendix A to Standard Review i Plan 15.6.5. The control room doses are determined by estimating the X/Q from the source points to the emergency zone using meteorological input supplied by l the HMB, by determining the credit for the emergency zong's protection features, and by calculating the dose. Figure 6.4-1 shows a form which may be used to summarize the information that is needed for the control room dose calculation. The effective X/Q's are used for calculating the doses. The dose is then compared with the guidelines of General Design Criterion 19. If the guidelines are exceeded, the applicant is asked to improve the system. In the event that f other DBAs are expected to result in doses comparable to or higher than the LOCA, additional analyses are performed. The limiting accidents are compared with Criterion 19. b. Other Analyses Special case analyses are performed when questions are raised about certain poten-tial sources of toxic or radioactive gases. The methods used in these analyses conform to current DBA methods concerning dispersion and dose calculations. ) Regulatory Guide 1.78 should be consulted by the site analyst to see if nearby i facilities could present a potential hazard that requires detailed analysis. IV. EVALUATION FINDINGS The reviewer veriffes that sufficient infonsation has been provided and that the review ari calculations support conclusions of the following type, to be included in the staff's safety evaluation report: 1. ."' the plant meets Criterion 19, tb following statement or its equivalent is made: "The appilcant proposes to meet General Design Criterion 19 of Appendix A to 10 CFR Part 50 by use of concrete shielding and by installing redundant cfm recirculating charcoal filters in the control room ventilation system. These filters will be automatically activated upon an accident signal, high radiation signal, or high chlorine signal. Independent calculations of the potential radiation doses to control roce psrsonnel following a LOCA show the resultant doses to be within the guidelines of Criterion 19." t e ) Rev. 1 6.4-14

_,.._. q.. n.

e 2. If the design is not adequate, the fact is stated. Alternatives such as an increase in { the charcoal filter flow rate may be indicated as is given in the example below: "The staff has calculated the potential radiation doses to control room personnel following a LOCA. The resultant whole body doses are within the gu'idelines of Criterion 19. The thyroid dose resulting from exposure to radioactive iodine exceeds the dose guidelines. The applicant will be required to commit to increasing the filtration system size from 2000 cfm to 4000 cfa. This increased filtration will be sufficient to keep the estimated thyroid doses within the guidelines." 3. If special protection provisions for toxic gases are not required, the following state-ment or its equivalent is made: "The habitability of the control room was evaluated using the procedures described in Regulatory Guide 1.78. As indicated in Section 2.2, no offsite storage or transport of chemicals is close enough to the plant to be considered a hazard. There are no onsite chemicals that can be considered hazardous under Regulatory Guide 1.78. A sodium hypochlorite blocide system will be used, thus elfelnating an onsite chlorine hazard. Therefore, special provisions for protection against toxic gases will not be required. Self-contained breathing apparatus is provided for the i emergency crew to provide assurance of control room habitability in the event of occurrences such as smoke hazards." 4. If special protection provisions are required, compliance or noncompliance with the guidelines of Regulatory Guides 1.78 and 1.95 should be stated. 4 V. REFERENCES 1. 10 CFR Part 50, Appendix A, General Design Criterion 19, " Control Room." 2. Regulatory Guide 1.52, " Design, Testing, and Naintenance Criteria for Engineered-Safety-Feature Atmosphere Cleanup System Air Filtration and Adsorption Units of Light-Water-Cooled Nuclear Power Plants." 3. Regulatory Guide 1.78, " Assumptions for Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release." i 4. Draft Regulatory Guide 1.95 " Protection of Nuclear Power Plant Control Room Operators Against en Accidental Chlorine Release." ~ 5. Draft Regulatory Guide 8.X, " Acceptable Programs for Respiratory Protection." 6. " Manual of Respiratory Protection Against Airborne Radioactiire Material," WASH-1287, U.S. Atomic Energy Commission (1974). l t Rev. I 6.4-15 1 c' + * ).

      • -y-7 l

t 7. K.G. Murphy and K.M. Campe, " Nuclear Power Plant Control Room ventilation System Design for Meeting General Design Criterion 19," 13th AEC Air Cleaning Conference, August 1974. ~ 8. " Leakage Characteristics of Openings for Reactor Housing Components," NAA-SR MEM0-5137, Atomics International, Of v. of North American Avf ation, Inc., June 20,1%0. , 9. R.L. Koontz, et al., " Leakage Characteristics of Conventional Building Components for Reactor Housing Construction," Trans. Am. Nucl. Soc., November 1961. 10. R.G. Jaeger, et al., eds., " Engineering Compendium on Radiation Shielding," Vol.1, " Shielding Fundamentals and Methods," Springer-Verlag (1968). 11. N.M. Schaeffer, " Reactor Shielding for Nuclear Engineers," TID-75951, U.S. Atoste Energy Commissfon, i l l Rev. 1 6.4-15 1

/ SECTION 6.4 APPENDIX A ~ ACCEPTANCE CRITERIA FOR VALVE OR DAMPER REPAIR ALTERNATIVE The control room ventilation system must meet the criterion that it work properly even with a single failure of an active component. In certain cases, complex valve or damper configurations I I are required to meet the single failure criterion. For example, assurance of the isolation and operability of each leg of a dual inlet system at various times after a postulated accident I could require a four-valve arrangement in which two pairs of series valves are connected in parallel. The mechnical, power, and control components of such arrangements combine to form a rather complex system. Credit will be allowed for an alternative system that allowed the failed valve to be manually repositioned so that it will not interfere with the operation of the system. For example, in the case of a dual inlet system, if credit for repair is given, then two valves in series in each leg of the dual inlet would be acceptable. Where a valve falls closed but meets the criteria given below, credit would be allowed for the valve to be i repositioned and locked in an open position. The approval of the repair option is contingent upon the intrinsic reliability of the internal 6 components of the valve or damper and also upon the ease and ability to overcome the failure of the external actuating components (electrical relays, actors, hydraulle pistons, etc.). The following criteria or their equivalent will be required: 5 1. The valve or damper components must be Ifsted as to which are considered internal I (nonrepairable) and which external (repatrable). These must be designed to meet the following criteria. a. Internal valve components (components that are difficult to repair manually without 5 opening the ductwork) must be judged to have a very low probability of failure. The i component design details will be reviewed and characteristics such as simplicity, ruggedness, and suspectibility to postulated failure mechanisms will be considered in i arriving at an engineered judgment of the acceptability of the internal component j i design with respect to reliability. For example, a butterfly valve welded or keyed onto a pivot shaft would be considered a high reliability internal component. Conversely, multiple-blade dampers, actuated by multi-element linkages or pneumatically-operated components internal to the ducts, would be viewed as being i subject to failure. b. External valve components (components including actors and power supplies that are to be assumed rapairable or removable) must be designed to ensure that the failed valve component can be bypassed easily and safely and that the valve can be manipulated into an acceptable position. The electronic components must be isolated free other , [,, equipment to assure that the repair operations do not result in further equipment s failure. 6.4-17 Rev. I l \\ .. ~

2. The location and positioning of the valve or damper must permit easy access from the control room for convenient repair, especially under applicable DBA conditions. 3. Appropriate control room instrumentation should be provided for a clear indication'and annunciation of valve or damper malfunction. 4. Periodic manipulation of the valve or damper by control room operators should be required for training purposes and to verify proper manual operability of the valve or damper. 5. 'The need for manual manipulations of the failed valve or damper should not be recurrent during the course of the accident. Manipulation should not occur more than once during the accident. Adjustmentorrealignmentofotherpartsofthesystemshouldbepossible from the control room with the failed valve in a fixed position. 6. The time for repair used in the computation of control room exposures should be taken as the time necessary to repair the valve plus a one-half hour margin. No manual correction will be credited during the first two hours of the accident. 7. Compliance with the above criteria should be documented in the SAR whenever the repair option is used. 4 4 t i i l ~ 1 l ) I Rev. 1 6.4-14 ~. -, z. - - - - ' ' - ~ ~ :.-= - -

FIGURE 6.4-1 Summary Sheet for Control Room Duse Analysis / MEMORANDUM TO: (Site Analyst) (Meteorologist) cc: L. Halman R.W. Nouston (Habitability File) CONCERNING CONTROL ROOM DOSE ANALYSIS FOR The following summarizes the X/Q's used in determining the control room operator dose for the subjectplant: ? VENTILATION SYSTEM DESCRIPTION I' SKETCH OF SYSTEM (and inlets / sources if applicable) .I Sl8MATION OF X/Q ANACSIS Source / Receptor Type and Di vance S/D Ratio K Factor Number of 22 1/2* Wind Directica t Sectors that Result in Exposure Central Wind Sector (sector wind is blowing from) 5% Wind Speed (m/sec) 40% Wind Speed (m/sec) 2 3 Projected Area of Wake (m ) 5% X/Q (sec/m ) C f Time Wind Speed Factor Wind Ofrection Factor Occupancy Factor Effective X/0's 0-8 hr 1 1 1 8-24 hr 1 i 1-4 day

0. 6 4-30 day 0.4

+ '. r \\ ACTION REQUESTED Site Analyst ( ' el For your information only Please use the effective X/Q's in TACT run and provide control room doses. In aodf-I tion. please summarize safety system assumptions and indicate their status (interim or i i. final). \\ Meteoroloulst These are interim X/Q's. Please review to determine their reasonableness. j These are final X/Q's. Please determine if they are accurate based on your analysis of site data. .I e l Please Contact I 6.4-19 Rev. 1 - ---.~-----------,---,--;---.---

l-NUKE 275/087 pa as: y U.S. NUCLEAR REGULATORY COMMISSION ( i i STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION I j IDENTIFICATIONOFPOTENTIALHAZARDSINSITEVIChlTY l SECTIONS 2.2.1 - 2.2.2 REVIEW RESPONSIBILITIES Primary - Accident Analysis Branch (AAB) Secondary - None i 1. AREAS OF REVIEW . Locations and separation distances from the site of industrial, military, and transportation facilities and routes in the vicinity of the site. Such facilities and routes it.clude air, ground, and water traffic, pipelines, and fixed manufacturing, pmcessing, and i 7 storage facilities. Potential external hazards or hazardous materials that are present or which may reasonably be expected to be' present during the projected life time of the proposed plant. The purpose of this review is to establish the inforination concerning the presence of potential exterr.al hazards which is to be used in further review in Sections 2.2.3, 3.5.1.5, and 3.5.1.6. II. ACCEPTAFCE CRITERIA 1. Data in the SAR adequately describes the locations and distances of inwustrial. l t military, and transportativ facilities in the vicinity of the plant, and is in agreement with data obtained from other sources, when available. .( 2. Descriptions of the nature and extent of activities conducted at nearby facilities, including the products and materials likely to be processed, stored, used, or trans-ported, are adequate to pemit evaluations of possible hazards in Part 3 review sections dealing with specific hazards. 3. Where potentially hazardous materials may be processed, stored, used, or transported in the vicinity of the plant, sufficient statistical data on such materials are l pmvided to establish a basis for evaluating the potential hazard to the plant. III. REVIEW PROCEDURES Selection anti emphasis of various aspects cf the areas covered by this review plan will be made by the reviewer on each case. The judgneat of the areas to be given a* tention [ during the review is to be based on an in?pection of the material presented, the similarity of the material to th.t recently reviewed on other plants, and whether items of special l safety significance art involved. The following procedures are followed: i I USNRC STANDARD REVIEW PLAN j W *". O".," '"'"n '7 "" *'*".* " *" *.""." lll'll.' W."'lll"l'l ". c"

. 'J".".*." ll ~

, " "","'l".".. ,'~,,',,,,7,, ",,;.;,&,,g:[E.'"g~.:,'E ""Ea::::: ;;.%"C."J::! = 'e r,. ee _ e,. m. sans. is. vs. muss,ame osa. e n , n n.e use.ma.s esc.samL Re s.1 T e g F g s .,3 ,,,,.( .w w- ..m..

o ~ 1. The reviewer should be especially alert, in the construction pemit(CP) stage review, for any potentially hazardous activities in close proximity of the plant, since the variety of activities having damage potential at ranges under about one kilometer can ) be very extensive. All identified facilities and activities within eight kilometers (5 miles) of the plant should be reviewed. Facilities and activities at. greater distances should be considered if they otherwise have the potential for*tffecting,- ~ plant safety-related features. At the operating license (OL) stage, most hazards s will already have been identified. Emphasis should be placed on any new infonnation. At the operating license stage, any analyses pertaining to potential accidents involv-ing hazardous materials or activities in the vicinity of the plant will be reviewed to ensure that results are appropriate in light of any new data or experience which is then available. Facilities which are likely to either produce or consune hazardous materials should be investigated as possible sources of traffic of hazardous materials past the site. 2. Information should be obtained from sources other than the SAR wherever available, and should be used to check the accuracy and completeness of the infonnation submitted in the SAR. This independent infonnation may be o'btained from sources such as U.S. Geological Survey (USGS) maps and aerial photos, published documents, contacts with state and federal agencies, and from other nuclear plant applications (especially if they are located in the same general area or on the same waterway.) Information should also be obtained during the site visit and subsequent discussions with local officials. (See Stanoard Review Plan 2.1.1 for further guidance with regard to site visits.) An attempt should be made to investigate future potential hazards over the, pr oposed life of the plant. 3. The specific infonnation relating to types of potentially hazardous material, includ-ing distance, quantity, and frequency of shipment, is reviewed to eliminate as many i of the" potential accident situations as possible by inspection, based on past review experience. At the operating license stage, nearby industrial, military and trans-portation facilities and transportation routes will be reviewed for any changes or additions which may affect the safe operation of the plant. If these changes alter the data or assunptions used in previous hazards evaluations or demonstrate the need for new ones, appropriate evaluations will be performed. For pipeline hazards Reference 7 may be used as an example of an acceptable risk assessment. For cryogenic fuels, Reference 9 may be used, and for tank barge risks, Reference 8. For military aviation, Reference 10 may be used. Safe separation ? distances for explosives are identified in Reference 2, and for toxic chemicals, References 3 and 4 should be consulted. I The distance from nearby railroad lines is checked to determine if the plant is within the range of a

  • rocketing" tank car which, from Reference 5, is taken to be p

350 meters with the range for smaller pieces extending to 500 meters, s l. l Ll! Rev. 1 2.2.1-2 e i I + g e l e y. ,~ ~s,-

4 Potent'. accidents which cannot be eliminated from conside:'cion as design basis events pecause the consequences L' the accidents, if they should occur, could be ( serious enough to affect plant safety-ruted features, are identified. Potential 5, accidents so identified are assessed in detai!, using criteria in Standard Review Plan Sections 2.2.3, 3.5.1.5, or 3.5.1.6, as appopriate. IV. EVALUATION FINDINGS The reviewer veriffes that sufficient information has been provided, and that his evalu-ation is sufficiently complete and adequate to support conclusions of the following type, to be used in the staff's safety evaluation report: "The nature and extent of activities involving potentially hazardous seterials which are conducted at nearby industrial, military, and transportation facilities have been evaluated to identify any such activities which have the potential for adversely affecting plant safety-related structures. Based on evaluation of infonnation con-tained in the SAR, as well as information independently obtained by the staff, it is o concluded that all potentially hazardous activities in the vicinity of the plant have been identified. The hazards associated with these activities have been reviewed and are discussed in Sections, and of this SER." If the activities are identified as being potentially hazardous, the evaluations described in Standard Review Plans 2.2.3, 3.5.1.5 and 3.5.1.6 are performed with respect to the l inherent capability of tha plant or special plant design measures to prevent radiological releases in excess of the 10 CFR Part 100 guidelines. ( V. REFERENCES 1. Department of the Army Technical Manual TM5-1300, " Structures to Resist the Effects of Accidental Explosions," June 1969. 2. Regulatory Guide 1.91, " Evaluation of Explosions Postulated to Occur on Transportation Routes Near Nuclear Power Plant Sites." 3. Regulatory Guide 1.78, "Asstanptions for Evaluating the Habitability of a Nuclear Power Plant Control Room During a Postulated Hazardous Chemical Release." 4 4. Regulatory Guide 1.95, " Protection of Nuclear Power Plant Control Room Operators Against an Accidental Chlorine Release." l t 5. National Transportation Safety Board Railroad Accident Report, " Southern Railway Company Train 154. Derailment with Fire and Explosion, Laurel, Mississippi, January 25,1%9," October 6,1959. 6. Regulatory Guide 1.70, " Standard Format and Cor. tent of Safety Analysis Reports for Nuclear Power Plants," Revision 2. 8 4 2.2.1 -3 Rev. I j I i .. - - - -... ~...

i 7. NUAEG-0014 Safety Evaluation Report, Hartsville Nuclear Plants A1, A2, B1, and B2, April 1976, Docket STN 50-518. ') 8. Safety Evaluation of the Beaver Valley Power Station, Unit No. 2 November 9, 1976 and supplements. Docket 50-412. 9. Safety Evaluation Report Hope Creek Ceerating Station, Units 1 and 2, Supplement No. 5. March 1976. Docket 50.'54 and 50-355.

10. Project 485, Aircraft Considerations Preapp1? cation Site Review, Boardman Nuclear Plant. October 1973.

l s P g O i s 8 e k e L . a com-m -mo orner, im_m.nmn 1 a 9 g Rev. I 2.2.1-4 D e~ ~..m ~ e e, 8 4 g w

p2.sco NUREG-75/087 y U. WOCLEAR REGULATORY COMMISSION o i 1 STANDARD REVIEW PLAN OFFICE OF NUCLEAR REACTOR REGULATION SECTION 2.2.3 EVALUATION OF POTENTIAL ACCIDENTS ~$ REVIEW Resp 0NSIBILITIES Primary - Accident Analysis Branch (AAB) Secondary - Applied Statistics Branch (ASB/MPA) I. AREAS OF REVIEW t The applicant's identification of potential accident situations in the vicinity of the plant is reviewed to determine the completeness of and the bases upon which these potential accidents were or were not acconinodated in the design. (See Standard Review Plans 2.2.1 and 2.2.2.) The appl: ant's probability analyses of potential accidents involving hazardous materials f or activil.ies in the vicinity of the plant, if such analyses have been performed, are also reviewed by ASB/MPA on request by AAB to determine that appropriate data and analytical models have been utilized. The analyses of the consequences of accidents involving nearby industrial, military, and l transportation facilities which have been identified as design basis events are reviewed. i C, t II. ACCEPTANCE CRITERIA The identification of design basis events resulting from the presence of hazardous materials l or activities in the vicinity of the plant is acceptable if the design basis events include { each postulated type of accident for which the expected rate of occurrence of potential exposures in excess of the 10 CFR Part 100 guidelines is estimated to exceed the NRC staff objective of approximately 10-7 per year. Because of the difficulty of assigning accurate numerical values to the expected rate of unprecedented potential hazards generally con-sidered in this review plan, judgment must be used as to the acceptability of the overall risk presented. The probability of occurrence of the initiating events leading to potential consequences in excess of 10 CFR Part 100 exposure guidelines should be estimated using assumptions that are as representative of the' specific site as is practicable. In addition, because of the low probabilities of the events under consideration, data are often not available e to permit accurate calculation of probabilities. Accordingly, the expected rate of occur-rence of potential exposures in excess of the 10 CFR Part 100 guidelines of approximately p .I 10-6 per year is acceptable if, when combined with reasonable qualitative arguments, the l 'I realistic probability can be shown to be lower. I t. l j usNac STANDARD REVIEW PLAN

=
.~=. ~.r.:
.". ::..?.
==.:

i ~ d";;:.17~rd.~.,mE#MF*-'-'# ~'U~-'b"T , (. l j i Rev.1 l i s ~ 's. ~

p The effects of design basis events have been adequately considered if analyses of the l effects of those accidents on the safety-related features of the plant have been perforw'd and measures (e.g., hardening, fire protection) to mitigate the consequences of such ) events have been taken, f III. REVIEW PROCEDURES g y[ 1.'some cases it may be necessary to consult with or obtain specific data from other i ~ d branches, such as the Structural Engineering Branch (SEB) or Auxiliary Systems Branch l l (ASB), regarding possible effects of external events on plant structures or components. The applicant's probability calculations are reviewed, and an independent probability analysis is performed by the staff if the potential hazard is considered significant enough to affect the licensability of the site or is important to the identification of design basis events. l All stochastic variables that affect the occurrence or severity of the postulated event are identified, and judged to be either independent or conditioned by other variables. Probabilistic models should be tested, where possible, against all available information. If the model or any portion of it, by simple extension, can be used to predict an'obseru able accident rate, this test should be performed. The design parameters (e.g., overpressure) and physical phenomena (e.g., gas concentration) j selected by the applicant for each design basis event are reviewed to ascertain that the values are comparable to the values used in previous analyses and found to be acceptable by the staff. Each design basis event is reviewed to determine that the effects of the event on the safety features of the plant have been adequately acconnodated in the design. If accidents involving release of smoke, flamable or nonflannable gases, or cheinical bearing clouds are considered to be design basis events, an evaluation of the effects of these accidents on control room habitability should be made in SAR Section 6.4 and on the operation of diesels and other safety-related equipment in SAR Chapter 9. Special attention should be given to the review of standardized designs which propose criteria involving individual numerical probability criteria for individual classes of external man-made hazards. In such instances the reviewer should establish that the 4 envelope also includes an overall criterion that limits the aggregate probability of exceed-ing design criteria associated with all of the identified external man-made hazards. ~j Similarly, special attention should be given to the review of a site where several man-made ~4 hazards are identified, but none of which, individually, has a probability exceeding the ~ acceptance criteria stated herein. The objective of this special review should be to assure that the aggregate probability of an outcome that may lead to unacceptable plant damage meets the accertarre criteria of Part II of this SRP Section. (Ahypothetical ] example is a situation where the probability of shock wave overpressure greater than design ? Rev. I 2.2.3-2 l-i , )- ,b ~' 3,,

E .s overpressure is about 10"I per reactor year from accidents at a nearby industrial facility. and approximately equal probabilities of exceeding design pressure from railway accidents, highway accidents and from shipping accidents. Individually each may be judged acceptably Iow; the aggregate probability may be judged sufficiently great that addit,lonal features of design are warranted.) I .'i t IV. EVALUATION FINDINGS If the reviewer verifies that sufficient information has been provided and that his evaluation is sufficiently complete and adequate to meet the acceptance criteria in Section II of this SRP, conclusions of the following type may be prepared for the staff's safety evaluation 's report: "The applicant has identified potential accidents which could ocrir in the vicinity of the plant, and from these has selected those which should be considered as design l basis events and has provided analyses of the effects of thes e accidents on the safety-related features of the plant. The applicant has demonstrated that the plant is adequately protected and can be operated with an acceptable degree of safety with regard to potential accidents which may occur as the result of activities at nearby industrial, military, and transportation facilities." V. REFERENCES Regulatory Guide 1.70, " Standard Format and Content of Safety Analysis Reports for Nuclear Power Plants," Revision 2. Affidavit of Jacques B. J. Read before the Atomic Safety and Licensing Board in the matter of Skagit Nuclear Power Project Units 1 and 2. July 15,1976. Docket Mos. STN 50-522, 523. Atomic Safety and Licensing Board, Supplemental Initial Decision in the Matter of Hope Creek Generating Station, Units 1 and 2. March 28, 1977. Docket Nos. 50-354, 355. Section 2. Supplement 2 to the Floating Nuclear Plant Safety Evaluation Report. Docket No. STN 50-437, September 1976. )- 1 -{ l

  • 'i

? J \\ ! {- P . g' 2.2.3-3 Rev. I l .*r,' /,,, n -}}