ML19322E613

From kanterella
Jump to navigation Jump to search
Forwards Review Schedule for Environ Qualification of Class IE Electrical Equipment Per 800221 Meeting.Resubmittal of Info Is Unnecessary.References or Updates to Info Previously Submitted Are Acceptable
ML19322E613
Person / Time
Site: Yankee Rowe
Issue date: 03/06/1980
From: Ziemann D
Office of Nuclear Reactor Regulation
To: Kay J
YANKEE ATOMIC ELECTRIC CO.
References
TASK-03-12, TASK-3-12, TASK-RR NUDOCS 8004020004
Download: ML19322E613 (5)


Text

- - -

'Tgg4

/

8

'o't UNITED STATES NUCLEAR REGULATORY COMMISSION g

C WASHINGTON, D. C. 20555 k.....,o March 6,1980 Docket No. 50-29 Mr. James A. Xq Senior Engineer-Licensing Yankee Atomic Electric Company 25 Resear;h Drive Westborough, Massachusetts 01581

Dear Mr. Kay:

RE: EhVIRONMENTAL QUALIFICATION OF ELECTRICAL EQUIPMENT YMKEE R0WE AT'MIC POWER STATION Reference 1: Guidelines for evaluating environmental qualification of Class lE Electrical Equipment in operating reactors - to NRC letter to licensees, dated February 15, 1980.

. Reference 2: Guidelines for identification of that safety equipment of SEP operating reactors for which environmental qualification is to be addressed - Enclosure 2 to NRC 1etter to licensees dated February 15, 1980.

In our meeting of February 21, 1980 regarding the subject program, we indicated that an accelerated review schedule was being developed for this program.

The schedule is attached as Enclosure 1, which includes the required date for your submittal showing conformance to the qualification guidelines of reference 1.

The information to be provided in your submittal, as required by references 1 and 2, is summarized in Enclosure 2.

Where you have previously submitted some of the required information, it is sufficient to incorporate information already on the docket by specific reference.

It is not necessary to resubmit.

However, an orderly organization of the information shguld be maintained.

For example, if any previously submitted table is changed, revised pages should be submitted. does not show submittal dates for Palisades and Oyster Creek, since the scheduled site visits for these plants precede any practical submittal date.

Material provided for these two plants will be upgraded to the level of other plant submittals through a question-and-answer process.

  • 04020 43 p D

Mr. James A. Kay March 6, 1980 With respect to containment environmental conditions and systems required for accident mitigation we will request additional information, some of it prior to the dates listed in the enclosure, and provide some clarification of the guidelines.

Sincerely, V

&f

/

yd

'. f( Dennis L. Ziemann, Chief Operating Reactors Branch #2 Division of Operating Reactors

/

Enclosures:

As stated

-%==

l 4

w r--.

,n.----.--g-,.---e

, - - - - --n.---,

+.--,, -

Nr. James A. Kay

, March 6, 1980 e

cc w/ enclosures:

Mr. Jares E. Tribble, President Yankee Atomic Electric Company 25 Research Drive Westborough, Massachusetts 01581 Greenfield Community College 1 College Drive Greenfield, Massachusetts 01301 Chai rman Board of Selectmen Town of Rowe Rowe, Massachusetts 01367 Energy Facilities Siting Council 14th Floor One Ashburton Place Boston, Massachusetts 02108 Director, Technical Assessment Division Office of Radiation Programs (AW-459)

U. S. Environmental Protection Agency Crystal Mall #2 Arlington, Virginia 20460 U. S. Environmental Protecticn Agency Region I Office ATTN: EIS C0ORDINATOR JFK Federal Building Boston, Massachusetts 02203 K M C, Inc.

ATTN:

Richard E. Schaffstall 1747 Pennsylvania Avenue, N. W.

Suite 1050-Washington, D. C.

20006 4

ENCL.0SURE 1 SEP QUALIFICATION PROGRAM SCHEDULE Licensee Site Visit Consul tant Plant Submittal Date (week of)

Final Report i

Palisades Currently under review 1/21 6/30 Oyster Creek Currently under review 3/10 7/ 21 Ginna 4/25 5/5 8/4 Zion 2 5/1 5/19

  • 8/11 Indian Pt. 3 5/1 6/2 8/18 Zion 1 5/1 6/9 8/11 Indian Pt. 2 5/1 6/16 9/2 Millstone 1 6/ 2 6/23 9/8 Haddam Neck 6/ 2, -

7/7 9/15 Dresden 2 6/2 7/14 9/22 San Onofre 6/ 2 7/21 9/29 Dresden 1 6/2 7/28 10/6 Yankee Rowe 6/2 8/4 10/14 Lacrosse 7/1 8/11 10/20 Big Rock Point 7/1 8/18 10/27

  • Effort will be made to perform a significant portion of the Zion 1 site evaluation at this time.

ENCLOSURE 2 SEP QUALIFICATION PROGRAM SUBMITTAL CONTENT 1.

The emergency procedures and list of safety-related systems addressed in reference 2.

2.

The definition of and basis for the hostile service conditions both inside and outside containment addressed in reference 1 section 4.0, Service Conditions.

3.

The identification and justification of equipment considered qualified by experience in accordance with reference 1 section 4.3.3, Areas Normally Maintained at Room Conditions.

4.

The tabulation of safety-related equipment located in a hostile environment, with identification of the service conditions and oualification testing for each, in the format used for either SEP Topic III-12 or IE Bulletin 79-018 submittals.

5.

The list of equipment in the tabulation of item 4 that is not qualified in accordance with the specific requirements of reference 1, together with justification for the deviations from the guidelines.

Reference 1:

Guidelines for evaluating environmental qualification of Class lE Electrical Equipment in operating reactors.

Guidelines for identification of that safety equipment of Reference 2:

i SEP operating reactors for which environmental qualification is to be addressed.

_ _ _,