ML19322E335
| ML19322E335 | |
| Person / Time | |
|---|---|
| Site: | Trojan File:Portland General Electric icon.png |
| Issue date: | 01/24/1980 |
| From: | Lainas G Office of Nuclear Reactor Regulation |
| To: | Schwencer A Office of Nuclear Reactor Regulation |
| Shared Package | |
| ML19322E336 | List: |
| References | |
| NUDOCS 8003270207 | |
| Download: ML19322E335 (3) | |
Text
-
? - '.,
- UNITED STATES e
a NUCLEAR REGULATORY COMMISSION g
wAsHWGTON. D. C.20065 j
a s.,
/
JAN 2 413o0 t
I MEMORANDUM FOR:
A. Schwencer, Chief, Operating Reactors Branch #1, D0R FROM:
G. Lainas, Chief. Plant Systems Branch, DOR
SUBJECT:
SAFETY EVALUATION REPORT SUPPLEMENT, FIRE PROTECTION PROGRAM REVIEW, TROJAN NUCLEAR PLANT (TAC 11073)
Plant Name: Trojan Nuclear Plant Licensee: Portland General Electric Docket No.: 50-344 Project Manager:
C. Tramell Status: See enclosure 1 Our initial Safety Evaluation Report dealing with fire protection at the Trojan Nuclear Plant was issued on March 9,1978.
In Section 3 of the SER, certain items were identified as incomplete and requiring further information from the licensee and evaluation by the staff.
We have completed our review of information dealing with these incomplete items as pmvided in licensee responses of July 27, and September 29, 1978, and January 9 April 18, June 18, July 30, and August 22, 1979, and amendments 7 and 8 to PGE 1012. " Trojan Nuclear Plant Fire Protection Review."
The results of our review are enclosed. We find that the incomplete items have been acceptably resolved subject to the implementation of the proposed modifications, with the exception of item 3.2.2.
Our requirement that should be satisfied to resolve item 3.2.2 has been previously transmitted to you by memorandum of January 17, 1980.
The implementation schedule for the proposed modifications should be obtained with the objective of completing all modifications by October 1980.
Fira protection engineering support was vided in this review by DSS.
&f G
ainas, Chief Plant Systems Branch Division of Operating Reactors j l
cc:
See page 2 l
10_%M 6 p
t3003270 b;
. s' a.
2-JAN 2 41980 contact:
H. George X-27136 i
Enclosures:
As stated cc w/ enclosures:
D. Eisenhut R. Tedesco W. Gamill V. Benaroya R. Ferguson T. Wambach C. Tramell H. George G. Harrison J
e l
.m
- - - + -
ENCLOSURE 1 FIRE PROTECTION PROGRAM REVIEW - STATUS TROJAN NUCLEA_R PLANT Licensee Staff
Response
Item Evaluation Due 3.1.4 Sprinkler System Complete
- None 3.1.7 Smoke Exhaust Fans Comolete*
None 3.1.12 Remote Shutdown Capability Complete
- None 3.2.1 Cable Penetration Firestops Complete ~
None 3.2.2 Cable Tray Tests Requirement-30 days 3.2.3 Effects on Safe Shutdown Where Redundant Cables Are in Proximity Complete None 3.2.4 Water Shielding Complete None 3.2.5 Administrative Controls Complete.
None 3.2.6 Containment Fire Suppression Complete None 3.2.7 Cable Penetration Area Fire Protection Complete None
- Evaluation being transmitted by separate memo.
O e
9 i
l
_ _-