ML19322D737
| ML19322D737 | |
| Person / Time | |
|---|---|
| Site: | Crane |
| Issue date: | 02/25/1980 |
| From: | Lehman L METROPOLITAN EDISON CO. |
| To: | Leech P Office of Nuclear Reactor Regulation |
| References | |
| TLL-064, TLL-64, NUDOCS 8002250739 | |
| Download: ML19322D737 (3) | |
Text
_ -_
4 6 Metropolir.n Edison Company Post Office Box 480 gj Middletown, Pennsylvania 17057 717 944 4041 Wnter's Direct 0.al Number February
, 1980 TLL 064 Environmental Projects - Branch 2 Attn:
Paul Leech U. S. Nuclear Regulatory Commission 7920 Norfolk Avenue Mail Stop P-522 Bethesda, MD 20014
Dear Mr. Leech:
Enclosed, please find drawings depicting the TMI-II reactor vessel and internals, and the reactor coolant system. These drawings, individually listed in the enclosure to this letter, are forwarded in response to a request made by Mr. Roy McConnell of Argonne.
Should you have any comments or questions regarding these drawings, please contact me.
cer
.y,
~
h%k
. Lehman, Jr.
Licensing Engineer LJL: hah cc:
L. R. Pletke (B&W) e<
t V
/
uerrecettan ec: son ccmcany :s a uemeer c6 OM.Iab0 ve
- A0#4 uoi c uts:t es svstem 7 gu A l
TLL C64 DFAWING NO.
DRAWING TITLE 27053F4 Core Barrel Assembly 27051F5 Upper Grid Assembly 27052F12 Lower Grid Assembly 27054F2 Plenum Cylinder Forming & Welding Details Z-7348B Outline - Reactor Coolant Pump (A-C Motors) 27057F13 Core Support Assembly 27036F2 Internals General Arrangement 05-508-011-402 9000 Horsepower Reactor Coolant Pump Motor Outline 05-507-907-405 9000 Horsepower Reactor Coolant Pump Motor Cross Section 134901E13 General Outline of Steam Generator 134901E14 General Outline of Steam Generator 128758E1 Closure Head Service Structure Arrangement Side View 128759E2 Closure Head Service Structure Arrangement Plan View 25475F5 Pressurizer General Arrangement 136195E2 Specification Drawing Reactor Vessel Details -
Sheet 1 136196E7 Specification Drawing Reactor Vesses Details -
Sheet 2 136194E3 Specification Drawing Reactor Vessel Arrangement 136197El Specification Drawing Reactor Closure Head Details 21776-1 Plant Arrangement Fuel Handling System Elev.
21776-5 Plant Arrangement Fuel Handling System Plan E11017 Stud Tensioner Main Flange Studs I
142838E2 Assembly of Core Flooding Tank i
i i
I
Page 2 TLL 064 DRAWING NO.
DRAWING TITLE 142870E3 Control Rod Guide Details 142855El Control Rod Guide Details 126958E6 Control Rod Mechanism Housing 135844E6 RC Piping Arrangement Elev. Customer Drawing 135843E7 RC Piping Arrangement Plan Customer Drawing 133230E13 RC Piping Arrangement Plan Spec Drawing 133229E10 RC Piping Arrangement Elev Spec Drawing 2588-1 Reactor & Fuel Handling Building Fuel Transfer Tubes 180015100 20" Feedwater From R.B. Penetration to Steam Generator RC-HlA 180015000 20" Feedwater R.B. Penetration to Steam Generator RC-hlb i
l i
k