ML19322D619

From kanterella
Jump to navigation Jump to search
Operations Manual for Nuclear Power Plant Simulator, Front Page,Foreword & Index Only Encl
ML19322D619
Person / Time
Site: Crane 
Issue date: 06/07/1979
From:
BABCOCK & WILCOX CO.
To:
References
TASK-TF, TASK-TMR PROC-790607, NUDOCS 8002180044
Download: ML19322D619 (4)


Text

THE BABCOCK AND WILCOX COMPANY NUCLEAR TRAINING CENTER LYNCHBURG, VIRGINIA OPERATIO S MANUAL FOR l

NUCLEAR POWER PLANT SIMULATOR i(_,

k.

l l

This manual has been written specifically for operations of the B&W Nuclear Power Plant Simulator, hereafter identified as Old Forest Road, (OFR-Unit #1).

M 8002yyOg y

FOREWORD (C

This manual contains operating procedures for the Babcock and

(,

Wilcox Nuclear Power Plant Simulator.

The manual was prepared by the B6W Nuclear Training Center staff for the purpose of training utility operators and engineers during operator training at Lynchburg, Virginia.

Procedures contained herein are not to be used for any purpose other than tNat of training.

It i

a e

I

4 j

INDEX TO OPERATING PROCEDURES L.

(Short Course)

+

w 1102.02 Plant Heatup 1102.03 Plant Startup (Reactor-Turbine) 1102.04 Power Operation 1102.10 Plant Shutdown (Turbine-Reactor) 1102.11 Plant Cooldown 1103.04 Solubic Poison Concentration Control 1103.15 Reactivity Balance Calculation 1

1105.09 Control Rod Drive System 1106.01 Main Turbine System 1106.02 Condensate and Feedwater System 6/7/79

INDEX TO ABNORMAL AND EMERGENCY PROCEDURES (Short Course) 1202 EMERGENCY PLANT PROCEDURES 1202.01 Load Rejection

c.,

1202.02 Turbine Trip 1202.04 Reactor Trip 1202.06 Loss of Reactor Coolant /RC Pressure 1202.10 CRD Malfunction Action i

r-1202.14 Loss of Reactor Coolant Flow (RC Pump Trip)

IL i

1202.24 Steam System Rupture 1202.26 Loss of Steam Generator Feed 1202.29 Pressurizer Abnormal Operations 1203 ABNORMAL PLANT PROCEDURES 1203.01 Integrated Control System Abnormal Operation 1203.03 Operation With Less Than Four RC Pumps

~~

l I

l l

2/8/74 L