ML19322D553

From kanterella
Jump to navigation Jump to search
Requests Rescheduling of 800129 Scoping Meeting for Programmatic Eis,Due to Conflict W/Rehearing Conference of Waste Confidence Hearing Board
ML19322D553
Person / Time
Site: Crane 
Issue date: 01/17/1980
From: Lewis M
AFFILIATION NOT ASSIGNED
To: Muller D
Office of Nuclear Reactor Regulation
Shared Package
ML19322D551 List:
References
NUDOCS 8002150152
Download: ML19322D553 (1)


Text

-

Marvin I. Lewis g

6504 Bradford Terrace Phila. PA 19149 1-17-80 Daniel R. Muller Division of Site Safety and Environmental Analysis Office of nuclear Reactor Regulation Sir:

An invitation to attend a meeting on the #rogammatic EIS for the Clean up at TMI#2 was delivered today.

The date of the meeting is 1-29-80. The date on the letter is 1-14-80.

On 1-14-80, I received a letter from the PR 50,51, Waste confidence Hearing Board.

This letter of Hotice was dated 1-10-80. It announced a meeting or Prehearing Conference on 1-29-80 also 1

Jow, there is a conflict.

Bothe the PR 50, 51 and the Progan -

matic EIS are scheduling events on 1-29-80 According to the Docketing Division Stamp, the PR 50,51 Pre Hearing"$bIschdduled for 81S80 first.

Several participants in the PR 50, 51 Prehearing are also participants in the TMI#1 Docket 50-289 and have filed letters of intent to participate in the TMI#2 Programmatic EIS. These participants include, but are not limited to, Myself, ECNP, and Karen 8heldon.

The only fair solution is to reschedule the Programmatic EIS for a later date.

Your meeting was scheduled after the notice of the PR 50,51 Prehearing was sentout.

f' Marvin I. Lewis, Intervenor.

)

v/

Senator Schweker, GLB, ECNP,Coh h ad h,

I cc.:

J e

a8 soosisa lO a